Home / Browse projects / Raigarh, Maharashtra / ELITE VIVANTA

Registered No litigation declared Others project

ELITE VIVANTA

By NATHDWARA DEVELOPERS PRIVATE LIMITED

RG-MH-07168 · RERA P52000054784 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 90%
84 of 95Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

ELITE VIVANTA is a Others project by NATHDWARA DEVELOPERS PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000054784 on 12 Feb 2024. Possession is promised by 31 Dec 2027. 11 of the 95 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameELITE VIVANTA
  • TypeOthers
  • Location
    • PLOT NO-38C
    • SECTOR 15
    • KHARGHAR
    • NAVI MUMBAI
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • RERA no.P52000054784
  • ReraGenie IDRG-MH-07168

Builder

  • NameNATHDWARA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsAAKRITI GAURAV AGARWAL, DIVYA SAURABH AGARWAL
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

12%11 of 95 units booked
36.8%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ELITE VIVANTANA2622811495

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

ELITE VIVANTA: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered76

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,051 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9898.09
Proposed, not sanctioned9,898 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEVGIRI BANKING COMPLEX ,PHASE II,sECTOR-19C,VASHI TURBHE,NAVI MUMBAI-400703
Estimated costRs 35.30 cr
Cost incurredRs 13.00 cr
Work done36.83%
BuildingWingEstimatedIncurred
ELITE VIVANTANARs 32.75 crRs 13.00 cr
-NARs 2.55 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSoyuz Talib Architect Pvt Ltd.
EngineerAssociated Structural Consultants LLP
Chartered AccountantH M SHAH & ASSOCIATES
Chartered AccountantP. R. VORA & ASSOCIATES
PartnerRole in project
NATHDWARA DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4 FY 25-26.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 25-26.pdf11 May 2026
Withdrawal Update Form 3File: Form-3 Q4 25-26_.pdf11 May 2026
Withdrawal Update Form 1File: Form1 Q3 FY 25-26.pdf31 Jan 2026
Withdrawal Update Form 2File: Form2 Q3 FY 25-26.pdf31 Jan 2026
Withdrawal Update Form 3File: Form3 Q3 FY 25-26.pdf31 Jan 2026
Withdrawal Update Form 1File: Form1 Q2 FY 25-26.pdf23 Dec 2025
Withdrawal Update Form 2File: Form2 Q 2 FY 25-26.pdf23 Dec 2025
Withdrawal Update Form 3File: FORM3 Q2 25-26..pdf23 Dec 2025
Withdrawal Update Form 1File: Form -1 Q1 FY 25-26.pdf19 Aug 2025
Withdrawal Update Form 2File: Form 2 Q 1 FY 25-26.pdf19 Aug 2025
Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf19 Aug 2025
Withdrawal Update Form 1File: Form -1 Q1 FY 25-26.pdf28 Jul 2025
Withdrawal Update Form 2File: Form 2 Q 1 FY 25-26.pdf28 Jul 2025
Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf28 Jul 2025
Withdrawal Update Form 1File: Form -1 Q1 FY 25-26.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Q 1 FY 25-26.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 Q1 FY 25-26.pdf19 Jul 2025
Form 1File: Form -1 Architect's Certificate 2024-03-31.pdf27 May 2025
Form 2File: form 2.pdf27 May 2025
Form 3File: final form 3.pdf27 May 2025
Form 1File: Form-1.pdf27 May 2025
Form 2File: FORM 2.pdf27 May 2025
Form 3File: Final FORM 3.pdf27 May 2025
Form 1File: Form-1.pdf27 May 2025
Form 2File: Final FORM 2.pdf27 May 2025
Form 3File: Final FORM 3.pdf27 May 2025
Form 1File: FORM 1.pdf27 May 2025
Form 2File: Final FORM 2.pdf27 May 2025
Form 3File: Final FORM 3.pdf27 May 2025
Form 1File: Final FORM 1.pdf27 May 2025
Form 2File: Final FORM 2.pdf27 May 2025
Form 3File: Final FORM 3.pdf27 May 2025
Form 5 (FY 2023-2024)File: Final FORM 5.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final FORM 2.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final FORM 2.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final FORM 2.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final FORM 2.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final FORM 2.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final FORM 5.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate 2024-03-31.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final form 3.pdf30 Apr 2024
Deviation Report with respect to model copy of AgreementFile: deviation of AFS.pdf25 Jan 2024
Deviation Report with respect to model copy of AgreementFile: DRAFT TO AFS.pdf2 Jan 2024
Other - LegalFile: AGREEMENT TO LEASE VIVANTA_11zon.pdf2 Jan 2024
Other - TechnicalFile: Rera mailed.pdf12 Dec 2023
Proforma of Agreement for saleFile: DRAFT TO AFS.pdf6 Dec 2023
CERSAI detailsFile: cERSAI LETTER N REPORT.pdf4 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf4 Dec 2023
Deviation Report with respect to Allotment letterFile: DECLARATION -DEVIATION REPORT ALLOTMENT.pdf1 Dec 2023
Layout approvalFile: CC Layout plan.pdf27 Nov 2023
Layout approvalFile: LAYOUT PLAN2.pdf27 Nov 2023
Layout approvalFile: LAYOUT PLAN3.pdf27 Nov 2023
Layout approvalFile: LAYOUT PLAN4.pdf27 Nov 2023
Building plan approvalFile: LAYOUT PLAN5.pdf27 Nov 2023
PAN CardFile: NDPL PAN CARD.pdf27 Nov 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf27 Nov 2023
Details of encumbrances concerned to FinanceFile: fianance n legal encumbrance.pdf27 Nov 2023
Details of encumbrances concerned to LegalFile: fianance n legal encumbrance.pdf27 Nov 2023
Copy of Layout Approval (in case of layout)File: CC Layout plan.pdf27 Nov 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN2.pdf27 Nov 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN3.pdf27 Nov 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN4.pdf27 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN5.pdf27 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC copy.pdf27 Nov 2023
Declaration about Commencement CertificateFile: Declaration of cc.pdf27 Nov 2023
Declaration in FORM BFile: FORM B.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 sign.pdf27 Nov 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ELITE GRANDEURPLOT NO 18 SECTOR 10 KHARGHAR 41021148CompletedDec 2017Late, May 2018
ELITE HEIGHTSPLOT NO 176 178 191 SECTOR 10 KHARGHAR 41021050CompletedJul 2012Late, Nov 2012

How this compares with Raigarh

12%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELITE VIVANTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARGHAR,NAVI MUMBAI5,900+ in Raigarh

Builder: NATHDWARA DEVELOPERS PRIVATE LIMITED

NATHDWARA DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including ELITE VIVANTA. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ELITE VIVANTA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELITE VIVANTA?

The registered promoter entity is NATHDWARA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELITE VIVANTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ELITE VIVANTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELITE VIVANTA?

The professionals named in the filing: Architect: Soyuz Talib Architect Pvt Ltd.; Engineer: Associated Structural Consultants LLP; Chartered Accountant: H M SHAH & ASSOCIATES; Chartered Accountant: P. R. VORA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELITE VIVANTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELITE VIVANTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELITE VIVANTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.