EMINENCE PROJECT 2
RG-MH-63787 · RERA P52100018108 · Last updated on MahaRERA portal: 23 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 19 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 42 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EMINENCE PROJECT 2 is a Residential / Group Housing project by NAIKNAVAREDEVELPERSPVTLTD in Pune, Maharashtra, registered with MahaRERA as P52100018108 on 10 Oct 2018. Possession was promised by 29 Mar 2025 and is now 19 months past that date. The completion date has moved by 42 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameEMINENCE PROJECT 2
- TypeResidential / Group Housing
- Location
- VIMAN NAGAR
- LOHGAON
- Haveli
- Pune
- 411047
- Pincode411047
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018108
- ReraGenie IDRG-MH-63787
Builder
- NameNAIKNAVAREDEVELPERSPVTLTD
- Entity typeCompany
- CINU45200PN2007PTC131033
- DirectorHEMANT DATTAJI NAIKNAVARE
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Oct 2018
- Promised completion29 Mar 2025
- Revised completionRevised to 29 Mar 2025 (originally 30 Sep 2021)
- Buildings1 building record
- Documents filed155 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG B | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
BLDG B: 84% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed61
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAURI H NAIKNAVARE |
| Engineer | KRUPALI S KADAM |
| Engineer | sunil mulik |
| Partner | Role in project |
|---|---|
| NAIKNAVAREDEVELPERSPVTLTD | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, We have registered our Project EMINENCE PROJECT 2 No. P52100018108 under RERA. The completion date for the project is 30 TH SEPTEMBER 2021. But considering the COVID-19 situation, we are unable to complete our Project due to various reasons mentioned as under. As you are aware, due to lockdown announced by the Government of Maharashtra, the labours moved from site to their native places. Mostly the labours are from other States like UP, Bihar Orissa, Assam, and Rajasthan etc. The labour strength on site reduced drastically. At the same time there is shortage of material. As some fact
Reason as filed by the promoterTo MahaRERA MUMBAI Subject: Application for Extension of Project Completion Date for "Eminence Project 2" - RERA Registration Number: P52100018108 Dear Sir/Madam, We have registered under RERA with the project named "Eminence Project 2" [P52100018108], are writing to request an extension for the completion date of our project. As per the initial registration, the projected completion date for the "Eminence Project" was 29/03/2024. However, due to unforeseen circumstances, we have encountered certain delays in the construction process, leading to some remaining work to be completed till 29/03/2
Reason as filed by the promoterDate : 29.03.2023 To The Chief Engineer, RERA OFFICE, MUMBAI. Subject : Application for the Extension of "Eminence Project-2" Referance : Project Registration No. - P52100018108 Dear Sir, We have registered our "Eminence Project-2" vide P52100018108 as per RERA. Provisions. The completion date for the project is 30 th March 2023. But we are unable to complete our project due to various reasons mentioned as under. As you are aware, due to Post Covid-19 effect, the labour strength on site reduced drasticaIly and we are struggling to bring skilled labours . At the same Ùme there is sùdden price r
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 583/2013 | CIVIL JUDGE SENIOR DIVISION PUNE | PENDING |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000269700 | Naiknavare Group | Mrs. Sohan Lata Jha | 03/11/2023 |
| CC005000000471377 | SOHANLATA RAJU JHA | NAIKNAVARE DEVELOPERS | 24/07/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Sep 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Sep 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Sep 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Mar 2025
Documents filed155
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 155 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Eminence Building B - Disclosure Sold_Booked Inventry.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: Eminene Pro2.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eminence Pro2.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence Pro2.pdf | 8 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 4 - Eminence Pro2.pdf | 1 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eminenece Pro2.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE PRO 2 FORM 4 FULL OC.pdf | 27 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMI PRO 2 FULL OCCUPANCY BLDG B.pdf | 27 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMI PRO 2 PART OCCUPANCY B101 402.pdf | 27 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMI PRO 2 PART OCCUPANCY.pdf | 27 Mar 2025 |
| Other - TechnicalFile: EMI PRO 2 FULL OCCUPANCY BLDG B.pdf | 27 Mar 2025 |
| Other - TechnicalFile: EMINENCE PRO 2 FORM 4 FULL OC.pdf | 27 Mar 2025 |
| Other - TechnicalFile: EMI PRO 2 PART OCCUPANCY B101 402.pdf | 27 Mar 2025 |
| Other - TechnicalFile: EMI PRO 2 PART OCCUPANCY.pdf | 27 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY BLDG B 101,402.pdf | 20 Mar 2025 |
| Certificates of CA (Form 3)File: EMINENCE-2 MERGED _compressed.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: EMINENCE PRO 2.pdf | 16 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE RERA ARCH CERTIFICATE - BLDG B__ OCT NOV DEC (2024).pdf | 8 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE PRO 2.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: EMINENCE PRO 2.pdf | 8 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate em2.pdf | 6 Nov 2024 |
| Certificates of CA (Form 3)File: eminence-2 1-8_merged_compressed.pdf | 29 Oct 2024 |
| Certificates of CA (Form 3)File: Eminence 2 Form 3 Sept 24.pdf | 24 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENECE PROJECT 2.pdf | 15 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE RERA ARCH CERTIFICATE - BLDG B__ JULY AUG SEPT (2024).pdf | 9 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: EMINENCE PRO 2.pdf | 9 Oct 2024 |
| Certificates of CA (Form 3)File: Eminence Merged_compressed.pdf | 23 Jul 2024 |
| Certificates of CA (Form 3)File: EMINENCE 2 FIN.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: EMINENCE PRO2.pdf | 10 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: EMINENCE PRO 2.pdf | 10 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE PRO 2.pdf | 6 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eminence B2.pdf | 4 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: finance enc eminence pro 2.pdf | 31 May 2024 |
| Details of encumbrances concerned to LegalFile: finance enc eminence pro 2.pdf | 31 May 2024 |
| CERSAI detailsFile: CERSAI Search Report Debtor Based Eminence 2.pdf | 31 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account declaration Eminence pro 2.pdf | 31 May 2024 |
| Proforma of Agreement for saleFile: GetUserDocumentFileContent.pdf | 29 May 2024 |
| Certificates of CA (Form 3)File: EMINENCE 2 FINAL.pdf | 17 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY BLDG B.pdf | 6 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eminence 2 Form 2.pdf | 5 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: EMINENCE PRO 2.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eminence.pdf | 4 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE RERA ARCH CERTIFICATE - BLDG B__ JAN - March (2024).pdf | 2 Apr 2024 |
| OtherFile: Eminence.pdf | 2 Apr 2024 |
| Other - TechnicalFile: Final Fire NOC Bldg B.pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: Eminence Project-2-Final_compressed.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eminence.pdf | 6 Jan 2024 |
| OtherFile: Eminence.pdf | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: EMINENCE PRO 2.pdf | 3 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE 2.pdf | 2 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eminence pro 2.pdf | 2 Jan 2024 |
| OtherFile: Eminence.pdf | 16 Dec 2023 |
| Certificates of CA (Form 3)File: EMINENCE PROJECT-2 - Form 3 jul sep 23.pdf | 6 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Eminence Project-2-Form-5.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eminence B2.pdf | 10 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence Pro 2 -.pdf | 4 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EminencePro2 revised.pdf | 3 Oct 2023 |
| Certificates of CA (Form 3)File: Eminenece PRO 2 FORM 3 APR JUN 23.pdf | 1 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eminence B2.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence Pro2.pdf | 15 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Eminence-B.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 EMINENCE B BLDG.pdf | 7 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eminence Pro 2.pdf | 30 Jun 2023 |
| Certificates of CA (Form 3)File: Eminence Pro 2 - Form 3 -March 2023 compressed.pdf | 27 Jun 2023 |
| Certificates of CA (Form 3)File: Eminence P 2 July Sept 2021.pdf | 26 Apr 2023 |
| Certificates of CA (Form 3)File: Eminence P 2 FORM 3 OCT Dec 2021.pdf | 26 Apr 2023 |
| Certificates of CA (Form 3)File: Eminence Project-2 Apr June 2022.pdf | 26 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence Pro2 - Form 2 Jan To March 2023.pdf | 12 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Eminence B_compressed.pdf | 10 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 EMINENCE B RERA_JULY AUGUST SEPTEMBER 2022.pdf | 4 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE PRO 2 FORM 1 JAN MAR 23.pdf | 3 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Eminence form 2A JAN MAR 23.pdf | 3 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMC-2 Form1 Arch Certi 28032023.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: EMINENCE 2 RERA Form 3 Oct Dec 22.pdf | 8 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: EMINENCE PRO 2 SOLD UNSOLD PRO 2 DEC 22.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE RERA ARCH CERTIFICATE - BLDG B_(OCT-DEC 2022).pdf | 7 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Eminance P-2 March 2022 - Already Uploaded.pdf | 6 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence Pro2.pdf | 19 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 EMINANCE II Sept 22.pdf | 28 Dec 2022 |
| Certificates of CA (Form 3)File: Eminance Pro2 Form 5.pdf | 6 Dec 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MYSTIQUE MOODS B BLDG | S NO 230A-3-1 AND 231-1-1 LOHGAON | 32 | Completed | Mar 2015 | Late, Apr 2015 |
| SYLVAN HEIGHTS E BLDG | AUNDH PUNE | 37 | Completed | Sep 2013 | Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 155 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep EMINENCE PROJECT 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VIMAN NAGAR13,700+ in Pune
Filed coordinates, straight-line distance. 31 registered projects within 2 km.
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase II
SHRIRAM ASSOCIATES
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Solitaire Business Hub Viman Nagar Phase 1
Classic Promoters and Builders Private Lim
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
Builder: NAIKNAVAREDEVELPERSPVTLTD
NAIKNAVAREDEVELPERSPVTLTD has 1 registration on MahaRERA, including EMINENCE PROJECT 2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that EMINENCE PROJECT 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if EMINENCE PROJECT 2 is delayed beyond 29 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EMINENCE PROJECT 2?
The registered promoter entity is NAIKNAVAREDEVELPERSPVTLTD, a company as per the filing. Its CIN U45200PN2007PTC131033 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EMINENCE PROJECT 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against EMINENCE PROJECT 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for EMINENCE PROJECT 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EMINENCE PROJECT 2?
The professionals named in the filing: Architect: GAURI H NAIKNAVARE; Engineer: KRUPALI S KADAM; Engineer: sunil mulik. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EMINENCE PROJECT 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback