Home / Browse projects / Mumbai Suburban, Maharashtra / ESTELLA

Registered No litigation declared Others project

ESTELLA

By V CITY BUILDERS & DEVELOPERS LLP

RG-MH-06033 · RERA P51800052152 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 36 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
65 of 127Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

ESTELLA is a Others project by V CITY BUILDERS & DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052152 on 24 Jul 2023. Possession is promised by 30 Jun 2028. The completion date has moved by 36 months from the original filing. 62 of the 127 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameESTELLA
  • TypeOthers
  • Location
    • AT JUNCTION OF MATHURADAS ROAD & BHOGILAL FADIA ROAD
    • KANDIVALI WEST
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • RERA no.P51800052152
  • ReraGenie IDRG-MH-06033

Builder

  • NameV CITY BUILDERS & DEVELOPERS LLP
  • Entity typePartnership
  • PartnersAMBAR DHIRUBHAI CHANCHAD, SAMIR SHIRISH DADIA, KEVIN KETAN SHAH

Key dates

this monthRegisteredJul 2023First promiseJun 2025Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jul 2023
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed88 files

Current status

49%62 of 127 units booked
78.4%Work done, per cost certificate

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ESTELLANA15147453127

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

ESTELLA: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered122

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,371 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jul 2025

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI5414.96
Proposed, not sanctioned3,833 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANAND NAGAR, DAHISAR EAST
Estimated costRs 41.70 cr
Cost incurredRs 32.71 cr
Work done78.43%
BuildingWingEstimatedIncurred
ESTELLANARs 36.72 crRs 31.21 cr
-NARs 4.98 crRs 1.49 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR ARCHITECTS & CONSULTANTS
Architectaakar consultants
EngineerVishal Balu Nikam
Chartered AccountantJIGAR ZAVERI & ASSOCIATES
PartnerRole in project
V CITY BUILDERS & DEVELOPERS LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08082502343Jun 2025 → Jun 2026

Reason as filed by the promoterDue to delay from contractor in completing work the project was not able to complete in time. We would like to request you to further grant us extension for 1 year/12 month. We request you kindly grant us the certificate of the earliest.

EA18072621794Jun 2025 → Jun 2028

Reason as filed by the promoterWe, V City Builders and Developers LLP, are the promoters of the real estate project known as "Estella" bearing Maha RERA Registration No. P51800005112. We Would like to request you that the Project Estella which is located at CTS no, 87/B, 87/8/1 to 21 of Village Malad (North) In R/South ward, At junction of Mathuradas read and Bhogilal Fadia Road, Kandivali - West, Mumbai - 400 067 having its Registration No P518000051152 was mentioned to be completed on 30 June 2025. The project has faced unavoidable delays due to administrative and statutory processing timelines. Specifically, under the pr

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Signed Form 1 Architect certificate Estella 30 June 2026_compressed.pdf27 Jul 2026
Withdrawal Update Form 2File: Signed FORM 2 - Engnineer Certificate Estella 30 June 2026.pdf27 Jul 2026
Withdrawal Update Form 3File: CA Certificate-ESTELLA V CITY.pdf27 Jul 2026
Form 2A (FY 2025-2026)File: form 2A (engineer certificate) Estella march 2026 signed copy_compressed.pdf18 Jul 2026
Withdrawal Update Form 1File: Form 1 (1).pdf2 May 2026
Withdrawal Update Form 2File: Form-2.pdf2 May 2026
Withdrawal Update Form 3File: CA Certificate (1).pdf2 May 2026
Withdrawal Update Form 1File: Signed Form 1 Architect certificate Estella Dec 2025.pdf26 Mar 2026
Withdrawal Update Form 2File: Signed Form 2 Estella 08012026.pdf26 Mar 2026
Withdrawal Update Form 3File: CA Certificate-ESTELLA V CITY 311225.pdf26 Mar 2026
Withdrawal Update Form 1File: Signed Form 1 Architect certificate Estella 30 Sep 2025.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Estella 30092025.pdf25 Mar 2026
Withdrawal Update Form 3File: CA Certificate-ESTELLA V CITY.pdf25 Mar 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 revised dec 24.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 V.pdf26 Mar 2025
Disclosure of sold/ booked inventoryFile: Booked Inventory Estella 30122024.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 july to sep 24.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Inventory Estella oct to dec 24.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed FORM - 2 Vidyanidhi Building June 2024.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Signed Form 2A Estella March 24.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Estella.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Estella.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Fomr 1 Architect Certificate March 2024.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Engineer Certificate Estella Form 2 march 2024.pdf12 Apr 2024
Building plan approvalFile: Vidyanidhi Amended IOA.pdf8 Apr 2024
Layout approvalFile: Vidyanidhi Amended IOA Plan_1-3.pdf8 Apr 2024
Layout approvalFile: Vidyanidhi Amended IOA Plan_4-6.pdf8 Apr 2024
Layout approvalFile: Vidyanidhi Amended IOA Plan_7-9.pdf8 Apr 2024
Layout approvalFile: Vidyanidhi Amended IOA Plan_10-10.pdf8 Apr 2024
Layout approvalFile: Vidyanidhi Amended IOA Plan_11-12.pdf8 Apr 2024
Layout approvalFile: Vidyanidhi Amended IOA Plan_13-end.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: Vidyanidhi Amended IOA Plan_1-3.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: Vidyanidhi Amended IOA Plan_4-6.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: Vidyanidhi Amended IOA Plan_7-9.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: Vidyanidhi Amended IOA Plan_10-10.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: Vidyanidhi Amended IOA Plan_11-12.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: Vidyanidhi Amended IOA Plan_13-end.pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Vidyanidhi Amended IOA.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1 Estella 31 december 23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Estella 31 December 23 (2).pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Estella 31 December 2023.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory Estella (1).pdf19 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: V City further CC issued.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1 Architect Certificate Estella September 23.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Engineer certificate Estella September 23.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Ca Certificate 30092023.pdf6 Nov 2023
Other - TechnicalFile: letter to Rera Estella.pdf19 Jul 2023
Proforma of Agreement for saleFile: estella agreement.pdf5 Jul 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (1).pdf17 Jun 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (1).pdf17 Jun 2023
Declaration about Commencement CertificateFile: CC Declaration estella 23062023.pdf17 Jun 2023
Other - TechnicalFile: 1 Copy of Layout Approval (in case of layout) (1).pdf17 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Signed CA Certificate-ESTELLA V CITY (1).pdf5 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviarion Report on allotment0000.pdf5 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Revised Deviation Report on Agreement 06072023.pdf5 Jun 2023
Layout approvalFile: output_1-2.pdf3 Jun 2023
Layout approvalFile: output_3-6.pdf3 Jun 2023
Layout approvalFile: output_7-8.pdf3 Jun 2023
Layout approvalFile: output_9-10.pdf3 Jun 2023
Layout approvalFile: output_11-12.pdf3 Jun 2023
Layout approvalFile: output_13-end.pdf3 Jun 2023
Copy of Layout Approval (in case of layout)File: output_1-2.pdf3 Jun 2023
Copy of Layout Approval (in case of layout)File: output_3-6.pdf3 Jun 2023
Copy of Layout Approval (in case of layout)File: output_7-8.pdf3 Jun 2023
Copy of Layout Approval (in case of layout)File: output_9-10.pdf3 Jun 2023
Copy of Layout Approval (in case of layout)File: output_11-12.pdf3 Jun 2023
Copy of Layout Approval (in case of layout)File: output_13-end.pdf3 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DOI.pdf3 Jun 2023
Proforma of Allotment letterFile: Draft Allotment Letter vidhyanidhi.pdf3 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for bank account0000.pdf3 Jun 2023
Building plan approvalFile: IOA.pdf2 Jun 2023

How this compares with Mumbai Suburban

49%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ESTELLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI WEST6,700+ in Mumbai Suburban

Builder: V CITY BUILDERS & DEVELOPERS LLP

V CITY BUILDERS & DEVELOPERS LLP has 1 registration on MahaRERA, including ESTELLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ESTELLA is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ESTELLA?

The registered promoter entity is V CITY BUILDERS & DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ESTELLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ESTELLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ESTELLA?

The professionals named in the filing: Architect: AAKAR ARCHITECTS & CONSULTANTS; Architect: aakar consultants; Engineer: Vishal Balu Nikam; Chartered Accountant: JIGAR ZAVERI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ESTELLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ESTELLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ESTELLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.