Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Estquire Paradise Phase 2 is a Residential / Group Housing project by ESTQUIRE PROJECTS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000079382 on 3 Mar 2025. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameEstquire Paradise Phase 2
  • TypeResidential / Group Housing
  • Location
    • S.No.32/B/1
    • Plot No. 7 and 8 of Village - Sopara
    • Sopara
    • Vasai
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000079382
  • ReraGenie IDRG-MH-31048

Builder

  • NameESTQUIRE PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsVIPUL VIJAY GIRDHAR, KALPESH PRAKASH BOHRA
  • Other registrations3 more →

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg 1 EWSNA1615000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Bldg 1 EWS: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered45
Open Space55

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,165 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
New Satyam Co-Operative Housing Society LimitedVasai-Virar City (M Corp)Palghar
Narmada Co-Operative Housing Society LimitedVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation
Permissible FSI10902.74
Proposed, not sanctioned9,903 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround and First Floors, Bably Apartment, Near Patankar Park, Station Road, Nalasopara West - 401203

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Kekre Kekre
EngineerShailesh Pandey
EngineerNexus Consultants & Engineers
Chartered AccountantN B Sayed & Associates
PartnerRole in project
ESTQUIRE PROJECTS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Estquire Paradise Phase 2 as on Dec 2025.pdf2 Jun 2026
Form 2File: Form 2 - Estquire Paradise Phase 2 as on Dec 2025.pdf2 Jun 2026
Form 3File: Form 3 of Estquire Paradise Phase 2 as on 31-12-2025.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Estquire Paradise Phase 2 as on Dec 2025.pdf2 Jun 2026
Form 1File: Form 1 - Estquire Paradise Phase 2 as on June 2025.pdf17 May 2026
Form 2File: Form 2 - Estquire Paradise Phase 2 as on June 2025.pdf17 May 2026
Form 3File: Form 3 - Estquire Paradise Phase 2 as on June 2025.pdf17 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Estquire Paradise Phase 2 as on June 2025.pdf17 May 2026
Form 1File: Form 1 Architects Cert Estquire Paradise -PHASE-2 Q2.pdf17 May 2026
Form 2File: Form 2 - Estquire Paradise Phase 2 as on Sep 2025.pdf17 May 2026
Form 3File: Form 3 - Estquire Paradise Phase 2 as on Sep 2025.pdf17 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Estquire Paradise Phase 2 as on Sep 2025.pdf17 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Estquire Paradise Phase 2 as on March 2025.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Estquire Paradise Phase 2 as on March 2025.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate.pdf12 Feb 2025
Other - FinanceFile: Declaration of Unit Count.pdf7 Feb 2025
Other - TechnicalFile: CC Verification - Estquire Paradise Phase 2.pdf7 Feb 2025
Other - TechnicalFile: Declaration of Unit Count.pdf7 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - RERA Designated Accounts.pdf3 Feb 2025
Other - TechnicalFile: Annxure A - Order No 50.pdf3 Feb 2025
Other - TechnicalFile: Architect Letter for error.pdf3 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Declaration from Bank.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf31 Jan 2025
Other - FinanceFile: Declaration of Land Cost.pdf31 Jan 2025
Layout approvalFile: Layout Pg 1.PDF30 Jan 2025
Building plan approvalFile: Layout Pg 1.PDF30 Jan 2025
Building plan approvalFile: Pg 2.PDF30 Jan 2025
Building plan approvalFile: Pg 3.PDF30 Jan 2025
Building plan approvalFile: Pg 4.PDF30 Jan 2025
Building plan approvalFile: Pg 5.PDF30 Jan 2025
PAN CardFile: PAN Card - Firm.pdf30 Jan 2025
Copy of the legal title reportFile: Final Title Report - Estquire compr.pdf30 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf30 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.pdf30 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout Pg 1.PDF30 Jan 2025
Proforma of Allotment letterFile: AL_ESTQUIRE PARADISE PHASE 2_Ms Estquire Projects Private Limited_10012025.pdf30 Jan 2025
Declaration in FORM BFile: Form B - Declaration of Promoter.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Copy - Revised.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification - Estquire Paradise Phase 2.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout Pg 1.PDF30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 2.PDF30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 3.PDF30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 4.PDF30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 5.PDF30 Jan 2025
Declaration about Commencement CertificateFile: Format D - Declaration of Commencement certificate.pdf30 Jan 2025
CERSAI detailsFile: Cersai Declaration.pdf30 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment.pdf30 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf30 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance - Legal.pdf30 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report agreement1.pdf30 Jan 2025
Proforma of Agreement for saleFile: AFS_ESTQUIRE PARADISE PHASE 2_Ms Estquire Projects Private Limited_30012025.pdf30 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of Interest.pdf30 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured and Unsecured loan.pdf30 Jan 2025

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Estquire Paradise Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sopara, Vasai3,200+ in Palghar

2 kmEstquire Paradise Phase Completed 54Lapsed / revoked 38Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: ESTQUIRE PROJECTS PRIVATE LIMITED

ESTQUIRE PROJECTS PRIVATE LIMITED has 4 registrations on MahaRERA, including OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED and Estquire Harmony. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Estquire Paradise Phase 2 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Estquire Paradise Phase 2?

The registered promoter entity is ESTQUIRE PROJECTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Estquire Paradise Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Estquire Paradise Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Estquire Paradise Phase 2?

The professionals named in the filing: Architect: Umesh Kekre Kekre; Engineer: Shailesh Pandey; Engineer: Nexus Consultants & Engineers; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Estquire Paradise Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Estquire Paradise Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Estquire Paradise Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.