Registered No litigation declared Residential / Group Housing project

EMERALD WOODS 2

By SHREHIT DEVELOPERS

RG-MH-05440 · RERA P99000051317 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
18 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
52 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

EMERALD WOODS 2 is a Residential / Group Housing project by SHREHIT DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000051317 on 8 Jun 2023. Possession is promised by 31 Dec 2029. 53 of the 105 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete.

At a glance

Project

  • NameEMERALD WOODS 2
  • TypeResidential / Group Housing
  • Location
    • ARVIND PARK
    • NEAR ST WILLIBROARD SCHOOL
    • TARAPUR ROAD BOISAR
    • Kurgaon
    • Palghar
    • 401502
  • Pincode401502
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000051317
  • ReraGenie IDRG-MH-05440

Builder

  • NameSHREHIT DEVELOPERS
  • Entity typePartnership
  • PartnersHARESH FIFADRA, VIJAY MAMTORA, VARSHA FIFADRA, KIRITA SHAH, JAYSHREE SHAH, SAMRAT MAMTORA, SHANTA DAGA, MAMTA DAGA, HIRAL MAMTORA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJun 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed98 files

Current status

50%53 of 105 units booked
65.4%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 3NA8726026
BUILDING NO 2NA8728028
BUILDING NO 4 A WING AND B WINGNA8751051

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

BUILDING NO 382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 288%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
BUILDING NO 4 A WING AND B WING32%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes75%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed141

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots141
Closed/Covered110
Open Space31
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 3251136
BUILDING NO 240040
BUILDING NO 4 A WING AND B WING452065

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Dec 2025

Approvals and building plan

Sanctioning authorityCOLLECTER OFFICE PALGHAR
Permissible FSI9277.35
Proposed, not sanctioned9,262 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFIRST FLOOR FLAT NO 129 AND 130 WING H RAJ ARCADE NEAR JAIN TEMPLE KANDIVALI WEST MUMBAI 400067
Estimated costRs 21.15 cr
Cost incurredRs 13.83 cr
Work done65.38%
BuildingWingEstimatedIncurred
BUILDING NO 4 A WING AND B WINGNARs 8.35 crRs 2.50 cr
BUILDING NO 2NARs 5.21 crRs 5.21 cr
BUILDING NO 3NARs 4.31 crRs 4.31 cr
-NARs 3.29 crRs 1.81 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSKYLINE ARCHITECT
EngineerRIYA ENTERPRISES
Chartered AccountantMAMTA SHAH & CO
PartnerRole in project
SHREHIT DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: MERGED FORM1.pdf1 May 2026
Withdrawal Update Form 2File: Qty Surveyor report EW2_31st March 2026.pdf1 May 2026
Withdrawal Update Form 3File: CA Certificate 31st March 2026_compressed.pdf1 May 2026
Withdrawal Update Form 1File: Form 1 bldg 2 and 4.pdf29 Jan 2026
Withdrawal Update Form 2File: form2.pdf29 Jan 2026
Withdrawal Update Form 3File: form 3_compressed.pdf29 Jan 2026
Withdrawal Update Form 1File: SKYLINE_11zon.pdf1 Dec 2025
Withdrawal Update Form 1File: FORM 1 (2).pdf1 Dec 2025
Withdrawal Update Form 2File: Qty Surveyor report EW2_30th June 2025.pdf1 Dec 2025
Withdrawal Update Form 2File: Qty Surveyor report EW2_30th Sept 2025.pdf1 Dec 2025
Withdrawal Update Form 3File: C A Certificate - 30th June 2025.pdf1 Dec 2025
Withdrawal Update Form 3File: C A Certificate - 30th Sept 2025_11zon.pdf1 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate - 31st Mar 2025_compressed.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Qty Surveyor report EW2_31st March 2025.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Bookings Disclosure 2.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Bookings Disclosure 3.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Bookings Disclosure 4.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Bldg 2 - 31st Dec 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Bldg 3 - 31st Dec 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Bldg 4 - 31st Dec 2024.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate - 31st Dec.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Qty Surveyor report EW2_31st Dec 2024.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Statement CA 2023 2024 .pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Statement CA 2023 2024 .pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg TWO.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Bldg 3.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Bldg 4.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate - 30th Sept 2024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Qty Surveyor report EW2_30th Sept 2024.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold_Booked statement.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Bldg no 2.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Bldg No 3.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Bldg No 4.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EMERAL WOODS 2 CA.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg 3 - Architect certificate 01102023.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg 4 - Architect certificate 01102023.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Qty Surveyor certificate 01102023.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (16)_compressed.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Archt Certifcate - BLDG2.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHT Certifcate - BLDG3.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHT Certifcate - BLDG4.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA ENGG Certifcate.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf16 Sep 2023
Details of encumbrances concerned to FinanceFile: legal (1).pdf31 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter finance.pdf31 May 2023
Details of encumbrances concerned to LegalFile: legal (1).pdf31 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter finance.pdf31 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter EW2.pdf19 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter EW2.pdf19 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3A EW2_merged_compressed.pdf19 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank AC details - RERA.pdf19 May 2023
Proforma of Agreement for saleFile: MODEL AGREEMENT.pdf8 May 2023
Deviation Report with respect to Allotment letterFile: Allotment letter Bldg no2.pdf8 May 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter Bldg no4.pdf8 May 2023
Deviation Report with respect to Allotment letterFile: Allotment letter Bldg no3.pdf8 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT PART1.pdf8 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT PART2.pdf8 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT PART3.pdf8 May 2023
Other - LegalFile: Deed of Declaration _compressed.pdf8 May 2023
Other - LegalFile: CA Title Confirmation _compressed.pdf8 May 2023
Disclosure of sold/ booked inventoryFile: EW2 Disclosure UnSold Bldg 2.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: EW2 Disclosure Unsold Bldg 3.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: EW2 Disclosure Unsold Bldg 4.pdf14 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PartnerDisclosure-HSM NEW.pdf14 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PartnerDisclosure-SVM NEW.pdf14 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PartnerDisclosure-VHF.pdf14 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PartnerDisclosure-VNM NEW.pdf14 Apr 2023
Layout approvalFile: LAYOUTPARKING_compressed.pdf13 Apr 2023
Building plan approvalFile: 2ND BUILDING_compressed.pdf13 Apr 2023
Building plan approvalFile: BUILDING 3_compressed.pdf13 Apr 2023
Building plan approvalFile: BUILDING 4_compressed.pdf13 Apr 2023
Building plan approvalFile: BUILDING 4-2_compressed.pdf13 Apr 2023
PAN CardFile: 1 PAN Card (1).pdf13 Apr 2023
Copy of the legal title reportFile: Title search report- Dtd 25012023.pdf13 Apr 2023
Details of encumbrances concerned to FinanceFile: legal.pdf13 Apr 2023
Details of encumbrances concerned to LegalFile: legal.pdf13 Apr 2023

How this compares with Palghar

50%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EMERALD WOODS 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TARAPUR ROAD BOISAR3,200+ in Palghar

2 kmEMERALD WOODS 2Completed 17Lapsed / revoked 13Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: SHREHIT DEVELOPERS

SHREHIT DEVELOPERS has 2 registrations on MahaRERA, including EMERALD WOODS and EMERALD WOODS 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if EMERALD WOODS 2 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EMERALD WOODS 2?

The registered promoter entity is SHREHIT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EMERALD WOODS 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EMERALD WOODS 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EMERALD WOODS 2?

The professionals named in the filing: Architect: SKYLINE ARCHITECT; Engineer: RIYA ENTERPRISES; Chartered Accountant: MAMTA SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMERALD WOODS 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMERALD WOODS 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMERALD WOODS 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.