ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / FLORA KALPANA

Registered No litigation declared Residential / Group Housing project

FLORA KALPANA

By IMAGE SPACE INCORPORATED

RG-MH-05725 · RERA P52600076653 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
35 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

FLORA KALPANA is a Residential / Group Housing project by IMAGE SPACE INCORPORATED in Solapur, Maharashtra, registered with MahaRERA as P52600076653 on 20 Jun 2024. Possession is promised by 30 Apr 2027. 0 of the 35 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameFLORA KALPANA
  • TypeResidential / Group Housing
  • Location
    • HOTAGI ROAD
    • MAJAREWADI
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413003
  • Pincode413003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600076653
  • ReraGenie IDRG-MH-05725

Builder

  • NameIMAGE SPACE INCORPORATED
  • Entity typeOthers
  • GSTIN27AHSPR3882L2ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ProprietorGAURISHANKAR SHIVSHARAN RUGGE Rugge
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2024PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

0%0 of 35 units booked
58.8%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FLORA KALPANANA8735035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

FLORA KALPANA: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered13
Open Space10

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area871 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 May 2025
LandownerVillageDistrict
KALPANA FLAT OWNERS SAHAKARI HSG SOCIETY MARYADITSolapur (M Corp.)Solapur

Approvals and building plan

Sanctioning authoritySMC Solapur
Permissible FSI3103.47
Proposed, not sanctioned2,643 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBLOCK NO 1, SHRIKANT NAGAR CHS, BHARATI VIDYAPITH, BIJAPUR ROAD, SOLAPUR DIST SOLAPUR 413004
Estimated costRs 8.00 cr
Cost incurredRs 4.70 cr
Work done58.75%
BuildingWingEstimatedIncurred
FLORA KALPANANARs 7.50 crRs 4.70 cr
-NARs 50.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUPALI A BHANGE
EngineerDATTA CHANDRAKANT HONMUTE
Chartered AccountantM G MALU
PartnerRole in project
IMAGE SPACE INCORPORATED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARCH Kalpana Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 ARCH Kalpana Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 engg Kalpana Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 engg Kalpana Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: FORM 3 CA KALPANA MAR 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: FORM 3 CA KALPANA MAR 2026.pdf17 Apr 2026
Form 2A (FY 2026-2027)File: Form 2A Engg Kalpana Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARCH FLORA KALPANA DEC 25.pdf19 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGG FLORA KALPANA DEC 25.pdf19 Jan 2026
Withdrawal Update Form 3File: FOEM 3 FLORA KALPANA DEC 25.pdf19 Jan 2026
Withdrawal Update Form 1File: FORM 1 KALPANA.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2 KALPANA.pdf16 Oct 2025
Withdrawal Update Form 3File: FOEM 3 KALPANA.pdf16 Oct 2025
Commencement certificateFile: KALPANA BUILDING PERMISSION CERTIFICATE.pdf17 Jul 2025
Withdrawal Update Form 1File: FORM 1.pdf17 Jul 2025
Withdrawal Update Form 1File: FORM 1.pdf17 Jul 2025
Withdrawal Update Form 1File: FORM 1.pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2 JUNE 25 KALPANA.pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2 JUNE 25 KALPANA.pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2 JUNE 25 KALPANA.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 AT THE TIME REG KALPANA.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 AT THE TIME REG KALPANA.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 JUNE 25 KALPANA.pdf17 Jul 2025
Form 2A (FY 2025-2026)File: FORM 2A KALPANA 25-26.pdf14 Jun 2025
Form 2A (FY 2024-2025)File: FORM 2A KALPNA 24-25.pdf12 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5 FLORA KALPANA.pdf11 Jun 2025
Disclosure for secured/unsecured finance availed for the projectFile: finance.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARC KALPANA MAR 25.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 25 KALPANA.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG MAR 25 KALPANA.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MAR 25 KALPANA.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KALPANA FORM 1 ARC.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KALPANA FORM 3.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KALPANa Form 2 Engg.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: KALPANA UNSOLD SOLD.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: KALPANA FORM 2A ENGG.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARC.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA KALPANA.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG KALPANA.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FLORA KALPANA.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: kalpana sold unsold.pdf12 Jun 2024
Proforma of Agreement for saleFile: Agreement to Sale Draft.pdf30 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaraition Abount Separate Bank Account format A.pdf28 May 2024
Declaration in FORM BFile: FORM B IMAGE.pdf25 May 2024
Building plan approvalFile: KALPANA BUILDING PLAN.pdf23 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KALPANA BUILDING PLAN.pdf23 May 2024
Declaration about Commencement CertificateFile: Declaration CC.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration cum undertaking.pdf23 May 2024
Copy of the legal title reportFile: Search Report flora Kalpana.pdf20 May 2024
Layout approvalFile: LAYOUT.pdf11 May 2024
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 KALPANA.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG KALPANA.pdf11 May 2024
PAN CardFile: PAN CARD.PDF9 May 2024
Details of encumbrances concerned to FinanceFile: Declaration about legal.pdf9 May 2024
Details of encumbrances concerned to FinanceFile: Declaration about Finance.pdf9 May 2024
Details of encumbrances concerned to LegalFile: Declaration about legal.pdf9 May 2024
Details of encumbrances concerned to LegalFile: Declaration about Finance.pdf9 May 2024
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION CERTIFICATE.pdf9 May 2024
CERSAI detailsFile: Undertaking about Cersai Kalpana.pdf9 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of real estate organization kalpana.pdf9 May 2024
Proforma of Allotment letterFile: Allotment LETTER.pdf9 May 2024
Deviation Report with respect to Allotment letterFile: Deviation about ALLOTMENT LETTER.pdf9 May 2024
Deviation Report with respect to model copy of AgreementFile: deviation for payment schedule.pdf9 May 2024
Other - LegalFile: INDEX DEVELOPMENT AGREEMENT.pdf9 May 2024
Other - LegalFile: INDEX POA.pdf9 May 2024
Other - LegalFile: Undertaking for proprietorship.pdf9 May 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Flora IconP52600048657MAJAREWADI, Solapur21Jan 2023CompletedOct 2026Aug 2024
Flora GrandviewP52600048738MAJAREWADI, Solapur36Jan 2023CompletedOct 2026May 2024
Flora GalaxiaP52600022162NEAR IMS SCHOO, JULE SOLAPUR, MAJAREWADI, SOLAPUR, Solapur-Sep 2019CompletedJul 2026Aug 2022

How this compares with Solapur

0%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep FLORA KALPANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAJAREWADI550+ in Solapur

2 kmFLORA KALPANACompleted 21Lapsed / revoked 17Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: IMAGE SPACE INCORPORATED

IMAGE SPACE INCORPORATED has 5 registrations on MahaRERA, including FLORA GALAXIA and FLORA GRANDVIEW. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if FLORA KALPANA is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORA KALPANA?

The registered promoter entity is IMAGE SPACE INCORPORATED, an others as per the filing. Its GSTIN 27AHSPR3882L2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORA KALPANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORA KALPANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORA KALPANA?

The professionals named in the filing: Architect: RUPALI A BHANGE; Engineer: DATTA CHANDRAKANT HONMUTE; Chartered Accountant: M G MALU. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORA KALPANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORA KALPANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORA KALPANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.