EVERSHINE AMAVI 303 PHASE 2
RG-MH-28083 · RERA P99000024860 · Last updated on MahaRERA portal: 17 Feb 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EVERSHINE AMAVI 303 PHASE 2 is a Residential / Group Housing project by EVERSHINE DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000024860 on 9 Mar 2020. The registration is recorded completed; possession was promised by 29 Dec 2024. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameEVERSHINE AMAVI 303 PHASE 2
- TypeResidential / Group Housing
- Location
- Chikhadongari Road
- Global city Virar West
- Dongare
- Palghar
- 401303
- Pincode401303
- RERA no.P99000024860
- ReraGenie IDRG-MH-28083
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Mar 2020
- Promised completion29 Dec 2024
- Revised completionRevised to 29 Dec 2024 (originally 30 Dec 2023)
- Buildings4 building records
- Documents filed45 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 10 | NA | 16 | 0 | 0 | 0 | 0 |
| BUILDING NO 11 | NA | 16 | 0 | 0 | 0 | 0 |
| BUILDING NO 12 | NA | 16 | 0 | 0 | 0 | 0 |
| BUILDING NO 13 | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 15%.
BUILDING NO 1083%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 1183%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 1283%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 1383%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING NO 10 | 2 | 1 | 3 |
| BUILDING NO 11 | 1 | 1 | 2 |
| BUILDING NO 12 | 1 | 2 | 3 |
| BUILDING NO 13 | 1 | 1 | 2 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| EVERSHINE DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Feb 2025
Documents filed45
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SHAH GATTANI PHASE 2 ARCHITECT CERTIFICATE-Form 4.pdf | 17 Feb 2025 |
| Other - TechnicalFile: SHAH GATTANI PHASE 2 ARCHITECT CERTIFICATE-Form 4.pdf | 17 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: SHAH GATTANI PHASE 2 ARCHITECT CERTIFICATE-Form 4.pdf | 20 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Evershine Amavi Phase 1and 2 OC.pdf | 26 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 24 Nov 2023 |
| Declaration about Commencement CertificateFile: Format D Phase 2.pdf | 24 Nov 2023 |
| Declaration in FORM BFile: Form B.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-Evershine Amavi 303 Phase 2.pdf | 24 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Amavi Phase 2_Form 2A (FY 19-20).pdf | 24 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Amavi Phase 2_Form 2A (FY 20-21).pdf | 24 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Amavi Phase 2_Form 2A (FY 21-22).pdf | 24 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Amavi Phase 2_Form 2A (FY 22-23).pdf | 24 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Amavi Phase 2_Form 5 (FY 19-20).pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) (1).pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-Evershine Amavi 303 Phase 2.pdf | 9 Nov 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement.pdf | 4 Oct 2023 |
| Proforma of Allotment letterFile: Model Allotment Letter.pdf | 4 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Amavi Phase 2_Form 5 (FY 22-23).pdf | 3 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 FY21-22 E AmaviPhase2.pdf | 15 Nov 2022 |
| Details of encumbrancesFile: Detail of Encumbrance From Bajaj housing Finance Ltd.pdf | 20 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cert of percentage of work completed.pdf | 24 Jun 2021 |
| Proforma of Allotment letterFile: Eamavi303 Rera agreement.pdf | 24 Feb 2021 |
| Proforma of Allotment letterFile: Performa of agreement for sale.pdf | 4 Mar 2020 |
| Proforma of Allotment letterFile: Model Allotment Letter Evershine Amavi.pdf | 4 Mar 2020 |
| Building plan approvalFile: YI 1A 10,11,13,17,18 Typ.pdf | 25 Feb 2020 |
| Building plan approvalFile: YI 2A - 12 Typ.pdf | 25 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: YI 1A 10,11,13,17,18 Typ.pdf | 25 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: YI 2A - 12 Typ.pdf | 25 Feb 2020 |
| Declaration in FORM BFile: Amavi Phase - 2 (Form B).pdf | 25 Feb 2020 |
| Declaration in FORM BFile: Avenue I Release cum Transfer(Ev Amavi303)1.pdf | 25 Feb 2020 |
| Declaration in FORM BFile: Avenue I Release cum Transfer(Ev Amavi303)2.pdf | 25 Feb 2020 |
| Declaration in FORM BFile: Avenue I Release cum Transfer(Ev Amavi303)3.pdf | 25 Feb 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Amavi 303 Phase 2 ARCHITECT CERTIFICATE.pdf | 25 Feb 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Phase-2.pdf | 25 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amavi Phase 2 C A CERTIFCATE.pdf | 25 Feb 2020 |
| Layout approvalFile: Layout 2019.pdf | 24 Feb 2020 |
| PAN CardFile: Evershine Developers PAN.pdf | 24 Feb 2020 |
| Copy of the legal title reportFile: Title Certificate.pdf | 24 Feb 2020 |
| Details of encumbrancesFile: Declatration.pdf | 24 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: Layout 2019.pdf | 24 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE 2018.pdf | 24 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED COMMENCEMENT CERTIFICATE2019.pdf | 24 Feb 2020 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GLOBAL CITY AVENUE JMGH | GLOBAL CITY | 4,500 | Completed | Dec 2014 | May 2014 |
| EVERSHINE EMBASSY | VEERA DASAI ROAD ANDHERI WEST | 208 | Completed | May 2010 | May 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 45 filed documents as one ZIP, foldered, with a manifest
Keep EVERSHINE AMAVI 303 PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Global city Virar West3,200+ in Palghar
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: EVERSHINE DEVELOPERS
EVERSHINE DEVELOPERS has 4 registrations on MahaRERA, including EVERSHINE AMAVI 303 PHASE 1 and EVERSHINE AMAVI 303 PHASE 2. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if EVERSHINE AMAVI 303 PHASE 2 is delayed beyond 29 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EVERSHINE AMAVI 303 PHASE 2?
The registered promoter entity is EVERSHINE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EVERSHINE AMAVI 303 PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EVERSHINE AMAVI 303 PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in EVERSHINE AMAVI 303 PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback