Home / Browse projects / Mumbai Suburban, Maharashtra / Express Tower CHS

Registered No litigation declared Others project

Express Tower CHS

By KOSMOS DEVELOPER

RG-MH-05305 · RERA P51800051077 · Last updated on MahaRERA portal: 14 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 65%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Express Tower CHS is a Others project by KOSMOS DEVELOPER in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051077 on 29 May 2023. Possession is promised by 16 Feb 2028.

At a glance

Project

  • NameExpress Tower CHS
  • TypeOthers
  • Location
    • L T Road
    • Station Road
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051077
  • ReraGenie IDRG-MH-05305

Builder

  • NameKOSMOS DEVELOPER
  • Entity typePartnership
  • GSTIN27AAKFK7017M1ZW
  • PartnersPREETI RAKESH SINGH, PREETI RAKESH SINGH, PREETI RAKESH SINGH, PREETI RAKESH SINGH
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2023PromisedFeb 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2023
  • Promised completion16 Feb 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Express Tower CHSL Wing A and BNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 65%.

Express Tower CHSL Wing A and B: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Closed/Covered57

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,179 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Express Tower CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI6364.98
Proposed, not sanctioned6,043 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai Lower Parel 400013

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKetan Vaidya Associates
EngineerHarshad Maanohaar More
Chartered Accountantkrishna nayak and co
PartnerRole in project
KOSMOS DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 16 Feb 2028

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Express Tower Q1.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Express Tower Q2.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Express Tower Apri'24 to June'24 Q1.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Express Tower July'24 to Sep'24 Q2.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1Architect's Certificate for RERA 4th Quarter_compressed.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 1 compressed.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 2 compressed.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Q 3 compressed.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Q 4 compressed.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate for RERA 3rd Quarter 1_compressed.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate for RERA 4th Quarter 1_compressed.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked inventory1.pdf6 May 2024
Building plan approvalFile: LOI 23062023.pdf25 Apr 2024
Building plan approvalFile: Plan No1compressed.pdf25 Apr 2024
Building plan approvalFile: Plan No2compressed.pdf25 Apr 2024
Building plan approvalFile: Plan No3compressed.pdf25 Apr 2024
Building plan approvalFile: Plan No4compressed.pdf25 Apr 2024
Building plan approvalFile: Plan No5compressed.pdf25 Apr 2024
Building plan approvalFile: Plan No6compressed.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: LOI 23062023.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No1compressed.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No2compressed.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No3compressed.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No4compressed.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No5compressed.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No6compressed.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QI Form 2.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QII Form 2.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QIII Form 2.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QIV Form 2.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QI From 2A.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QII From 2A.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QIII Form 2A.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QIV From 2A.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate for RERA Form 1_compressed.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QI-compressed.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QII-compressed.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QIII-compressed.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QIV-compressed.pdf18 Apr 2024
Proforma of Agreement for saleFile: Draft of Agreement for Sale Express tower -for bank ICICI.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbered Certificate Express Tower.pdf4 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbered Certificate Express Tower.pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certificate-2.pdf26 May 2023
Building plan approvalFile: GROUND FLOOR- EXPRESS TOWER BW (1).pdf25 May 2023
Building Plan Approval / NA Order for plotted developmentFile: GROUND FLOOR- EXPRESS TOWER BW (1).pdf25 May 2023
Declaration in FORM BFile: CamScan-25-05-2023-18-08-16_compressed.pdf25 May 2023
Proforma of Agreement for saleFile: ASF express.pdf23 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER_ANNEXURE 2.pdf22 May 2023
Details of encumbrances concerned to FinanceFile: CamScan-20-05-2023-16-31-04.pdf20 May 2023
Details of encumbrances concerned to LegalFile: CamScan-20-05-2023-16-31-04.pdf20 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx -A B D Shukla.pdf12 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx -A Preeti Singh.pdf12 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx -A Rakesh Singh.pdf12 May 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf12 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for Sales.pdf12 May 2023
Building plan approvalFile: 5.pdf20 Apr 2023
Building plan approvalFile: 4.pdf20 Apr 2023
Building plan approvalFile: 3.pdf20 Apr 2023
Building plan approvalFile: 2.pdf20 Apr 2023
Layout approvalFile: Ioa plan (1)-compressed 9.pdf20 Apr 2023
Layout approvalFile: Ioa plan (1)-compressed 9.pdf20 Apr 2023
Building plan approvalFile: 1.pdf20 Apr 2023
Copy of the legal title reportFile: ilovepdf_merged_compressed_compressed.pdf20 Apr 2023
Copy of Layout Approval (in case of layout)File: Ioa plan (1)-compressed 9.pdf20 Apr 2023
Copy of Layout Approval (in case of layout)File: Ioa plan (1)-compressed 9.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf20 Apr 2023
Declaration about Commencement CertificateFile: SCAN_20230418_132837696.pdf20 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: CamScan-17-04-2023-14-40-02_compressed.pdf17 Apr 2023
Details of encumbrances concerned to FinanceFile: Adobe Scan 29 Mar 2023.pdf29 Mar 2023
Details of encumbrances concerned to LegalFile: Adobe Scan 29 Mar 2023.pdf29 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2023-03-31-Form 2 Engineers certificate Q1 2023.pdf29 Mar 2023
Layout approvalFile: Adobe Scan 28 Mar 2023 (1).pdf28 Mar 2023
Building plan approvalFile: Adobe Scan 28 Mar 2023 (3)_compressed (1).pdf28 Mar 2023
PAN CardFile: Kosmos pan card.pdf28 Mar 2023
Copy of the legal title reportFile: title certificate Express tower.pdf28 Mar 2023
Copy of Layout Approval (in case of layout)File: Adobe Scan 28 Mar 2023 (1).pdf28 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sankalp VigneshwaraPushpapark Road No.2 Near Siddhivinayak49CompletedOct 2013Late, Nov 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Express Tower CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Station Road6,700+ in Mumbai Suburban

2 kmExpress Tower CHSCompleted 160Lapsed / revoked 91Other 223Dot size: filed unitsN

Filed coordinates, straight-line distance. 474 registered projects within 2 km.

Builder: KOSMOS DEVELOPER

KOSMOS DEVELOPER has 6 registrations on MahaRERA, including VINAYAK TOWER and SHREEYOG CHSL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Express Tower CHS is delayed beyond 16 Feb 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Express Tower CHS?

The registered promoter entity is KOSMOS DEVELOPER, a partnership as per the filing. Its GSTIN 27AAKFK7017M1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Express Tower CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Express Tower CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Express Tower CHS?

The professionals named in the filing: Architect: Ketan Vaidya Associates; Engineer: Harshad Maanohaar More; Chartered Accountant: krishna nayak and co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Express Tower CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Express Tower CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Express Tower CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.