Home / Browse projects / Sangli, Maharashtra / Euphoria Pride Building A West Side
Euphoria Pride Building A West Side
RG-MH-51664 · RERA P53100047641 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
At a glance
Project
- NameEuphoria Pride Building A West Side
- TypeMixed
- Location
- Balaji Mill Road
- North Shivaji Nagar
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100047641
- ReraGenie IDRG-MH-51664
Builder
- NameSwastik Vastu Private Limited
- Entity typeCompany
- GSTIN27AAPCS7365A1Z3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Nov 2022
- Promised completion25 Apr 2026
- Revised completionRevised to 25 Apr 2026 (originally 31 Jul 2025)
- Buildings1 building record
- Documents filed99 files
Current status
Figures from the project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Euphoria Pride Building A West side | NA | 8 | 8 | 38 | 17 | 55 |
These details are filed with MahaRERA and packaged in the Rs 499 buyer report. Create a free account to preview, or read the full report for the verdict.
Builder: Swastik Vastu Private Limited
Swastik Vastu Private Limited has 1 registration in this build, including Euphoria Pride Building A West Side. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if Euphoria Pride Building A West Side is delayed beyond 25 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Euphoria Pride Building A West Side?
The registered promoter entity is Swastik Vastu Private Limited, a company as per the filing. Its GSTIN 27AAPCS7365A1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents, all downloadable free from this page with a login.
Is my payment protected in Euphoria Pride Building A West Side?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Euphoria Pride Building A West Side?
The professionals named in the filing: Architect: Sambhaji Patil; Engineer: Chandrakant Punekar; Engineer: Rajendra Shinde; Chartered Accountant: Dattatray Shridhar Palkar; Chartered Accountant: PURVI KALPESH JAJAL; Other: Pranav Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Euphoria Pride Building A West Side?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Spotted something wrong? Report a data issue