Registered No litigation declared Others project

Estrella

By Shreeji Homes

RG-MH-18227 · RERA P52000056215 · Last updated on MahaRERA portal: 1 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken
  • Rs 60.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedmoved 18 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
57 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

Estrella is a Others project by Shreeji Homes in Raigarh, Maharashtra, registered with MahaRERA as P52000056215 on 22 May 2024. Possession is promised by 30 Jun 2029. The completion date has moved by 18 months from the original filing. 18 of the 75 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameEstrella
  • TypeOthers
  • Location
    • Sector -11
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • RERA no.P52000056215
  • ReraGenie IDRG-MH-18227

Builder

  • NameShreeji Homes
  • Entity typePartnership
  • PartnersKantilal Mavji Patel, Kruti Satej Patel, Mohanlal Hansraj Patel, Piyush Ratilal Patel, Daksha Kantilal Patel, Saurabh Vithalbhai Patel

Key dates

this monthRegisteredMay 2024First promiseDec 2027Revised toJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion30 Jun 2029
  • Revised completionRevised to 30 Jun 2029 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed110 files

Current status

24%18 of 75 units booked
29.9%Work done, per cost certificate

Figures as on 1 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EstrellaNA221866975

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

Estrella: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered110

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,277 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on22 May 2026

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI14700.0
Proposed, not sanctioned12,819 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 9,10,11 AND 56, GROUND FLR,PLOT NO 21, SECTOR 11, CBD BELAPUR NAVI MUMBAI MAHARASHTRA 400614
Estimated costRs 75.00 cr
Cost incurredRs 22.40 cr
Work done29.87%
BuildingWingEstimatedIncurred
EstrellaNARs 70.00 crRs 22.40 cr
-NARs 5.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Designs
EngineerS. V. Patel & Associates
EngineerPRAVIN MANILAL VELANI
Chartered AccountantRutuja Narsingh and Associates
Chartered AccountantRAVI THAKKAR
Chartered AccountantL K DEDHIA & CO
PartnerRole in project
Shreeji Homes-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12062621342Dec 2027 → Jun 2029

Reason as filed by the promoterThe construction progress of the project has been severely impacted due to an acute shortage of skilled and unskilled labour available at the project site.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 JUN 26.pdf1 Aug 2026
Withdrawal Update Form 2File: FORM 2 JUN 26.pdf1 Aug 2026
Withdrawal Update Form 3File: FORM 3 JUN 26.pdf1 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 25.pdf22 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 26.pdf22 Jun 2026
Form 2A (FY 2026-2027)File: FORM 2A 27.pdf22 Jun 2026
Form 5 (FY 2025-2026)File: FORM 5 26.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1 MAR 26.pdf14 May 2026
Withdrawal Update Form 2File: FORM 2 MAR 26.pdf14 May 2026
Withdrawal Update Form 3File: FORM 3 MAR 26.pdf14 May 2026
Building plan approvalFile: CC DRAWING REVISED-1.pdf8 Apr 2026
Building plan approvalFile: CC DRAWING REVISED-2.pdf8 Apr 2026
Building plan approvalFile: CC DRAWING REVISED-3.pdf8 Apr 2026
Building plan approvalFile: CC DRAWING REVISED-5.pdf8 Apr 2026
Building plan approvalFile: CC DRAWING REVISED-6.pdf8 Apr 2026
Withdrawal Update Form 1File: FORM 1 DEC 25.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM 2 SEPT 25.pdf28 Jan 2026
Withdrawal Update Form 3File: FORM 3 DEC 25.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 25.pdf21 Jan 2026
Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf16 Dec 2025
Withdrawal Update Form 2File: FORM 2 SEPT 25.pdf16 Dec 2025
Withdrawal Update Form 3File: FORM 3 SEPT 25.pdf16 Dec 2025
Form 1File: FORM 1 JUN 25.pdf19 Jul 2025
Form 2File: FORM 2 JUN 25.pdf19 Jul 2025
Form 3File: FORM 3 JUN 25.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN 25.pdf19 Jul 2025
Form 1File: FORM 1 JUN 24.pdf15 May 2025
Form 2File: FORM 2 JUN 24.pdf15 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN 24.pdf15 May 2025
Self-declaration of Quarterly ProgressFile: FORM 3 JUN 24.pdf15 May 2025
Form 1File: FORM 3 JUN 24.pdf15 May 2025
Form 2File: SOLD-UNSOLD JUN 24.pdf15 May 2025
Form 3File: FORM 1 JUN 24.pdf15 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 2 JUN 24.pdf15 May 2025
Form 1File: FORM 3 JUN 24.pdf15 May 2025
Form 2File: SOLD-UNSOLD JUN 24.pdf15 May 2025
Form 3File: FORM 2 JUN 24.pdf15 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 1 JUN 24.pdf15 May 2025
Form 1File: FORM 3 JUN 24.pdf15 May 2025
Form 2File: SOLD-UNSOLD JUN 24.pdf15 May 2025
Form 3File: FORM 1 JUN 24.pdf15 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 2 JUN 24.pdf15 May 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD MAR 25.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAR 25.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 25.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAR 25.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 24.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 24.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 24.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD DEC 24.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUN 24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 24.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD JUN 24.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD SEPT 24.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUN 24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUN 24.pdf3 Jan 2025
Layout approvalFile: Revised ACC DWG-1 Locatin plan.pdf16 Oct 2024
Building plan approvalFile: Revised ACC DWG-3 - 2nd 3rd.pdf16 Oct 2024
Building plan approvalFile: 417813.pdf16 Oct 2024
Building plan approvalFile: b1 1st.pdf16 Oct 2024
Building plan approvalFile: 1819.pdf16 Oct 2024
Building plan approvalFile: location plan.pdf16 Oct 2024
Copy of Layout Approval (in case of layout)File: Revised ACC DWG-1 Locatin plan.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC COPY.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised ACC DWG-3 - 2nd 3rd.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 417813.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: b1 1st.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 1819.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: location plan.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: ACC COPY.pdf15 Oct 2024
Proforma of Agreement for saleFile: AFS pdf Revised Draft.pdf15 Oct 2024
Proforma of Agreement for saleFile: Addmission partnership deed.pdf18 May 2024
Copy of the legal title reportFile: Revised Short Title_Estrella_03052024.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: output (1).pdf2 May 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf2 May 2024

How this compares with Raigarh

24%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 18 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Estrella on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar5,900+ in Raigarh

Builder: Shreeji Homes

Shreeji Homes has 1 registration on MahaRERA, including Estrella. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Estrella is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Estrella?

The registered promoter entity is Shreeji Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Estrella?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Estrella?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Estrella?

The professionals named in the filing: Architect: Destination Architecture Interior Designs; Engineer: S. V. Patel & Associates; Engineer: PRAVIN MANILAL VELANI; Chartered Accountant: Rutuja Narsingh and Associates; Chartered Accountant: RAVI THAKKAR; Chartered Accountant: L K DEDHIA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Estrella?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Estrella. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Estrella to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.