Home / Browse projects / Palghar, Maharashtra / EKTA PARKSVILLE PHASE I
EKTA PARKSVILLE PHASE I
By EKTA PARKSVILLE HOMES PVT. LTD.
RG-MH-08193 · RERA P99000000116 · Last updated on MahaRERA portal: 30 Jun 2025
Source: official MahaRERA filing
Red flags
- 26 complaints at MahaRERA
- Completion date moved by 43 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EKTA PARKSVILLE PHASE I is a Residential / Group Housing project by EKTA PARKSVILLE HOMES PVT. LTD. in Palghar, Maharashtra, registered with MahaRERA as P99000000116 on 4 Jul 2017. The registration is recorded completed; possession was promised by 27 Jul 2023. The completion date has moved by 43 months from the original filing. 26 complaints are on record with the regulator.
At a glance
Project
- NameEKTA PARKSVILLE PHASE I
- TypeResidential / Group Housing
- Location
- Near Yazoo Park
- Virar
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401303
- Pincode401303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000000116
- ReraGenie IDRG-MH-08193
Builder
- NameEKTA PARKSVILLE HOMES PVT. LTD.
- Entity typeCompany
- CINU70102MH1988PTC050060
- GSTIN27AAACW4316N1Z2
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsDILIP LAXMAN BORHADE, PRAKASH TRIBHUVANDAS TANNA, DILIP LAXMAN BORHADE, PRAKASH TRIBHUVANDAS TANNA
- Other registrations6 more →
- Completed5 of 7
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Jul 2017
- Promised completion27 Jul 2023
- Revised completionRevised to 27 Jul 2023 (originally 31 Dec 2019)
- Buildings9 building records
- Documents filed119 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CENTRAL PARK A WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK B WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK C WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK D WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK E WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK F WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK G WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK H WING | NA | 17 | 0 | 0 | 0 | 0 |
| CENTRAL PARK K WING | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building9
As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
91 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 89%.
CENTRAL PARK A WING98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 83% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK B WING98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 83% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK C WING99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 89% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK D WING99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 89% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK E WING99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 84% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK F WING99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 88% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK G WING99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 84% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK H WING98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 82% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CENTRAL PARK K WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities19
As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Shrub Beds | Yes | 100% |
| Jogging Track | Yes | 100% |
| Children Play Area | Yes | 100% |
| Gazebo | Yes | 100% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| CENTRAL PARK A WING | 1 | 1 |
| CENTRAL PARK B WING | 1 | 1 |
| CENTRAL PARK C WING | 1 | 1 |
| CENTRAL PARK D WING | 1 | 1 |
| CENTRAL PARK F WING | 1 | 1 |
| CENTRAL PARK G WING | 1 | 1 |
| CENTRAL PARK H WING | 1 | 1 |
| CENTRAL PARK K WING | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJAY WADE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| EKTA PARKSVILLE HOMES PVT. LTD. | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Scarcity of availability of the resources and also some technical reasons.
Reason as filed by the promoterDue to following force majeure conditions project got delayed:- 1. Non availability of Building Material 2. Stop Work notices issued time to time by VVCMC 3. Delay in getting permissions from the Environments and Pollution Department 4. Lockdown Due to Novel Corona Virus Pandemic. 5. Non Availability of Labor due to Covid
Reason as filed by the promoterReason as per attached herewith.
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 887/2016 | BOMBAY CITY CIVIL COURT | withdrawal |
| 889/2016 | BOMBAY CITY CIVIL COURT | withdrawal |
| 890/2016 | BOMBAY CITY CIVIL COURT | withdrawal |
| 398/2014 | STATE COMMISSION MAHARASHTRA | PENDING |
Complaints filed with MahaRERA26
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000791 | DHARMESH BHAU / REENA BHAU | EKTA PARKESVILLE HOMES PVT LTD | 21/09/2017 |
| CC006000000001418 | Tejas Patel | Ekta World-Ashok Mohanani | 30/10/2017 |
| CC006000000195910 | NEERA ABHAY SINGH | Ekta parksville homes pvt ltd | 07/02/2021 |
| CC006000000023361 | NIDHI MEHTA | VIVEK ASHOK MOHNANI | 15/02/2018 |
| CC006000000054840 | DAVID ALBERT D'SILVA | EKTA PARKSVILLE HOMES PRIVATE LIMITED | 13/06/2018 |
| CC006000000055796 | Francis Baptist D'cunha and Baptista Francis D'cunha | M/S Ekta Parksville Homes Pv.t Ltd. | 16/08/2018 |
| CC006000000057504 | Mrs. Mayuri Asar and Mrs. Bharati Asar | Ekta Parksville Homes Private Limited | 07/04/2019 |
| CC006000000056634 | SONOO SAINANEY AND RAJ SAINANEY | EKTA PARKSVILLE HOMES PVT LTD | 19/10/2018 |
| CC006000000056960 | ANTHONY MENEZES | EKTA PARKSVILLE HOMES PVT. LTD. | 18/11/2018 |
| CC006000000078739 | MRS LAXMI LALWANI | Ekta Parksville Homes Private Limited, Mr Savio D'Mello | 01/04/2019 |
| CC006000000089587 | RONAK ANIL GAGLANI | EKTA PARKSVILLE HOMES PVT LTD | 06/06/2019 |
| CC006000000100250 | Shakeel Ahmed Khan | Ekta Parksville Homes Pvt. Ltd. | 24/07/2019 |
| CC006000000171485 | PRAKASH BHANSALI | Ekta Parks Ville Homes Pvt Ltd | 10/11/2019 |
| CC006000000196518 | Shiv Singh Negi | Ekta Parksville Homes Private Limited | 26/03/2021 |
| CC006000000196581 | VARGHESE GEORGE | EKTA PARKSVILLE HOMES PVT. LTD | 13/04/2021 |
| CC006000000220789 | AJITKUMAR S GUPTA | M/s Ekta Parks ville Homes Private Limited | 12/04/2022 |
| CC006000000251733 | Vallabh Ram Bhatia | Ekta World | 06/07/2022 |
| CC006000000333946 | KUNAL PRATAP SHAH | M/S EKTA PARKSVILLE HOMES PVT. LTD. | 13/01/2023 |
| CC006000000375060 | VIJAYAPRIYA RAJAGOPALAN | Ekta Parksville Homes Private Limited | 31/03/2023 |
| CC006000000396527 | Meghana Mandar Talim | Ekta Parksville Homes Private Limited | 03/07/2023 |
| CC006000000591322 | RAMILA SANJAY JAIN | M/S EKTA PARKSVILLE HOMES PVT LTD. | 25/07/2024 |
| CC006000000591324 | JASHODA HASTIMAL JAIN | M/s Ekta Parksville Homes Pvt Ltd | 25/07/2024 |
| CC006000000591326 | ARUNA DILIPKUMAR JAIN | M/s Ekta Parksville Homes Pvt Ltd. | 25/07/2024 |
| CC12502285 | Piyush Kantilal Chauhan | EKTA PARKSVILLE HOMES PVT. LTD. | 07/07/2025 |
| CC12504182 | Mrs Reeta Kapur | EKTA PARKSVILLE HOMES PVT. LTD. | 26/11/2025 |
| CC12600489 | KHODIDAS ARJUN CHARANIA | EKTA PARKSVILLE HOMES PVT LTD | 27/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Jul 2023
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW PARKSVILLE PHASE I WING A TO H K FORM 1 27-7-2023 .pdf | 30 Jun 2025 |
| Certificates of CA (Form 3)File: signed form 3 PV P I 27_07_2023.pdf | 30 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed EP PHASE I form 2 27_07_23.pdf | 30 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PARKSVILLE PHASE I FORM 2A 23-24.pdf | 6 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PARKSVILLE PHASE I.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Parksville Phase I 30092023.pdf | 9 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: EKTA P P I.pdf | 3 Aug 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: virar OC 28072023.pdf | 30 Jul 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: virar OC 28072023.pdf | 30 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: EKTA PARKSVILLE-PH-I.pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE 22-23.pdf | 22 Jun 2023 |
| Certificates of CA (Form 3)File: Final form 3 Ekta Parksville Phase I 31 MAY 23.pdf | 22 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SIGNED EW PARKSVILLE PHASE I FORM1 31 MAR 23.pdf | 21 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 EPPI 31 MAY 23.pdf | 21 Jun 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: EKTA PARKSVILLE CENTRAL A TO H PHASE I.pdf | 12 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: EP P I.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Parksville I.pdf | 15 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Ekta Parskville Phase I.pdf | 27 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Ekta Parskville Phase I.pdf | 27 Feb 2023 |
| Declaration about Commencement CertificateFile: EKTA PARKSVILLE PHASE I CC DECLARATION 20-02-2023.pdf | 27 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW PARKSVILLE PHASE I WING K ARCH CERT FORM 1 20-2-2023.pdf | 27 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW PARKSVILLE PHASE I WING K ARCH CERT FORM 1 20-2-2023.pdf | 27 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EW PARKSVILLE PHASE I FORM 2A Quality Assurance Certificate 31-12-2020.pdf | 27 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EW PARKSVILLE PHASE I FORM 2A Quality Assurance Certificate 31-12-2022.pdf | 27 Feb 2023 |
| CERSAI detailsFile: Parksville.pdf | 20 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Virar C P GOYAL.pdf | 20 Feb 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE - Central Park - Parksville Phase I.pdf | 15 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: EP PHASE I.pdf | 15 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: parksville phase I.pdf | 29 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: PARKSVILLE I.pdf | 9 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Ekta Parksville I.pdf | 14 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: parksville I.pdf | 5 Apr 2022 |
| Declaration about Commencement CertificateFile: Declaration about commencement.pdf | 4 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: brooklyn park I.pdf | 7 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: PARKSVILLE PHASE I.pdf | 7 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PARKSVILLE PHASE I.pdf | 31 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: parksville phase I.pdf | 19 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA 20-21 PARKSVILLE PHASE 1.pdf | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: 20210831160938-1-7.pdf | 30 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: 20210831160938-8-14.pdf | 30 Aug 2021 |
| Certificates of CA (Form 5)File: Ekta Parksville Phase I.pdf | 9 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Ekta Parksville Phase I.pdf | 9 Feb 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Parksville.pdf | 6 Feb 2021 |
| Details of encumbrancesFile: Index-2 Jm 20 Crs.pdf | 3 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Virar phase I.pdf | 16 Nov 2019 |
| Certificates of CA (Form 5)File: Virar phase I.pdf | 11 Oct 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PHASE ICentral Park AtoH Society formation application.pdf | 16 Sep 2019 |
| OtherFile: Virar OC.pdf | 17 May 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Central Park.pdf | 7 Jan 2019 |
| Certificates of CA (Form 5)File: Parksville Phase I 04102018110643.pdf | 9 Oct 2018 |
| OtherFile: MOEF-Pollution Dept Permission-1-5.pdf | 16 Aug 2018 |
| OtherFile: MOEF-Pollution Dept Permission-6-10.pdf | 16 Aug 2018 |
| OtherFile: Virar tree NOC 18-07-18.pdf | 7 Aug 2018 |
| OtherFile: OC APPLICATION 24112017.pdf | 7 Aug 2018 |
| OtherFile: Virar OC submission 2018.pdf | 7 Aug 2018 |
| OtherFile: Final Fire NOC B13-14-15.pdf | 7 Aug 2018 |
| OtherFile: Final Fire NOC B8-9-13AB.pdf | 7 Aug 2018 |
| Details of encumbrancesFile: Parksville.pdf | 7 Apr 2018 |
| Details of encumbrancesFile: JMF-Indenture of Mortgage-2423-2018-303-303.pdf | 7 Apr 2018 |
| Details of encumbrancesFile: Index II TATA Capital.pdf | 30 Nov 2017 |
| Proforma of Allotment letterFile: Allottment Letter and AFS- Central Park final - 28-06-2017.pdf | 28 Jun 2017 |
| Layout approvalFile: covering letter for virar layout 1.pdf | 27 Jun 2017 |
| Building plan approvalFile: Bldg-13 Wing-A Phase-I (1).pdf | 27 Jun 2017 |
| Building plan approvalFile: Bldg-13 Wing-A Phase-I (2).pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-B PLAN.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-B SECTION.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-C PLAN.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-C PLAN 1.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-C SECTION.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-D PLAN.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-D SECTION.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-E PLAN.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-E SECTION.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-F PLAN.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-F PLAN 1.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-F SECTION.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-G PLAN.pdf | 27 Jun 2017 |
| Building plan approvalFile: PHASE I WING-G SECTION.pdf | 27 Jun 2017 |
| Building plan approvalFile: Bldg-15 Wing-H Phase-I(1).pdf | 27 Jun 2017 |
| Building plan approvalFile: Bldg-15 Wing-H Phase-I_2_001.pdf | 27 Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 119 filed documents as one ZIP, foldered, with a manifest
Keep EKTA PARKSVILLE PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Virar3,200+ in Palghar
Filed coordinates, straight-line distance. 147 registered projects within 2 km.
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: EKTA PARKSVILLE HOMES PVT. LTD.
EKTA PARKSVILLE HOMES PVT. LTD. has 7 registrations on MahaRERA, including EKTA PARKSVILLE PHASE I and EKTA PARKSVILLE PHASE II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if EKTA PARKSVILLE PHASE I is delayed beyond 27 Jul 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EKTA PARKSVILLE PHASE I?
The registered promoter entity is EKTA PARKSVILLE HOMES PVT. LTD., a company as per the filing. Its CIN U70102MH1988PTC050060 and GSTIN 27AAACW4316N1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EKTA PARKSVILLE PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against EKTA PARKSVILLE PHASE I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for EKTA PARKSVILLE PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EKTA PARKSVILLE PHASE I?
The professionals named in the filing: Architect: AJAY WADE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EKTA PARKSVILLE PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback