Home / Browse projects / Nagpur, Maharashtra / Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput

Registered No litigation declared Plotted project

Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput

By Pralhad Narayan Ashtankar

RG-MH-21889 · RERA P50500046837 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
16 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput is a Plotted project by Pralhad Narayan Ashtankar in Nagpur, Maharashtra, registered with MahaRERA as P50500046837 on 14 Sep 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 33 months from the original filing. 12 of the 28 units on this registration are recorded sold or booked.

At a glance

Project

  • NameFinal Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput
  • TypePlotted
  • Location
    • Kh No 106 Mouza Kothewada
    • Kothewada
    • Hingna
    • Nagpur
    • 441122
  • Pincode441122
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500046837
  • ReraGenie IDRG-MH-21889

Builder

  • NamePralhad Narayan Ashtankar
  • Entity typeIndividual

Key dates

1 months past promisethis monthRegisteredSep 2022First promiseDec 2023Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Sep 2022
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2023)
  • BuildingsNot stated in filing
  • Documents filed103 files

Current status

43%12 of 28 units booked
76.2%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes92%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025
LandownerVillageDistrict
Prahlad AshtankarKothewadaNagpur

Approvals and building plan

Sanctioning authorityCREDAI NAGPUR

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, South Wing, C-Block Central Facility, Bldg SEZ Mihan, Nagpur
Estimated costRs 1.00 cr
Cost incurredRs 76.15 lakh
Work done76.15%
BuildingWingEstimatedIncurred
-NARs 1.00 crRs 76.15 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkit Deepak Ashtankar
EngineerDevang Rathod
Chartered AccountantKhanzode & Shenwai
Chartered AccountantRakesh Thakre & Co
Chartered AccountantA M DABKE & ASSOCIATES
PartnerRole in project
Pralhad Narayan Ashtankar-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500019366Dec 2023 → Dec 2024

Reason as filed by the promoterThere is a delay in installation of Sewage Treatment Plant (STP) which will require 7 to 8 months to complete.

EXT50500027330Dec 2023 → Dec 2025

Reason as filed by the promoterSTP WORK IS PENDING WHICH WILL TAKE AROUND 6 MONTHS OF TIME TO COMPLETE. OTHER LAYOUT DEVELOPMENT WORK WILL ALSO TAKE 3 MONTHS TO COMPLETE HENCE THE EXTENSION IS REQUIRED. CPM PERT HAS BEEN ATTACHED HEREWITH.

EA12012619416Dec 2023 → Sep 2026

Reason as filed by the promoterOur work is complete and only the STP work was pending which is now complete. Only the necessary approvals from NMRDA are pending.Further we will Obtain final CC for closing the project before 30 th September 2026.Lastly, we will Complete the project with MahaRera with all clearances and necessary formalities before 30 th September 2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate position as on 30Jun26.pdf20 Jul 2026
Withdrawal Update Form 1File: Architect Certificate position as on 30Jun26.pdf20 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Position As on 30Jun26.pdf20 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Position As on 30Jun26.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 Vishwanath.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 Vishwanath.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Q4.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Q4.pdf4 May 2026
Withdrawal Update Form 1File: Architect Certificate Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Qtr 2 FY 25-26.pdf18 Oct 2025
Withdrawal Update Form 2File: Eng Certificate Qtr 2 FY 25-26.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2 FY 25-26.pdf18 Oct 2025
Withdrawal Update Form 1File: Form 1 Q1 FY 25-26.pdf4 Oct 2025
Withdrawal Update Form 1File: Form 1 Q1 FY 25-26.pdf4 Oct 2025
Withdrawal Update Form 2File: Form 2 Q1 FY 25-26.pdf4 Oct 2025
Withdrawal Update Form 2File: Form 2 Q1 FY 25-26.pdf4 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf4 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf4 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf29 Sep 2025
Form 5 (FY 2024-2025)File: Form 5.pdf26 Sep 2025
Form 1File: Form 1 Architects Certificate.pdf18 Jun 2025
Form 2File: Form 2 Engineers Certificate.pdf18 Jun 2025
Form 3File: Form 3 CA Certificate.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold n unsold Inventory as 15125.pdf18 Jun 2025
OthersFile: Extension Documents merged.pdf18 Jun 2025
Form 1File: Form 1 Architect Certificate.pdf12 Jun 2025
Form 2File: Form 2 Engineer Certificate.pdf12 Jun 2025
Form 3File: Form 3 CA Certificate.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and unsold Inventory.pdf12 Jun 2025
Form 1File: FORM1 Q1 23 24 VD.pdf4 Jun 2025
Form 2File: FORM2 Q1 23 24 VD.pdf4 Jun 2025
Form 3File: FORM3 Q1 23 24 VD.pdf4 Jun 2025
Form 1File: FORM1 Q2 23 24 VD.pdf4 Jun 2025
Form 2File: FORM2 Q2 23 24 VD.pdf4 Jun 2025
Form 3File: FORM3 Q2 23 24 VD.pdf4 Jun 2025
Form 1File: FORM1 Q3 23 24 VD.pdf4 Jun 2025
Form 2File: FORM2 Q3 23 24 VD.pdf4 Jun 2025
Form 3File: FORM3 Q3 23 24 VD.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q3.pdf4 Jun 2025
Form 1File: FORM1 Q4 23 24.pdf4 Jun 2025
Form 2File: FORM 2 Q4 23 24.pdf4 Jun 2025
Form 3File: Form 3 23 24 Q4.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4.pdf4 Jun 2025
Form 1File: Architect Certificate 2024-2025 Q1.pdf4 Jun 2025
Form 2File: Engineer Certificate 2024-2025 Q1.pdf4 Jun 2025
Form 3File: Form 3 Q1 FY 24-25.pdf4 Jun 2025
Form 1File: Architect Certificate 2024-2025 Q2.pdf4 Jun 2025
Form 2File: Engineer Certificate 2025-2025 Q2.pdf4 Jun 2025
Form 3File: Form 3 Q2 FY 24-25.pdf4 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q4 23 24.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 23 24.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23 24.pdf23 May 2024
Declaration in FORM BFile: Affidavit cum declaration copy.pdf15 May 2024
Disclosure of sold/ booked inventoryFile: 2 Disclosure of sold_ booked inventory.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q3.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory list.pdf2 Apr 2024
Other - TechnicalFile: Format B.pdf2 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A VD 2022 23.pdf8 Feb 2024
Other - FinanceFile: Inventory Sold Unsold list Q3 VD.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q2 22 23 VD.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q3 22 23 VD.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q4 22 23 VD.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q1 23 24 VD.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q2 23 24 VD.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q3 23 24 VD.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q2 22 23 VD.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q3 22 23 VD.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q4 22 23 VD.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q1 23 24 VD.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q2 23 24 VD.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q3 23 24 VD.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q3 22 23 VD.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q2 22 23 VD.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q4 22 23 VD.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q1 23 24 VD.pdf6 Feb 2024

How this compares with Nagpur

43%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 33 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Final Demarcated Residential Layout on Kh. N on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kothewada2,800+ in Nagpur

2 kmFinal Demarcated ResidenCompleted 5Lapsed / revoked 1Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: Pralhad Narayan Ashtankar

Pralhad Narayan Ashtankar has 1 registration on MahaRERA, including Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?

The registered promoter entity is Pralhad Narayan Ashtankar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?

The professionals named in the filing: Architect: Ankit Deepak Ashtankar; Engineer: Devang Rathod; Chartered Accountant: Khanzode & Shenwai; Chartered Accountant: Rakesh Thakre & Co; Chartered Accountant: A M DABKE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Final Demarcated Residential Layout on Kh. No. 106, Mouza Kothewada, Tal hingna Nagput. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Final Demarcated Residential Layout on Kh. N to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.