Home / Browse projects / Mumbai City, Maharashtra / Fortuna Blue
Fortuna Blue
By ALLIANCE INFRACORP DEVELOPERS
RG-MH-69040 · RERA P51900018299 · Last updated on MahaRERA portal: 28 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Litigation declared, 3 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Fortuna Blue is a Residential / Group Housing project by ALLIANCE INFRACORP DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900018299 on 22 Oct 2018. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 99 of the 101 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameFortuna Blue
- TypeResidential / Group Housing
- Location
- sitaram jadhav marg
- lower parel
- Mumbai City
- 400013
- Pincode400013
- RERA no.P51900018299
- ReraGenie IDRG-MH-69040
Builder
- NameALLIANCE INFRACORP DEVELOPERS
- Entity typePartnership
- PartnersSURESH DALICHAND SETH, KAMLADEVI DALICHAND SETH, JEEVAN DALICHAND SETH, ANIL NAGRAJ MUTHA, YASH RITESH MUTHA, JAYANTILAL CHAGANLAL JAIN, PRAVIN BHAWARLAL MUTHA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Oct 2018
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed104 files
Current status
Figures as on 28 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing-B | NA | 26 | 20 | 90 | 2 | 92 |
| Wing -A | NA | 26 | 20 | 9 | 0 | 9 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
Wing-B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing -A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed70
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BN Shah & Associates |
| Architect | Sharaddha Salvi |
| Engineer | Chandrapratap Singh |
| Engineer | Ratan Kharatmol |
| Chartered Accountant | Raj Jain & Associates |
| Chartered Accountant | Kalpesh H Agarwal & Co. |
| Partner | Role in project |
|---|---|
| ALLIANCE INFRACORP DEVELOPERS | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 1918/2014 | City Civil Court | Pending for framing of issues |
| 1693/2014 | Small Causes Court | Case disposed Uncontested Without Judgment |
| 7193/2024 | Bombay High Court | Pending for hearing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Sold Details 310325- FB.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Mar 25.pdf | 21 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 March 25.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 March 2025.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-FB Dec 24.pdf | 14 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 24.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Dec 24.pdf | 14 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Details 311224- FB.pdf | 14 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank letter FB- RERA Accounts.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sep 24.pdf | 16 Oct 2024 |
| Certificates of CA (Form 3)File: Form-3-Fortuna Blue_ Sep2024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Sep 24.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Details 300624- FB.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Details 300924- FB.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 June 24.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fortuna Blue Form 1 June 24.pdf | 11 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 June 24 Alliance.pdf | 11 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf | 14 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate 2A FY 23-24- Fortuna Blue.pdf | 3 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Details 310324- FB.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Mar 24.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Mar 24.pdf | 22 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 Mar 24.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alliance Architect Certificate.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alliance Engi certificate.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: Alliance- Form 3.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Details 311223- FB.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Sep 23.pdf | 13 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 Sep 23.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sep 23- Alliance.pdf | 6 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Fortuna Blue Sold inventory 300923 RERA.pdf | 6 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 June 23 signed.pdf | 15 Jul 2023 |
| Declaration about Commencement CertificateFile: Declaration about full CC.pdf | 12 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Om Sai Ganesh- Architect's Certificate June 23.pdf | 12 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alliance- Architect's Certificate june 23.pdf | 12 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 June 23 Fortuna Blue.pdf | 12 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC upto 22 floors.pdf | 11 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site Supervisor Certificate 2A FY 22-23- Fortuna Blue.pdf | 5 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Fortuna Blue Sold inventory 300623.pdf | 5 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf | 5 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Alliance Form-5.pdf | 30 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Mar 23 signed.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Site Supervisor Certificate 2A FY 22-23- Fortuna Blue.pdf | 26 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Mar 23- Alliance.pdf | 20 Apr 2023 |
| Proforma of Agreement for saleFile: Draft Agreement for Sale- Fortuna Blue.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3 Mar 23 Fortuna Blue.pdf | 12 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Details 310323- FB.pdf | 6 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Dec 22 signed.pdf | 11 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GetUserDocumentFileContent.pdf | 6 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Dec 22 Fortuna Blue.pdf | 6 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Dec22.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22.pdf | 18 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Sep 22- Alliance.pdf | 18 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate- Quality Asurance Mar 22.pdf | 13 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Sep 22 signed.pdf | 8 Oct 2022 |
| Certificates of CA (Form 3)File: Form 3 Sep 22 Fortuna Blue.pdf | 6 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Sep 22.pdf | 3 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Separate Bank Account Declaration.pdf | 11 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate June 22 -Alliance final.pdf | 15 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf | 11 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 June 22 signed.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Alliance Infr Dev- Disclosure of Sold.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: Form 3 June 22 Fortuna Blue.pdf | 7 Jul 2022 |
| CERSAI detailsFile: CERSAI Asset Based Report.pdf | 12 May 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 11 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 060522.pdf | 10 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 1920.pdf | 10 May 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory- Till April 2022.pdf | 9 May 2022 |
| Certificates of CA (Form 3)File: Form 3 Mar 22.pdf | 2 May 2022 |
| Proforma of Allotment letterFile: Draft Agreement for Sale- Fortuna Blue.pdf | 2 May 2022 |
| Building plan approvalFile: Amended Plan Apporval Letter.pdf | 25 Apr 2022 |
| Building plan approvalFile: Revised Apporval Plan-1.pdf | 25 Apr 2022 |
| Building plan approvalFile: Revised Apporval Plan-2.pdf | 25 Apr 2022 |
| Building plan approvalFile: Revised Apporval Plan-3.pdf | 25 Apr 2022 |
| Building plan approvalFile: Revised Apporval Plan-4.pdf | 25 Apr 2022 |
| Building plan approvalFile: Revised Apporval Plan-5.pdf | 25 Apr 2022 |
| Building plan approvalFile: Revised Apporval Plan-6.pdf | 25 Apr 2022 |
| Building plan approvalFile: Revised Apporval Plan-8.pdf | 25 Apr 2022 |
| Building Plan Approval (IOD)File: Amended Plan Apporval Letter.pdf | 25 Apr 2022 |
| Building Plan Approval (IOD)File: Revised Apporval Plan-1.pdf | 25 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Fortuna Blue on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near lower parel780+ in Mumbai City
Lodha Adrina
LODHA DEVELOPERS LIMITED
7 Mahalaxmi - Tower 3
Runwal Real Estates Private Limited
7 Mahalaxmi - Tower 1
Runwal Real Estates Private Limited
RUNWAL RAAYA - TOWER 2
AETHON DEVELOPERS PRIVATE LIMITED
RUNWAL RAAYA - TOWER 1
AETHON DEVELOPERS PRIVATE LIMITED
PLUS ART
CHINTAMANI CONSTRUCTION COMPANY
See every Mumbai City project, with the district possession charts
Builder: ALLIANCE INFRACORP DEVELOPERS
ALLIANCE INFRACORP DEVELOPERS has 1 registration on MahaRERA, including Fortuna Blue. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that Fortuna Blue shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Fortuna Blue is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Fortuna Blue?
The registered promoter entity is ALLIANCE INFRACORP DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Fortuna Blue?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Fortuna Blue?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Fortuna Blue?
The professionals named in the filing: Architect: BN Shah & Associates; Architect: Sharaddha Salvi; Engineer: Chandrapratap Singh; Engineer: Ratan Kharatmol; Chartered Accountant: Raj Jain & Associates; Chartered Accountant: Kalpesh H Agarwal & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Fortuna Blue?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback