ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Esquire

Completed No litigation declared Residential / Group Housing project

Esquire

By Oberoi Realty Limited

RG-MH-12220 · RERA P51800005229 · Last updated on MahaRERA portal: 30 Sep 2019

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2018Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

Esquire is a Residential / Group Housing project by Oberoi Realty Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005229 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2018. 2 complaints are on record with the regulator.

At a glance

Project

  • NameEsquire
  • TypeResidential / Group Housing
  • Location
    • Off Western Express Highway
    • Goregaon
    • Borivali
    • Mumbai Suburban
    • 400063
  • Pincode400063
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005229
  • ReraGenie IDRG-MH-12220

Builder

  • NameOberoi Realty Limited
  • Entity typeCompany
  • CINL45200MH1998PLC114818
  • GSTIN27AABCK0235H1ZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Whole-time Director & CFOSaumil Ashwin Daru
  • DirectorsBindu Ranvir Oberoi, Vikas Ranvir Oberoi, Prafulla Premsukh Chhajed
  • Non Executive Independent DirectorsKaramjit Singh Kalsi, Anil Harish, Tina Trikha
  • Other registrations6 more →
  • Completed1 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017PromisedJun 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Jun 2018
  • Revised completionNone
  • Buildings3 building records
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA700000
Tower BNA700000
Tower CNA690000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Sep 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Tower A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 30 Sep 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Prop Public Parking to be handed over to MCGM at any location in LargerProperty incl under RE ProjYes0%

Parking filed2756

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,756
Closed/Covered2,756
BuildingClosed/CoveredTotal
Tower A925925
Tower B919919
Tower C912912

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,307 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI150000.01
Proposed, not sanctioned141,199 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManish Chambers, Commercial Complex, Sonawala Road, Goregaon East, Mumbai 400063

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Shashank Kokil
EngineerLeslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd
PartnerRole in project
Oberoi Realty Limited-

Litigation declared1

CaseCourtStatus
693/2017National Consumer Dispute Redressal Commission New DelhiPending

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000012043GANGOTRI MERCHANTS PRIVATE LIMITEDOberoi Realty Ltd.21/03/2018
CC006000000194118Pranay KothariOberoi Realty24/09/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Form 5 Esquire 201903.pdf30 Sep 2019
Certificates of CA (Form 5)File: Esquire - Form 5.pdf30 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Esquire Q4FY2018.pdf16 May 2018
Certificates of CA (Form 3)File: Esquire CA certificate Q4FY2018.pdf14 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Esquire - Architect Certificate Q4FY18.pdf4 May 2018
Certificates of Architect (Form 4)File: Form 4 - Architect Certificate Esquire OC.pdf19 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Esquire - Progress of formation of society.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Esquire - Engineers Certificate Q3FY18.pdf16 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Esquire - Architect Certificate Q3FY2018.pdf14 Feb 2018
Certificates of CA (Form 3)File: Esquire - CA certificate Q3 FY18.pdf9 Feb 2018
Certificates of Architect (Form 4)File: Form 4 - Architect's Certificate.pdf5 Feb 2018
Copy of the legal title reportFile: Esquire - Revised Title Certificate.pdf1 Dec 2017
Details of encumbrancesFile: Encumbrance certificate.pdf24 Nov 2017
Declaration in FORM BFile: Form B Declaration - 24 November 2017.pdf24 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Esquire - Architect Certificate.pdf8 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Esquire.pdf8 Nov 2017
Certificates of CA (Form 3)File: Esquire - CA Certificate.pdf8 Nov 2017
Layout approvalFile: Approved Layout - Goregaon.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Approved Layout - Goregaon.pdf29 Jul 2017
Proforma of Allotment letterFile: Esquire - Agreement for Sale.pdf29 Jul 2017
OtherFile: Esquire - Others.pdf29 Jul 2017
PAN CardFile: ORL_PAN.PDF27 Jul 2017
Details of encumbrancesFile: Non-Encumbrance Certificate.pdf27 Jul 2017
Declaration in FORM BFile: Form B.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Esquire - Architect Certificate.pdf27 Jul 2017
Building plan approvalFile: Esquire - IOD.pdf26 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf26 Jul 2017
Building Plan Approval (IOD)File: Esquire - IOD.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Esquire - CC.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Esquire - Engineer Certificate.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA Certificate - Esquire.pdf24 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Elysian Tower AP51800027667Goregaon East, Mumbai Suburban336Dec 2020OngoingJun 2027Not due yet
Priviera by Oberoi RealtyPriviera Junction of Sarojini Road and Main Avenue Road Santacruz West Mumbai Maharashtra 400 05412-CompletedMay 2015May 2015
Exquisite by Oberoi RealtyExquisite Oberoi Garden City Off Western Express Highway Goregaon East Mumbai 400 063802-CompletedDec 2014Late, May 2015
Commerz 2Commerz 2 International Business Park Oberoi Garden City Off Western Express Highway Goregaon East Mumbai 400 063--CompletedDec 2013Dec 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Esquire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon6,700+ in Mumbai Suburban

2 kmEsquireCompleted 84Lapsed / revoked 54Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 238 registered projects within 2 km.

Builder: Oberoi Realty Limited

Oberoi Realty Limited has 7 registrations on MahaRERA, including Esquire and Elysian Tower A. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Esquire is delayed beyond 30 Jun 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Esquire?

The registered promoter entity is Oberoi Realty Limited, a company as per the filing. Its CIN L45200MH1998PLC114818 and GSTIN 27AABCK0235H1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Esquire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Esquire?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Esquire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Esquire?

The professionals named in the filing: Architect: Architect Shashank Kokil; Engineer: Leslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Esquire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Esquire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Esquire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.