FLORADALE SECTOR 17

By DISPLAY TRIX

RG-MH-94782 · RERA P52100054580 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 2Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

FLORADALE SECTOR 17 is a Plotted project by DISPLAY TRIX in Pune, Maharashtra, registered with MahaRERA as P52100054580 on 31 Jan 2024. Possession is promised by 31 Dec 2027. 2 of the 2 units on this registration are recorded sold or booked.

At a glance

Project

  • NameFLORADALE SECTOR 17
  • TypePlotted
  • Location
    • AT VILLAGE KASARAMBOLI
    • KASARAMBOLI
    • Kasar Amboli
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100054580
  • ReraGenie IDRG-MH-94782

Builder

  • NameDISPLAY TRIX
  • Entity typePartnership
  • PartnerSONALI SACHIN AGARWAL
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed82 files

Current status

100%2 of 2 units booked

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area710 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on18 Sep 2024

Approvals and building plan

Sanctioning authorityPMRDA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 1185, 13, 929, Fergusson College Rd, opposite Hotel Lalit Mahal, Shivajinagar, Pune,

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND PANCHAL AND ASSOCIATES
ArchitectINSIGNIS ARCHITECTURE
EngineerRajesh Chaudhari
Chartered AccountantAGRAWAL OSWAL AND ASSOCIATES
Chartered AccountantAGRAWAL AND OSWAL ASSOCIATES
Chartered AccountantShweta Agrawal
PartnerRole in project
DISPLAY TRIX-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sec 17 Architect Cert Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Sec 17 Engineer Certifcate.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3 SECTOR 17-Q4-25-26 (2).pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Form2 A 17.pdf17 Apr 2026
Withdrawal Update Form 1File: Sec 17 Architect Cert Q3.pdf16 Jan 2026
Withdrawal Update Form 2File: Sector 17 Engineer Certificate Q3.pdf16 Jan 2026
Withdrawal Update Form 3File: FORM 3 SECTOR 17-Q3-25-26.pdf16 Jan 2026
Withdrawal Update Form 1File: Sec-17 Architect Certificate.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM3 SECTOR 17-Q2-25-26.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM3 SECTOR 17-Q2-25-26.pdf18 Oct 2025
Form 1File: Architect Certificate S 17.pdf23 Aug 2025
Form 2File: Engineer Certificate S 17.pdf23 Aug 2025
Form 3File: Form 3 Sec 17.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List S 17.pdf23 Aug 2025
Form 1File: architect certificate sec 17.pdf23 Aug 2025
Form 2File: Engineer certificate.pdf23 Aug 2025
Form 3File: Form 3 sec 17 q4.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold List Sec 17.pdf23 Aug 2025
Form 1File: Architect Certificate Mar.pdf25 Jul 2025
Form 2File: Engineer certificate mar 24.pdf25 Jul 2025
Form 3File: FORM3 SECTOR17 Mar.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List Sec 17 Mar 24.pdf25 Jul 2025
Form 1File: Architect Certificate Jun.pdf25 Jul 2025
Form 2File: Engineer certificate Jun24.pdf25 Jul 2025
Form 3File: DISPLAY TRIX June 2024.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List Sec 17.pdf25 Jul 2025
Form 1File: Architect Sector 17.pdf25 Jul 2025
Form 2File: Engineer Certificate Sec 17.pdf25 Jul 2025
Form 3File: FORM 3 SECTOR 17.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List.pdf25 Jul 2025
Form 5 (FY 2023-2024)File: Sector 17-23-24.pdf25 Jul 2025
Form 5 (FY 2024-2025)File: Sector 17-24-25-4.pdf25 Jul 2025
Withdrawal Update Form 1File: Architect Certificate Sector 17.pdf24 Jul 2025
Withdrawal Update Form 2File: Eng Certificate Sector 17.pdf24 Jul 2025
Withdrawal Update Form 3File: FORM3 SECTOR 17 05072025.pdf24 Jul 2025
Form 2A (FY 2023-2024)File: Display Trix 2023-2024 Sec 17.pdf24 Jul 2025
Form 2A (FY 2024-2025)File: Dispaly Trix 2024-2025 Sec 17.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Sector 17.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate sec 17.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sec 17.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sec 17.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold List Sec 17.pdf21 Apr 2025
Layout approvalFile: Sector 17 Gat no 834 Area 710_compressed.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: Sector 17 Gat no 834 Area 710_compressed.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate S 17.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate S 17.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List S 17.pdf23 Nov 2024
PAN CardFile: Updated PAN card - Display Trix LLP.pdf23 Oct 2024
Other - LegalFile: Approval Mail From Legal Dept.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sector 17 Previous form 3 - mar 24.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sector 17 Current form 3 - jun 24.pdf9 Aug 2024
Declaration in FORM BFile: SEC 17.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Mar.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jun.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate mar 24.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Jun24.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List Sec 17 Mar-24.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List Sec 17.pdf20 Jul 2024
Other - TechnicalFile: Sector 17.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 SECTOR17_page-0001.pdf11 Dec 2023
Other - LegalFile: Index II.pdf29 Nov 2023
Other - LegalFile: Partnership deed_compressed (1).pdf27 Nov 2023
Declaration about Commencement CertificateFile: Declaration About Commencement NEW.pdf22 Nov 2023
Declaration in FORM BFile: Sector 17 form B.pdf22 Nov 2023
Layout approvalFile: Gat no 834 Layout.pdf11 Nov 2023
Building plan approval or NA orderFile: GAT NO 834 NA.pdf11 Nov 2023
PAN CardFile: display trix pan.pdf11 Nov 2023
Copy of the legal title reportFile: sector 17 legal.pdf11 Nov 2023
Details of encumbrances concerned to FinanceFile: ENCUMBERANCE LETTERLEGALfinance.pdf11 Nov 2023
Details of encumbrances concerned to LegalFile: ENCUMBERANCE LETTERLEGALfinance.pdf11 Nov 2023
Copy of Layout Approval (in case of layout)File: Gat no 834 Layout.pdf11 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: GAT NO 834 NA.pdf11 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: GAT NO 834 CC.pdf11 Nov 2023
CERSAI detailsFile: CERSAI DECLARATION.pdf11 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sonali.pdf11 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Arti.pdf11 Nov 2023
Proforma of Agreement for saleFile: Agreement - draft.pdf11 Nov 2023
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf11 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for Real Estate Projects.pdf11 Nov 2023

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLORADALE SECTOR 17 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASARAMBOLI13,700+ in Pune

Builder: DISPLAY TRIX

DISPLAY TRIX has 4 registrations on MahaRERA, including FLORADALE SECTOR 15 and FLORADALE SECTOR 16. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if FLORADALE SECTOR 17 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORADALE SECTOR 17?

The registered promoter entity is DISPLAY TRIX, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORADALE SECTOR 17?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORADALE SECTOR 17?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORADALE SECTOR 17?

The professionals named in the filing: Architect: MILIND PANCHAL AND ASSOCIATES; Architect: INSIGNIS ARCHITECTURE; Engineer: Rajesh Chaudhari; Chartered Accountant: AGRAWAL OSWAL AND ASSOCIATES; Chartered Accountant: AGRAWAL AND OSWAL ASSOCIATES; Chartered Accountant: Shweta Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORADALE SECTOR 17?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORADALE SECTOR 17. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORADALE SECTOR 17 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.