Home / Browse projects / Raigarh, Maharashtra / EV CITY CENTRE

Completed No litigation declared Commercial project

EV CITY CENTRE

By EV HOMES CONSTRUCTIONS PVT LTD

RG-MH-24846 · RERA P52000009119 · Last updated on MahaRERA portal: 13 Jan 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2020Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 75%
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

EV CITY CENTRE is a Commercial project by EV HOMES CONSTRUCTIONS PVT LTD in Raigarh, Maharashtra, registered with MahaRERA as P52000009119 on 19 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2020.

At a glance

Project

  • NameEV CITY CENTRE
  • TypeCommercial
  • Location
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000009119
  • ReraGenie IDRG-MH-24846

Builder

  • NameEV HOMES CONSTRUCTIONS PVT LTD
  • Entity typeCompany
  • CINU45200MH2005PTC155637
  • GSTIN27AABCE5013H1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorsELENJIKAMALIL VARKEY THOMAS, JOISE THOMAS, VICKY THOMAS, RICKI THOMAS
  • Other registrations5 more →
  • Completed2 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017PromisedSep 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion30 Sep 2020
  • Revised completionNone
  • Buildings1 building record
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EV CITY CENTRENA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

EV CITY CENTRE: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered1
Open Space36

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,633 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PANVEL MATERNITY AND INFANT WELFARE LEAGUEPanvelRaigarh

Approvals and building plan

Permissible FSI3265.52
Proposed, not sanctioned3,266 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEDEN PALACE PLOT NO 16 SECTOR 16A SANPADA NAVI MUMBAI 400705

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDessin 2000
EngineerS R Consultants
PartnerRole in project
EV HOMES CONSTRUCTIONS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jan 2022

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-EV City Centre.pdf13 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate-E V City Centrre-Society.pdf14 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form-4-EV City Centre.pdf13 Sep 2021
Declaration about Commencement CertificateFile: Declaration about CC-City Cetre.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A-30-06-2019.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A-30-09-2019.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A-30-09-2019.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A-31-03-2020.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A-30-06-2020.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A-30-09-2020.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A-31-12-2020.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A-31-03-2021.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-City Cetre-31-08-2021.pdf2 Sep 2021
OtherFile: Form-1-City-Centre-Dec-2019.PDF21 Jan 2020
OtherFile: Form-2-City-Centre-Dec-2019.pdf21 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No 1.pdf9 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 2.pdf9 Oct 2018
Certificates of CA (Form 5)File: Form 5-City-Centre-2017-18.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 - Panvel-June-2018.pdf10 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 - Panvel - June - 2018.pdf10 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-Architect certificate-31-03-18.pdf13 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2-Engineer Certificate-31-03-18.pdf13 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2-Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form- 3 CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: Unddrtaking-Agr-to-Sale.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate 631.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate 631-1.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate 631-2.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate 662-C.pdf29 Jul 2017
Layout approvalFile: Ground Floor.pdf27 Jul 2017
Layout approvalFile: First Second Floor.pdf27 Jul 2017
Layout approvalFile: Third Fourth Floor.pdf27 Jul 2017
Layout approvalFile: Fifith Sixth Floor.pdf27 Jul 2017
Building plan approvalFile: CC.pdf27 Jul 2017
PAN CardFile: Pan Card-EV.pdf27 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Ground Floor.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: First Second Floor.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Third Fourth Floor.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Fifith Sixth Floor.pdf27 Jul 2017
Building Plan Approval (IOD)File: CC.pdf27 Jul 2017
Declaration in FORM BFile: Form-B-Developer.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-Architect Certificate.pdf27 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SINAI TOWERKAKINAD KOCHI KERALA 68201738CompletedJul 2017Feb 2017
E V CASTLEPLOT NO 110 SECTOR 9 ULVE TALUKA PANVEL DISTT RAIGAD 41020626CompletedApr 2016Apr 2016
ZION I AND IIPLOT NO 29 AND 30 SECTOR 25 NERUL EAST NAVI MUMBAI 40070659CompletedMar 2016Late, May 2017
SAFFIRE HEIGHTSPLOT NO 32A AND 33A SECTOR 12 KALAMBOLI TALUKA PANVEL DISTT RAGIAD 41020970CompletedMar 2010Late, May 2012

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EV CITY CENTRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmEV CITY CENTRECompleted 211Lapsed / revoked 57Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 402 registered projects within 2 km.

Builder: EV HOMES CONSTRUCTIONS PVT LTD

EV HOMES CONSTRUCTIONS PVT LTD has 6 registrations on MahaRERA, including EV CITY CENTRE and EV Heart City. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if EV CITY CENTRE is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EV CITY CENTRE?

The registered promoter entity is EV HOMES CONSTRUCTIONS PVT LTD, a company as per the filing. Its CIN U45200MH2005PTC155637 and GSTIN 27AABCE5013H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EV CITY CENTRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EV CITY CENTRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EV CITY CENTRE?

The professionals named in the filing: Architect: Dessin 2000; Engineer: S R Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EV CITY CENTRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EV CITY CENTRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EV CITY CENTRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.