ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / FLORADALE SECTOR 10

Completed No litigation declared Plotted project

FLORADALE SECTOR 10

By PUNE WEST PROPERTIES AND DEVELOPMENTS

RG-MH-85280 · RERA P52100053788 · Last updated on MahaRERA portal: 9 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
0 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

FLORADALE SECTOR 10 is a Plotted project by PUNE WEST PROPERTIES AND DEVELOPMENTS in Pune, Maharashtra, registered with MahaRERA as P52100053788 on 30 Nov 2023. The registration is recorded completed; possession was promised by 31 Dec 2027. 12 of the 12 units on this registration are recorded sold or booked.

At a glance

Project

  • NameFLORADALE SECTOR 10
  • TypePlotted
  • Location
    • OFF PAUD ROAD
    • KASARAMBOLI
    • Kasar Amboli
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100053788
  • ReraGenie IDRG-MH-85280

Builder

  • NamePUNE WEST PROPERTIES AND DEVELOPMENTS
  • Entity typePartnership
  • PartnerAYUSH SATISH AGARWAL
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Nov 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed90 files

Current status

100%12 of 12 units booked

Figures as on 9 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Jun 2025

Approvals and building plan

Sanctioning authorityPMRDA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB U Bhandari Premises 1182 13 Fc Road Opp Hotel Lalit Mahal Punemaharashtra411005

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND PANCHAL AND ASSOCIATES
ArchitectInsignis Architect
EngineerRajesh Chaudhari
EngineerDharmesh Agarwal
Chartered AccountantAGRAWAL OSWAL AND ASSOCIATES
Chartered AccountantShweta Agrawal
PartnerRole in project
PUNE WEST PROPERTIES AND DEVELOPMENTS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Sec 10 Form 2A.pdf9 Apr 2026
Withdrawal Update Form 1File: Sec 10 Architect Cert Q4.pdf8 Apr 2026
Withdrawal Update Form 2File: Sec 10 Engineer Cert Q4.pdf8 Apr 2026
Withdrawal Update Form 3File: SECTOR 10-25-26.pdf8 Apr 2026
Withdrawal Update Form 1File: Sec 10 Architect Cert Q4.pdf4 Apr 2026
Withdrawal Update Form 1File: Sec 10 Architect Cert Q4.pdf4 Apr 2026
Withdrawal Update Form 2File: Sec 10 Engineer Cert Q4.pdf4 Apr 2026
Withdrawal Update Form 2File: Sec 10 Engineer Cert Q4.pdf4 Apr 2026
Withdrawal Update Form 3File: SECTOR 10-25-26.pdf4 Apr 2026
Withdrawal Update Form 3File: SECTOR 10-25-26.pdf4 Apr 2026
Withdrawal Update Form 1File: Sector 10 Architect Certificate Q3.pdf12 Jan 2026
Withdrawal Update Form 2File: Sector 10 Engineer Certificate.pdf12 Jan 2026
Withdrawal Update Form 3File: FORM 3 SECTOR 10-Q2-25-26.pdf12 Jan 2026
Withdrawal Update Form 1File: Sec 10 Architect Certificate.pdf9 Oct 2025
Withdrawal Update Form 1File: Sec 10 Architect Certificate.pdf9 Oct 2025
Withdrawal Update Form 2File: Sec-10 Engineer Certificate.pdf9 Oct 2025
Withdrawal Update Form 2File: Sec-10 Engineer Certificate.pdf9 Oct 2025
Withdrawal Update Form 3File: FORM 3 SECTOR 10-Q2-25-26.pdf9 Oct 2025
Withdrawal Update Form 3File: FORM 3 SECTOR 10-Q2-25-26.pdf9 Oct 2025
Form 1File: Architect Jun.pdf2 Aug 2025
Form 2File: Engineer certificate JUN.pdf2 Aug 2025
Form 3File: Form 3 Sec 10.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List.pdf2 Aug 2025
Form 1File: Architect certificate Dec 24.pdf2 Aug 2025
Form 2File: Engineer Certificate Sec 10.pdf2 Aug 2025
Form 3File: Form 3 Sec 10.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold list.pdf2 Aug 2025
Form 1File: Architect Certificate.pdf2 Aug 2025
Form 2File: Engineer certificate.pdf2 Aug 2025
Form 3File: Form 3.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List.pdf2 Aug 2025
Form 1File: Architect Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate sector 10.pdf28 Jul 2025
Form 3File: FORM3 SECTOR 10.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold List.pdf28 Jul 2025
Form 1File: Architect MAR.pdf28 Jul 2025
Form 2File: Engineer certificate Mar.pdf28 Jul 2025
Form 3File: FORM3 SECTOR 10.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List Mar.pdf28 Jul 2025
Form 1File: architect Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate Sec 10.pdf28 Jul 2025
Form 3File: SECTOR 10 form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf28 Jul 2025
Withdrawal Update Form 1File: Architect Certificate Sector 10.pdf25 Jul 2025
Withdrawal Update Form 2File: Eng Certificate Sector 10.pdf25 Jul 2025
Withdrawal Update Form 3File: Form 3 Sec 10.pdf25 Jul 2025
Form 5 (FY 2023-2024)File: SECTOR-10-23-24.pdf25 Jul 2025
Form 5 (FY 2024-2025)File: SECTOR-10-24-25.pdf25 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A (24).pdf22 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A (25).pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Dec 24.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect sec 10.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sec 10.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sec 10.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SoldUnsold.pdf19 Apr 2025
Layout approvalFile: Sector 10 Gat no 844 Area 1800_compressed.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: Sector 10 Gat no 844 Area 1800_compressed.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Certificate.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SECTOR 10 form 3.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificae.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect MAR.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Jun.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Mar.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate JUN.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List Mar.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf20 Jul 2024
Other - LegalFile: PWPD Partnership deed.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 SECTOR-10.pdf6 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for Real Estate Projects.pdf6 Nov 2023
Copy of the legal title reportFile: sector10 legal.pdf1 Nov 2023
Declaration in FORM BFile: Form B.pdf1 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Navin.pdf1 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sachin.pdf1 Nov 2023
Proforma of Agreement for saleFile: Agreement - draft.pdf1 Nov 2023
Other - LegalFile: Index II.pdf1 Nov 2023
Layout approvalFile: Gat no 844 Layout.pdf30 Oct 2023
Building plan approval or NA orderFile: Gat 844 NA order.pdf30 Oct 2023
PAN CardFile: Pune west.pdf30 Oct 2023
Details of encumbrances concerned to FinanceFile: ENCUMBERANCE LETTER LEGAL finance.pdf30 Oct 2023

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLORADALE SECTOR 10 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASARAMBOLI13,700+ in Pune

Builder: PUNE WEST PROPERTIES AND DEVELOPMENTS

PUNE WEST PROPERTIES AND DEVELOPMENTS has 5 registrations on MahaRERA, including FLORADALE SECTOR 9 and FLORADALE SECTOR 10. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if FLORADALE SECTOR 10 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORADALE SECTOR 10?

The registered promoter entity is PUNE WEST PROPERTIES AND DEVELOPMENTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORADALE SECTOR 10?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORADALE SECTOR 10?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORADALE SECTOR 10?

The professionals named in the filing: Architect: MILIND PANCHAL AND ASSOCIATES; Architect: Insignis Architect; Engineer: Rajesh Chaudhari; Engineer: Dharmesh Agarwal; Chartered Accountant: AGRAWAL OSWAL AND ASSOCIATES; Chartered Accountant: Shweta Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORADALE SECTOR 10?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORADALE SECTOR 10. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORADALE SECTOR 10 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.