Registered No litigation declared Others project

EMINENT PRIDE

By SHREE PADMAMBA INFRA

RG-MH-56046 · RERA P53000055806 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
22 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

EMINENT PRIDE is a Others project by SHREE PADMAMBA INFRA in Kolhapur, Maharashtra, registered with MahaRERA as P53000055806 on 22 Apr 2024. Possession is promised by 31 Dec 2029. 6 of the 28 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameEMINENT PRIDE
  • TypeOthers
  • Location
    • E WARD NAGALA PARK
    • NEAR COLLECTOR OFFICE
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000055806
  • ReraGenie IDRG-MH-56046

Builder

  • NameSHREE PADMAMBA INFRA
  • Entity typePartnership
  • PartnersRAHUL ANANDRAO BHOSALE, NASHARODDIN MOHIDDIN INAMDAR, BHAVANENDRA BHALCHANDRA UPADHYE

Key dates

this monthRegisteredApr 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Apr 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Current status

21%6 of 28 units booked
26.8%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMINENT PRIDENA7632528

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

EMINENT PRIDE: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered164

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,353 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Feb 2026
LandownerVillageDistrict
ANIL RAMESH TANWANIKolhapur (M Corp.)Kolhapur
AMAR RAMESH TANWANIKolhapur (M Corp.)Kolhapur
JYOTI JAIRAM TANWANIKolhapur (M Corp.)Kolhapur
JAYIN JAIRAM TANWANIKolhapur (M Corp.)Kolhapur
RAJAT JAIRAM TANWANIKolhapur (M Corp.)Kolhapur
MADHUTAI HUNDRAJ BATHEJAKolhapur (M Corp.)Kolhapur
NARESH HUNDRAJ BATHEJAKolhapur (M Corp.)Kolhapur
NILESH HUNDRAJ BATHEJAKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKOLHAPUR MUNICIPAL CORPORATION
Permissible FSI3841.71
Proposed, not sanctioned3,842 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVITTHAL COMPLEX, 9TH LANE RAJARAMPURI, POORVARANG, MAHALAXMINAGAR, KOLHAPUR 416008
Estimated costRs 15.28 cr
Cost incurredRs 4.10 cr
Work done26.83%
BuildingWingEstimatedIncurred
EMINENT PRIDENARs 14.28 crRs 4.10 cr
-NARs 1.00 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA SQUARE THROUGH AMAR B UPADHYE
EngineerANANT V MURGUDE
Chartered AccountantNIDHI S KUMBHAR
Chartered AccountantK G B AND J ASSOCIATES
Chartered AccountantKEDAR KUMBHOJKAR AND COMPANY
Chartered AccountantKGB and J Associates
Chartered AccountantKedar Kumbhojkar and Co
PartnerRole in project
SHREE PADMAMBA INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf29 May 2026
Withdrawal Update Form 2File: Form 2.pdf29 May 2026
Withdrawal Update Form 3File: Form 3.pdf29 May 2026
Withdrawal Update Form 1File: Form 1.pdf27 May 2026
Withdrawal Update Form 1File: Form 1.pdf27 May 2026
Withdrawal Update Form 2File: Form 2.pdf27 May 2026
Withdrawal Update Form 2File: Form 2.pdf27 May 2026
Withdrawal Update Form 3File: Form 3.pdf27 May 2026
Withdrawal Update Form 3File: Form 3.pdf27 May 2026
Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf27 May 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-2026.pdf27 May 2026
Form 5 (FY 2024-2025)File: Form 5 -2024-2025.pdf27 May 2026
Form 1File: Form 1.pdf19 Feb 2026
Form 2File: Form 2.pdf19 Feb 2026
Form 3File: Form 3.pdf19 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf19 Feb 2026
Form 1File: Form 1.pdf19 Feb 2026
Form 2File: Form 2.pdf19 Feb 2026
Form 3File: Form 3.pdf19 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf19 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf22 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf26 Jun 2025
Building plan approvalFile: PLAN EMENENT PRIDE[1]_11zon (1).pdf17 May 2025
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf17 May 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN EMENENT PRIDE[1]_11zon (1).pdf17 May 2025
Disclosure of sold/ booked inventoryFile: discolsure of sold inventory.pdf17 May 2025
Declaration about Commencement CertificateFile: cc.pdf17 May 2025
Building plan approvalFile: PLAN.pdf7 May 2025
Building plan approvalFile: PLAN.pdf7 May 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf7 May 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf7 May 2025
Building plan approvalFile: Sanctioned Plan-1.pdf30 Apr 2025
Building plan approvalFile: Sanctioned Plan-2.pdf30 Apr 2025
Building plan approvalFile: Sanctioned Plan-3.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf30 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan-1.pdf30 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan-2.pdf30 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan-3.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf30 Apr 2025
Declaration about Commencement CertificateFile: Format D.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Upadhye.pdf5 Apr 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf27 Mar 2024
Layout approvalFile: Layout_0001.pdf12 Mar 2024
Building plan approvalFile: Sanctioned Plan.pdf12 Mar 2024
PAN CardFile: PAN Card.pdf12 Mar 2024
Copy of the legal title reportFile: Legal Title and Search Report.pdf12 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Concerned to Finance.pdf12 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Concerned to Legal.pdf12 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Concerned to Finance.pdf12 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Concerned to Legal.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout_0001.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan.pdf12 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf12 Mar 2024
Declaration in FORM BFile: Form B Declaration Promoter.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf12 Mar 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf12 Mar 2024

How this compares with Kolhapur

21%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep EMINENT PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR COLLECTOR OFFICE880+ in Kolhapur

2 kmEMINENT PRIDECompleted 53Lapsed / revoked 31Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 141 registered projects within 2 km.

Builder: SHREE PADMAMBA INFRA

SHREE PADMAMBA INFRA has 1 registration on MahaRERA, including EMINENT PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if EMINENT PRIDE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EMINENT PRIDE?

The registered promoter entity is SHREE PADMAMBA INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EMINENT PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EMINENT PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EMINENT PRIDE?

The professionals named in the filing: Architect: A SQUARE THROUGH AMAR B UPADHYE; Engineer: ANANT V MURGUDE; Chartered Accountant: NIDHI S KUMBHAR; Chartered Accountant: K G B AND J ASSOCIATES; Chartered Accountant: KEDAR KUMBHOJKAR AND COMPANY; Chartered Accountant: KGB and J Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMINENT PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMINENT PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMINENT PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.