ReraGenieLog inGet a buyer report

Home / Browse projects / Kolhapur, Maharashtra / EMPERIA

Registered No litigation declared Residential / Group Housing project

EMPERIA

By REVANTA ENGINEERS AND DEVELOPERS

RG-MH-46777 · RERA P53000054324 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
3 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

EMPERIA is a Residential / Group Housing project by REVANTA ENGINEERS AND DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000054324 on 15 Jan 2024. Possession is promised by 31 Dec 2027. 11 of the 14 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameEMPERIA
  • TypeResidential / Group Housing
  • Location
    • E WARD GHATAGE AND SHIVRAJ COLONY
    • NEAR MENON BUNGALOW
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000054324
  • ReraGenie IDRG-MH-46777

Builder

  • NameREVANTA ENGINEERS AND DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABAFR3964P1ZJ
  • PartnersSIDDHESH VILAS REDEKAR, AMRUTA VAIBHAV HAVAL, VILAS RAJARAM REDEKAR

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed122 files

Current status

79%11 of 14 units booked
109.2%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMPERIANA8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

EMPERIA: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered32
Open Space9

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area568 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2024

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI2041.4
Proposed, not sanctioned2,041 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASANT PLAZA RAJARAM ROAD E WARD NEAR UDYOG BHAVAN RAJARAMPURI BAGAL CHOWK KOLHAPUR 416001
Estimated costRs 5.00 cr
Cost incurredRs 5.46 cr
Work done109.19%
BuildingWingEstimatedIncurred
EMPERIANARs 4.50 crRs 4.79 cr
-NARs 50.00 lakhRs 67.47 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISION ASSOCIATES
EngineerSANJAY DATTATRAY MORE
Chartered AccountantSPOC AND ASSOCIATES
Chartered AccountantSangar Hardikar and Company
PartnerRole in project
REVANTA ENGINEERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate.pdf15 Jul 2026
Withdrawal Update Form 2File: Engineers Certificate.pdf15 Jul 2026
Withdrawal Update Form 3File: CA Certificate.pdf15 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf15 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf15 Apr 2026
Withdrawal Update Form 1File: Architect Certificate.pdf10 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf10 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf10 Apr 2026
Withdrawal Update Form 1File: Architect Certificate .pdf9 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf9 Jan 2026
Withdrawal Update Form 3File: CA Certificate.pdf9 Jan 2026
Building plan approvalFile: Plan 1.pdf20 Nov 2025
Building plan approvalFile: Plan 2.pdf20 Nov 2025
Withdrawal Update Form 1File: Architect Certificate (18).pdf18 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate (11).pdf18 Nov 2025
Withdrawal Update Form 3File: Revanta - CA Certificate revised.pdf18 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-2025 Revanta Emperia.pdf18 Nov 2025
Withdrawal Update Form 1File: Architect Certificate (18).pdf10 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate (11).pdf10 Oct 2025
Withdrawal Update Form 3File: CA Certificate (9).pdf10 Oct 2025
Withdrawal Update Form 1File: Architect Certificate (8).pdf15 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate (5).pdf15 Jul 2025
Withdrawal Update Form 3File: CA Certificate (8).pdf15 Jul 2025
Building plan approvalFile: Plan 1.pdf10 Jul 2025
Building plan approvalFile: Plan 2.pdf10 Jul 2025
Building plan approvalFile: Plan 1.pdf10 Jul 2025
Building plan approvalFile: Plan 2.pdf10 Jul 2025
Commencement certificateFile: Revised CC.pdf10 Jul 2025
Form 1File: Architech Certificate.pdf10 Jul 2025
Form 2File: Engineer Certificate.pdf10 Jul 2025
Form 3File: CA Certificate.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf10 Jul 2025
Form 1File: architect certificate .pdf10 Jul 2025
Form 2File: Engineer certificate.pdf10 Jul 2025
Form 3File: CA Certificate.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Units.pdf10 Jul 2025
Form 1File: Architect Certificate.pdf10 Jul 2025
Form 2File: Engineer Certificate.pdf10 Jul 2025
Form 3File: CA Certificate.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate .pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Units.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate .pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Units.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate .pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Units.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Revanta Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Revanta Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Revanta Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Revanta Form 5.pdf7 Oct 2024
Form 1File: Architects Certificate.pdf4 Oct 2024
Form 2File: Engineer Certificate.pdf4 Oct 2024
Form 3File: Chartered Accountants Certificate.pdf4 Oct 2024

How this compares with Kolhapur

79%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep EMPERIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR MENON BUNGALOW880+ in Kolhapur

2 kmEMPERIACompleted 40Lapsed / revoked 19Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: REVANTA ENGINEERS AND DEVELOPERS

REVANTA ENGINEERS AND DEVELOPERS has 1 registration on MahaRERA, including EMPERIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if EMPERIA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EMPERIA?

The registered promoter entity is REVANTA ENGINEERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABAFR3964P1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EMPERIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EMPERIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EMPERIA?

The professionals named in the filing: Architect: VISION ASSOCIATES; Engineer: SANJAY DATTATRAY MORE; Chartered Accountant: SPOC AND ASSOCIATES; Chartered Accountant: Sangar Hardikar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMPERIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMPERIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMPERIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.