Home / Browse projects / Mumbai Suburban, Maharashtra / EKTA TRINITY
EKTA TRINITY
By EKTA HOUSING PRIVATE LIMITED
RG-MH-20390 · RERA P51800005021 · Last updated on MahaRERA portal: 6 Sep 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EKTA TRINITY is a Residential / Group Housing project by EKTA HOUSING PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005021 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022.
At a glance
Project
- NameEKTA TRINITY
- TypeResidential / Group Housing
- Location
- 2nd Hasnabad Ln
- Willingdon
- Santacruz West
- Andheri
- Mumbai Suburban
- 400054
- Pincode400054
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005021
- ReraGenie IDRG-MH-20390
Builder
- NameEKTA HOUSING PRIVATE LIMITED
- Entity typeCompany
- CINU45200MH1990PTC058279
- GSTIN27AAACE2460K1ZP
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsVIVEK ASHOK MOHANANI, ASHOK GOBINDRAM MOHANANI
- Other registrations8 more →
- Completed5 of 9
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Aug 2017
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings3 building records
- Documents filed45 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING B | NA | 17 | 0 | 0 | 0 | 0 |
| WING A | NA | 16 | 0 | 0 | 0 | 0 |
| WING C | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 6 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 98%.
WING B94%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 53% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
WING A94%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 53% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
WING C94%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 53% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities20
As on 6 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Lawn | Yes | 0% |
| GYMNASIUM | Yes | 0% |
| COMMON BASEMENTS AND PODIUM | Yes | 100% |
| Children Play Area | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A R MEHTA & ASSOCIATES |
| Engineer | JW CONSULTANTS LLP |
| Partner | Role in project |
|---|---|
| EKTA HOUSING PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Nov 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Apr 2022
Documents filed45
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Trinity Form2A.pdf | 6 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 EKTA TRINITY.pdf | 6 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: TRINITY QUALITY ASSURANCE 21-22.pdf | 3 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Ekta Trinity Sold Unsold Data.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Ekta Trinity Sold Unsold Inventory.pdf | 6 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ekta Trinity CTS H 399.pdf | 1 Nov 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: EW TRINITY RERA FORM 4.pdf | 4 May 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_signed.pdf | 28 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: EKTA TRINITY AS ON 31-3-2022.pdf | 8 Apr 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration certificate TRINITY.pdf | 15 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Ekta Trinity RERA SOLD.pdf | 6 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: EKTA TRINITY.pdf | 30 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA 20-21 Ekta Trinity.pdf | 6 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Ekta Trinity.pdf | 6 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Ekta Trinity.pdf | 6 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: TRINITY SOLD INVENTORY_compressed (1).pdf | 25 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: TRINITY CC 15-04-2021.pdf | 23 Jun 2021 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 23 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Ekta Trinity.pdf | 10 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Trinity.pdf | 16 Nov 2019 |
| Certificates of CA (Form 5)File: Trinity.pdf | 11 Oct 2019 |
| Certificates of CA (Form 5)File: Trinity 04102018105842.pdf | 9 Oct 2018 |
| Details of encumbrancesFile: emcumbrance letter 19092018125330_001.pdf | 19 Sep 2018 |
| Details of encumbrancesFile: index ii of piramal 19092018122234_001.pdf | 19 Sep 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Trinity Society.pdf | 5 Apr 2018 |
| Building plan approvalFile: COVERING LETTER.pdf | 6 Nov 2017 |
| Building Plan Approval (IOD)File: COVERING LETTER.pdf | 6 Nov 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC R2.pdf | 6 Nov 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH-CERT-TRINITY31-7-17.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate 31-07-2017.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Letter for Agreement 31-07-2017.pdf | 31 Jul 2017 |
| OtherFile: PROPOSED PLANS 31-7-17.pdf | 31 Jul 2017 |
| OtherFile: Letter for Additional Area 31-07-2017.pdf | 31 Jul 2017 |
| Layout approvalFile: LAYOUT.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 29 Jul 2017 |
| Building plan approvalFile: TRINITY IOD PART 1.pdf | 28 Jul 2017 |
| Building plan approvalFile: TRINITY IOD PART 2.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate from Adv- Satish Mishra 29-05-2014.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Letter for encumbrance.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: TRINITY IOD PART 1.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: TRINITY IOD PART 2.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: TRINITY CC.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Form B Declaration.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 28 Jul 2017 |
| PAN CardFile: EHPL Pan Card.pdf | 25 Jul 2017 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| EKTA GREENVILLE WING F,G,H,L,M,N | SURVEY NO 231 AT PATHARDI NASHIK - 422 010 | 192 | Completed | Mar 2017 | Late, Jul 2017 |
| EKTA CALIFORNIA WING A,B,C,D,E | Survey No 9 Hissa No 1 Part Undri Pune | 120 | Completed | Mar 2015 | Late, Jul 2015 |
| EKTA GREENVILLE ROW HOUSES AND VILLAS | SURVEY NO 231 AT PATHARDI NASHIK - 422 010 | 20 | Completed | May 2014 | Late, Jul 2017 |
| EKTA GREENVILLE ROW HOUSE NO 29 AND 30 | SURVEY NO 231 AT PATHARDI NASHIK - 422 010 | 2 | Completed | Jul 2012 | Jul 2012 |
| EKTA GREENVILLE WING A, B, C, D, E, K | SURVEY NO 231 AT PATHARDI NASHIK - 422 010 | 192 | Completed | Apr 2012 | Late, Jul 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 45 filed documents as one ZIP, foldered, with a manifest
Keep EKTA TRINITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Santacruz West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 326 registered projects within 2 km.
AVIARA
BALUWALA BUILDERS
Ruparel Panache
Ruparel Infra & Realty Pvt Ltd
Vascon Orchids
Vascon Engineers Ltd
COMMERZ 54
SHREE VINAYAK REALITY PRIVATE LIMITED
Vascon Onyx Residences
Vascon Engineers Ltd
REDEVELOPMENT OF SHINING STAR CHSL
PRANAV CONSTRUCTIONS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: EKTA HOUSING PRIVATE LIMITED
EKTA HOUSING PRIVATE LIMITED has 9 registrations on MahaRERA, including EKTA GREENVILLE PHASE 1 WING I AND J and EKTA GREENVILLE PHASE 2 WING O , P , Q AND R. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if EKTA TRINITY is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EKTA TRINITY?
The registered promoter entity is EKTA HOUSING PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH1990PTC058279 and GSTIN 27AAACE2460K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EKTA TRINITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EKTA TRINITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EKTA TRINITY?
The professionals named in the filing: Architect: A R MEHTA & ASSOCIATES; Engineer: JW CONSULTANTS LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EKTA TRINITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback