ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Epsilon Venkatesh

Registered No litigation declared Mixed project

Epsilon Venkatesh

By SHIVAM PRAJAPATI BUILDERS AND DEVELOPERS

RG-MH-59844 · RERA PM1270002502895 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
154 of 154Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 14 documents Report an error

Epsilon Venkatesh is a Mixed project by SHIVAM PRAJAPATI BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as PM1270002502895 on 18 Mar 2026. Possession is promised by 31 Dec 2029. 0 of the 154 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameEpsilon Venkatesh
  • TypeMixed
  • Location
    • Sector 07 Pushpak Nagar
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1270002502895
  • ReraGenie IDRG-MH-59844

Builder

  • NameSHIVAM PRAJAPATI BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • GSTIN27AFFFS8638N1Z4
  • PartnersNilesh Maruti Shinde, Manoj Ramanand Prajapati

Key dates

this monthRegisteredMar 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Mar 2026
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed14 files

Current status

0%0 of 154 units booked
0.0%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Epsilon VenkateshNA141213519154

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Epsilon Venkatesh: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed131

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots131
Stilt / Ground31
Podiums / Upper Parking Floor100

Land and ownership16

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,190 sq m
Land owned byNot the promoter
Named landowners16
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jan 2026
LandownerVillageDistrict
Shashikant Gajanan Patil-Raigarh
Prashant Rajendra Patil-Thane
Geeta Kiran Pardhi-Thane
Anjali Madan Taware-Thane
Priyanka Bhupendra Kawale-Thane
Sandhya Shantaram Gharat-Raigarh
Neeta Rajesh PatilChirleRaigarh
Rashmi Dilip VaratkVarasoliRaigarh
Suresh Pandharinath PatilPargaonRaigarh
Naynabai Prakash PatilPargaonRaigarh
Geetanjali Prabhakar Mhatre-Valsad
Nalini Nilkanth PatilPargaonRaigarh
Shrikant Nilkanth PatilPargaonRaigarh
Shridhar Nilkanth PatilPargaonRaigarh
Shriniwas Nilkanth PatilPargaonRaigarh
Vijaya Nilkanth Patil-Thane

Approvals and building plan

Permissible FSI9935.96
Proposed, not sanctioned8,839 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP DAILY BAZAAR, PLOT NO.19A,SECTOR 20, KHARGHAR, NAVI MUMBAI TALUK PANVEL 410 210
Estimated costRs 32.00 cr
Work done0.0%
BuildingWingEstimatedIncurred
Epsilon VenkateshNARs 30.00 cr-
-NARs 2.00 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION Architecture Interior Designs
EngineerSTRUCON CONSULTING ENGINEERS
Chartered AccountantMs Singh Ranjan & Co
PartnerRole in project
SHIVAM PRAJAPATI BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed14

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf15 May 2026
Withdrawal Update Form 2File: Form 2.pdf15 May 2026
Withdrawal Update Form 3File: Form 3.pdf15 May 2026
Declaration and undertaking (Annexure A)File: Annexure A.pdf7 Feb 2026
Layout approvalFile: PLAN 1.pdf5 Feb 2026
Layout approvalFile: PLAN 2.pdf5 Feb 2026
Layout approvalFile: PLAN 3.pdf5 Feb 2026
Layout approvalFile: PLAN 4.pdf5 Feb 2026
Layout approvalFile: PLAN 5.pdf5 Feb 2026
Building plan approvalFile: PLAN 1.pdf5 Feb 2026
Building plan approvalFile: PLAN 2.pdf5 Feb 2026
Building plan approvalFile: PLAN 3.pdf5 Feb 2026
Building plan approvalFile: PLAN 4.pdf5 Feb 2026
Building plan approvalFile: PLAN 5.pdf5 Feb 2026

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Epsilon Venkatesh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dapoli5,900+ in Raigarh

2 kmEpsilon VenkateshCompleted 60Lapsed / revoked 13Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 155 registered projects within 2 km.

Builder: SHIVAM PRAJAPATI BUILDERS AND DEVELOPERS

SHIVAM PRAJAPATI BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including Epsilon Venkatesh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Epsilon Venkatesh is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Epsilon Venkatesh?

The registered promoter entity is SHIVAM PRAJAPATI BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27AFFFS8638N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Epsilon Venkatesh?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Epsilon Venkatesh?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Epsilon Venkatesh?

The professionals named in the filing: Architect: DESTINATION Architecture Interior Designs; Engineer: STRUCON CONSULTING ENGINEERS; Chartered Accountant: Ms Singh Ranjan & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Epsilon Venkatesh?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Epsilon Venkatesh. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Epsilon Venkatesh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.