Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput
RG-MH-21889 · RERA P50500046837 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 33 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput is a Plotted project by Pralhad Narayan Ashtankar in Nagpur, Maharashtra, registered with MahaRERA as P50500046837 on 14 Sep 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 33 months from the original filing. 12 of the 28 units on this registration are recorded sold or booked.
At a glance
Project
- NameFinal Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput
- TypePlotted
- Location
- Kh No 106 Mouza Kothewada
- Kothewada
- Hingna
- Nagpur
- 441122
- Pincode441122
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500046837
- ReraGenie IDRG-MH-21889
Builder
- NamePralhad Narayan Ashtankar
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Sep 2022
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2023)
- BuildingsNot stated in filing
- Documents filed103 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 92% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Prahlad Ashtankar | Kothewada | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 1.00 cr | Rs 76.15 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ankit Deepak Ashtankar |
| Engineer | Devang Rathod |
| Chartered Accountant | Khanzode & Shenwai |
| Chartered Accountant | Rakesh Thakre & Co |
| Chartered Accountant | A M DABKE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Pralhad Narayan Ashtankar | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere is a delay in installation of Sewage Treatment Plant (STP) which will require 7 to 8 months to complete.
Reason as filed by the promoterSTP WORK IS PENDING WHICH WILL TAKE AROUND 6 MONTHS OF TIME TO COMPLETE. OTHER LAYOUT DEVELOPMENT WORK WILL ALSO TAKE 3 MONTHS TO COMPLETE HENCE THE EXTENSION IS REQUIRED. CPM PERT HAS BEEN ATTACHED HEREWITH.
Reason as filed by the promoterOur work is complete and only the STP work was pending which is now complete. Only the necessary approvals from NMRDA are pending.Further we will Obtain final CC for closing the project before 30 th September 2026.Lastly, we will Complete the project with MahaRera with all clearances and necessary formalities before 30 th September 2026
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate position as on 30Jun26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate position as on 30Jun26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Position As on 30Jun26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Position As on 30Jun26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Vishwanath.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Vishwanath.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Q4.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Q4.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate Q3 25-26.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Q3 25-26.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate Qtr 2 FY 25-26.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Eng Certificate Qtr 2 FY 25-26.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Q2 FY 25-26.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Q1 FY 25-26.pdf | 4 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Q1 FY 25-26.pdf | 4 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Q1 FY 25-26.pdf | 4 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Q1 FY 25-26.pdf | 4 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf | 4 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf | 4 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A.pdf | 29 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 26 Sep 2025 |
| Form 1File: Form 1 Architects Certificate.pdf | 18 Jun 2025 |
| Form 2File: Form 2 Engineers Certificate.pdf | 18 Jun 2025 |
| Form 3File: Form 3 CA Certificate.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold n unsold Inventory as 15125.pdf | 18 Jun 2025 |
| OthersFile: Extension Documents merged.pdf | 18 Jun 2025 |
| Form 1File: Form 1 Architect Certificate.pdf | 12 Jun 2025 |
| Form 2File: Form 2 Engineer Certificate.pdf | 12 Jun 2025 |
| Form 3File: Form 3 CA Certificate.pdf | 12 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and unsold Inventory.pdf | 12 Jun 2025 |
| Form 1File: FORM1 Q1 23 24 VD.pdf | 4 Jun 2025 |
| Form 2File: FORM2 Q1 23 24 VD.pdf | 4 Jun 2025 |
| Form 3File: FORM3 Q1 23 24 VD.pdf | 4 Jun 2025 |
| Form 1File: FORM1 Q2 23 24 VD.pdf | 4 Jun 2025 |
| Form 2File: FORM2 Q2 23 24 VD.pdf | 4 Jun 2025 |
| Form 3File: FORM3 Q2 23 24 VD.pdf | 4 Jun 2025 |
| Form 1File: FORM1 Q3 23 24 VD.pdf | 4 Jun 2025 |
| Form 2File: FORM2 Q3 23 24 VD.pdf | 4 Jun 2025 |
| Form 3File: FORM3 Q3 23 24 VD.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Q3.pdf | 4 Jun 2025 |
| Form 1File: FORM1 Q4 23 24.pdf | 4 Jun 2025 |
| Form 2File: FORM 2 Q4 23 24.pdf | 4 Jun 2025 |
| Form 3File: Form 3 23 24 Q4.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4.pdf | 4 Jun 2025 |
| Form 1File: Architect Certificate 2024-2025 Q1.pdf | 4 Jun 2025 |
| Form 2File: Engineer Certificate 2024-2025 Q1.pdf | 4 Jun 2025 |
| Form 3File: Form 3 Q1 FY 24-25.pdf | 4 Jun 2025 |
| Form 1File: Architect Certificate 2024-2025 Q2.pdf | 4 Jun 2025 |
| Form 2File: Engineer Certificate 2025-2025 Q2.pdf | 4 Jun 2025 |
| Form 3File: Form 3 Q2 FY 24-25.pdf | 4 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 24 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q4 23 24.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 23 24.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23 24.pdf | 23 May 2024 |
| Declaration in FORM BFile: Affidavit cum declaration copy.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 25 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Q3.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory list.pdf | 2 Apr 2024 |
| Other - TechnicalFile: Format B.pdf | 2 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A VD 2022 23.pdf | 8 Feb 2024 |
| Other - FinanceFile: Inventory Sold Unsold list Q3 VD.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q2 22 23 VD.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q3 22 23 VD.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q4 22 23 VD.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q1 23 24 VD.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q2 23 24 VD.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q3 23 24 VD.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q2 22 23 VD.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q3 22 23 VD.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q4 22 23 VD.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q1 23 24 VD.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q2 23 24 VD.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q3 23 24 VD.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q3 22 23 VD.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q2 22 23 VD.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q4 22 23 VD.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q1 23 24 VD.pdf | 6 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Final Demarcated Residential Layout on Kh. N on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothewada2,800+ in Nagpur
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Rivershore Estate
Godrej Skyline Developers Ltd
Godrej Forest Estate
Dream World Landmarks LLP
Vrindavan Phase-3
Radha Madhav Developers
Kalpataru Ardene
Azure Tree Enviro Farms Private Limited
MAHALAXMI NAGAR-10
PADMALAXMI INFRTECH
VRINDAVAN PARK
TIRUPATI DEVELOPERS
See every Nagpur project, with the district possession charts
Builder: Pralhad Narayan Ashtankar
Pralhad Narayan Ashtankar has 1 registration on MahaRERA, including Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?
The registered promoter entity is Pralhad Narayan Ashtankar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?
The professionals named in the filing: Architect: Ankit Deepak Ashtankar; Engineer: Devang Rathod; Chartered Accountant: Khanzode & Shenwai; Chartered Accountant: Rakesh Thakre & Co; Chartered Accountant: A M DABKE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback