Completed No litigation declared Residential / Group Housing project

Forest Trails Highland Tower 9, 10 and 11

By PARANJAPE SCHEMES (CONSTRUCTION) LIMITED

RG-MH-01802 · RERA P52100000067 · Last updated on MahaRERA portal: 8 Apr 2025

Source: official MahaRERA filing

Red flags

  • 12 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
25 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 95%
12Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Forest Trails Highland Tower 9, 10 and 11 is a Residential / Group Housing project by PARANJAPE SCHEMES (CONSTRUCTION) LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100000067 on 22 Jun 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. The completion date has moved by 24 months from the original filing. 12 complaints are on record with the regulator.

At a glance

Project

  • NameForest Trails Highland Tower 9, 10 and 11
  • TypeResidential / Group Housing
  • Location
    • Bhugaon Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000067
  • ReraGenie IDRG-MH-01802

Builder

  • NamePARANJAPE SCHEMES (CONSTRUCTION) LIMITED
  • Entity typeCompany
  • DirectorsSHRIKANT PARANJAPE, SHRIKANT PARANJAPE
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects5 →

Key dates

this monthRegisteredJun 2017First promiseDec 2022Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Jun 2017
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 9NA190000
Tower 10NA190000
Tower 11NA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.

Tower 9100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 1097%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Tower 1190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises42%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities18

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes82%
Water SupplyYes92%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes92%
Landscaping & Tree PlantingYes81%
Street LightingYes91%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes80%
Open ParkingNoNot applicable
SWIMMING POOLYes95%
MULTI PURPOSE HALLYes100%
CLUB HOUSEYes95%

Parking filed400

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots400
Closed/Covered400
BuildingClosed/CoveredTotal
Tower 9115115
Tower 10170170
Tower 11115115

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,629 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI25496.1
Proposed, not sanctioned25,496 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
PARANJAPE SCHEMES (CONSTRUCTION) LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016710Dec 2022 → Dec 2024

Reason as filed by the promoterIn accordance with Oder no 40 dated 27/12/2022 we are applying for Extension without majority consents of the allotees The aforementioned project has received adequate funding from “IDBI Trusteeship Services Limited as Debenture Trustee” (Wherein SWAMIH Investment fund is an investor which is a private trust registered under SEBI acting through its trustee SBICAP trustee company limited and is a special window in the form of AIF to provide priority debt financing for completion of RERA Registered Residential projects), as substantiated by the relevant financial documentation. However, the disb

EXT52100012205Dec 2022 → Dec 2023

Reason as filed by the promoterInvoking force majeure due to outbreak of pandemic and consequent periodic nationwide lock downs from March 2020 have caused disruption of supply chains for obtaining construction material ,labour work force migration and has impacted the pace of the construction activity adversely. Rising input costs, limited support from Banks have impacted the cash flow resulting into significant slowdown of construction .The aforementioned impediments have affected regular development of the real estate project”

Litigation declared3

CaseCourtStatus
1480/11/2011CJJD PUNEThe matter is kept for filing Evidence Affidavit
186/2018/2018Civil Judge Senior Division Pune Matter is kept for framing issues
593/2018/2018Civil Judge Junior Division PuneApplicant has taken steps for issue of summons Report awaitded

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC005000000208247GITANJALI Ramrao JOGDANDEParanjape schemes sales office07/02/2023
CC005000000228491Parimal Purushottam DeshpandeParanjape Schemes (Construction) Limited12/03/2023
CC005000000279776Ritvij Pramodchandra GandaguleMr Shashank Paranjape25/12/2023
CC005000000279790Ravindra Digambar DeshpandeParanjape Schemes (Construction) Limited06/12/2023
CC005000000279830MANDAR BHATU BORSEPARANJAPE SCHEMES CONSTRUCTION LIMITED13/12/2023
CC005000000289981Pawan KawadeParanjape Schemes Construction Limited03/01/2024
CC005000000340822Shrinath Vamanrao KulkarniParnajape Schemes Construction Limited27/04/2024
CC005000000370983Shrikant Madhukar JoshiParanjape Schemes (Construction) Ltd22/05/2024
CC005000000471509RAHUL KULKARNISHASHANK PARANJAPE10/08/2024
CC12400048Ravindran DoddannavarPARANJAPE SCHEMES (CONSTRUCTION) LIMITED06/09/2024
CC12504104Manish TumbdePARANJAPE SCHEMES (CONSTRUCTION) LIMITED21/11/2025
CC12500656MANISH PURUSHOTTAM BHATPARANJAPE SCHEMES (CONSTRUCTION) LIMITED24/02/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jan 2025

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-FT T-91011-MAR'25-uploaded.pdf8 Apr 2025
Certificates of CA (Form 3)File: FORM 3-FTHighland T-91011-SepT'24-uploaded.pdf8 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Highlands T91011- recd uploaded on 07 Jan'25.pdf28 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -FT The Highland T91011-Dec'24-uploaded.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Highland T-9 10-11-Dec'24-uplaoded.pdf15 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Highlands T91011-uploaded.pdf8 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: T11 - Completion - 31Dec 24-uploaded.pdf8 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FT T9 COMPLETION-27SEP'24.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FT T10 Completion-16Dec'24.pdf23 Dec 2024
Certificates of CA (Form 3)File: form 3-FT 91011-Jan'24-uploaded.pdf18 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Highlands T-91011-Sept'24-uploaded.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-FTHighland T-91011-Sept'24-uploaded.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-FT91011-FY '23-24-uploaded.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure-sod-unsold FTHighland T-91011-June'24-uploaded.pdf20 Jul 2024
Layout approvalFile: Layout Plan-June'24-compressed-uplaoded.pdf9 Jul 2024
Building plan approvalFile: Building Plan Approval-FT 91011-compressed-June'24-uploaded.pdf9 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout Plan-June'24-compressed-uplaoded.pdf9 Jul 2024
Building Plan Approval (IOD)File: Building Plan Approval-FT 91011-compressed-June'24-uploaded.pdf9 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement FT 91011-21June'24-uploaded.pdf9 Jul 2024
Declaration about Commencement CertificateFile: FORMAT D-Declarn about Commencement-uploaded.pdf9 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 23FORM 2- FT Highland T-91011-June'24-uploaded.pdf8 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 FT Highlands T-91011-FORM 1-June'24-uploaded.pdf4 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 FT Highland T-91011-FORM 2A-June'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Report-Highland T-91011-Mar'24-uploaded.pdf17 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-FT 91011-Mar'24-uploaded.pdf6 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-FT HIGHLAND TOWER 91011-Mar'24-uploaded.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-Highlands T91011-Mar'24-uploaded.pdf1 Apr 2024
Disclosure of sold/ booked inventoryFile: 8 FT T-910 11-Disclosure-Dec'23-uploaded.pdf11 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-FTHighlands T-91011-Dec'23-uplaoded.pdf10 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Highland Tower 91011-Dec'23-uplaoded.pdf10 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A DEC 2023 T91011-uplaoded.pdf10 Jan 2024
Certificates of CA (Form 3)File: FORM 3-F T 91011 of Sept-uplaoded on 10Jan'24.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: tower 9 10 11 Circular 29 (1).pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Forest Trails The Highland T-91011-Sept'23-uploaded.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5- FT Highland Tower 91011-Fy'22-23.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory data-Forest Trails Highland T91011-Sept'23-uploaded.pdf10 Oct 2023
Certificates of CA (Form 3)File: FORM 3-CA Certificate-FT 9,10,11 dt 26June 2023.pdf7 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Highlands T-91011-Sept'23.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 A SEPT 23 T91011-Uploaded.pdf3 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Highlands T- 9,10, 11-uplaoded.pdf11 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Highland Tower 91011-June'23.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FT91011 June 23.pdf7 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Highlands T-9 10 11.pdf3 Jun 2023
Details of encumbrancesFile: Encumbrances Letter-Financial Dues- FT 9,10,11.pdf26 May 2023
Declaration about Commencement CertificateFile: FORMAT D Highland T 9 10 11.pdf26 May 2023
Declaration in FORM BFile: FORM B -Affidavit-FT T 9,10,11.pdf26 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A -FT T 9,10,11.pdf26 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19 FORM 2-Forest Trails the Highland Tower 91011-Mar 23.pdf19 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Highlands T91011-RERA Form-1-Mar 23-uploaded.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FT T91011-FORM 5-FY 21-22-uploded 03 Feb2023.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Highlands T 91011 - 2017 -2021.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Highlands T 91011 -March 2022.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Highlands T 91011-June 2022.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Highlands T 91011-Dec-2022.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20180326 FT 9,10,11 FORM-1 FOR RERA.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 FT 9 10 11 Form 1-June 18 to Mar 18 Compressed merged-uploaded.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 FT 9 1011 -FORM 1-Jne 19 Dec 19 merged and compressed-uploaded.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2021-04-29 Highlands T9 10 11-RERA Form1.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FT Athashri-B2 RERA Form-1-Sept 2022.pdf25 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 FT 9 10 11- FORM 2-Sept 17 to mar 18-merged -compressed.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 FT 9 10 11 -FORM 2-June 18 to Mar 19-merged and compressed.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 FT 9 1011 -FORM 2-June 19 to mar 21-merged and compressed.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Ft 9 10 11 -FORM 2-June 21 to Dec21-merged and compressed.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 FT 9 10 11-FORM2 -T91011-Mar 22-uploaded.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 FT 9 10 11 FORM2 --Sep 22-uploaded.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Ft 9 10 11 -FORM2 -Dec 22-uplaoded.pdf23 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Highlands T9 10 11 Qurter ending Sept 2022.pdf28 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Forest Trails T9 10 11 Form 5 18-19.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure Report June 2022.pdf18 Jul 2022
CERSAI detailsFile: CERSAI Report HDFC.pdf15 Jul 2022
CERSAI detailsFile: CERSAI Report IDBI Trusteeship.pdf15 Jul 2022
CERSAI detailsFile: CERSAI Report IDBI TShip.pdf15 Jul 2022
Declaration about Commencement CertificateFile: Format D Declration about commencement.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2 1JUNE SEPT 2019.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2 2 DEC2019 MARCH 2020.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3 2FT 9 10 11 DEC 2020 MARCH 2021.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 4 2 DEC 2021 MARCH 2022.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 5 FT 9 10 11 FORM2A upto June2022.pdf14 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FT Highlands 9,10,11-min_compressed.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 FT Highlands 9,10,11-min_compressed.pdf13 Jul 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Athashri - B1 R18S NO 16 AND OTHERS OPP MANAS LAKE BEHIND NIXIA LOGISTIC BHUGAON PUNE 412 115275CompletedMar 2017Mar 2016
T1-T6S NO 16 AND OTHERS OPP MANAS LAKE BEHIND NIXIA LOGISTIC BHUGAON PUNE 412 115528CompletedMar 2016Feb 2016
Servants QuartersS NO 16 AND OTHERS OPP MANAS LAKE BEHIND NIXIA LOGISTIC BHUGAON PUNE 412 11536CompletedMar 2016Late, May 2016
PebblesS NO 16 AND OTHERS OPP MANAS LAKE BEHIND NIXIA LOGISTIC BHUGAON PUNE 412 115315CompletedNov 2015Late, Aug 2016
Shopping MallS NO 16 AND OTHERS OPP MANAS LAKE BEHIND NIXIA LOGISTIC BHUGAON PUNE 412 11521CompletedMar 2015Late, Sep 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Forest Trails Highland Tower 9, 10 and 11 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

2 kmForest Trails Highland TCompleted 15Lapsed / revoked 9Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: PARANJAPE SCHEMES (CONSTRUCTION) LIMITED

PARANJAPE SCHEMES (CONSTRUCTION) LIMITED has 3 registrations on MahaRERA, including Forest Trails Athashri - B2 and Forest Trails Highland Tower 7 and 8. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Forest Trails Highland Tower 9, 10 and 11 is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Forest Trails Highland Tower 9, 10 and 11?

The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Forest Trails Highland Tower 9, 10 and 11?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Forest Trails Highland Tower 9, 10 and 11?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Forest Trails Highland Tower 9, 10 and 11?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Forest Trails Highland Tower 9, 10 and 11?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Forest Trails Highland Tower 9, 10 and 11. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Forest Trails Highland Tower 9, 10 and 11 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.