Registration approved Residential/Group Housing project

ENCON SRI NAGARAJA

By ENCON PROJECTS

RG-KA-70063 · RERA PRM/KA/RERA/1268/378/PR/181226/002264

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Apr 2021Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 27 documents Report an error

ENCON SRI NAGARAJA is a Residential/Group Housing project by ENCON PROJECTS in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/181226/002264 on 26 Dec 2018. Possession is promised by 25 Apr 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameENCON SRI NAGARAJA
  • TypeResidential/Group Housing
  • Location
    • MYSORE
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/181226/002264
  • ReraGenie IDRG-KA-70063

Builder

  • NameENCON PROJECTS
  • Entity typeCompany
  • Authorized SignatoryT N HEMANTH

Key dates

this monthRegisteredDec 2018First promiseJul 2020Revised toApr 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Dec 2018
  • Promised completion25 Apr 2021
  • Revised completionRevised to 25 Apr 2021 (originally 25 Jul 2020)
  • Buildings1 building record
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ENCON SRI NAGARAJA---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,209 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 60.90 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASUDEVAN RAJASHEKARAN KADALAYIL
EngineerVINAY GURKAR

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2020 → Apr 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed27

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/181226/002264 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: GST.pdf-
PLAN-
SALE DEED-
SPECIFICATION-
EC-
KHATA-
CONVERTION ORDER-
Balance Sheet 2017 - 2018File: BALANCE SHEET.pdf-
Balance Sheet 2016 - 2017File: BALANCE SHEET.pdf-
Balance Sheet 2015 - 2016File: BALANCE SHEET.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P & L ACCOUNT.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P & L Account.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L ACCOUNT.pdf-
Auditor's Report 2016 - 2017File: AUDIT REPORT.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR.jpg-
DECLARATION-
Tower Excel SheetFile: PRM_KA_RERA_1268_378_PR_181226_002264 (4).xls-
Loan raised documentFile: NOC From SBI for loan repayment.pdf-
Occupancy CertificateFile: OC.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: lift Certificate.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: CHESCOM.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: NOC From SBI for loan repayment.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Certificate F5.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: CA Certificate Form 4.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit.pdf-

How this compares with Mysore

28%of Mysore projects moved their completion datethis one moved by 9 months
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep ENCON SRI NAGARAJA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmENCON SRI NAGARAJAOther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: ENCON PROJECTS

ENCON PROJECTS has 1 registration on RERA Karnataka, including ENCON SRI NAGARAJA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if ENCON SRI NAGARAJA is delayed beyond 25 Apr 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ENCON SRI NAGARAJA?

The registered promoter entity is ENCON PROJECTS, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ENCON SRI NAGARAJA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ENCON SRI NAGARAJA?

The professionals named in the filing: Architect: VASUDEVAN RAJASHEKARAN KADALAYIL; Engineer: VINAY GURKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ENCON SRI NAGARAJA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ENCON SRI NAGARAJA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ENCON SRI NAGARAJA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.