Home / Browse projects / Palghar, Maharashtra / EKTA PARKSVILLE PHASE I

Completed No litigation declared Residential / Group Housing project

EKTA PARKSVILLE PHASE I

By EKTA PARKSVILLE HOMES PVT. LTD.

RG-MH-08193 · RERA P99000000116 · Last updated on MahaRERA portal: 30 Jun 2025

Source: official MahaRERA filing

Red flags

  • 26 complaints at MahaRERA
  • Completion date moved by 43 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2023Possession promisedregistration recorded completed
91 of 99Construction stages doneacross 9 buildings; furthest along: Sanitary Fittings within the flats /..., 89%
26Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

EKTA PARKSVILLE PHASE I is a Residential / Group Housing project by EKTA PARKSVILLE HOMES PVT. LTD. in Palghar, Maharashtra, registered with MahaRERA as P99000000116 on 4 Jul 2017. The registration is recorded completed; possession was promised by 27 Jul 2023. The completion date has moved by 43 months from the original filing. 26 complaints are on record with the regulator.

At a glance

Project

  • NameEKTA PARKSVILLE PHASE I
  • TypeResidential / Group Housing
  • Location
    • Near Yazoo Park
    • Virar
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000000116
  • ReraGenie IDRG-MH-08193

Builder

  • NameEKTA PARKSVILLE HOMES PVT. LTD.
  • Entity typeCompany
  • CINU70102MH1988PTC050060
  • GSTIN27AAACW4316N1Z2
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsDILIP LAXMAN BORHADE, PRAKASH TRIBHUVANDAS TANNA, DILIP LAXMAN BORHADE, PRAKASH TRIBHUVANDAS TANNA
  • Other registrations6 more →
  • Completed5 of 7

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toJul 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jul 2017
  • Promised completion27 Jul 2023
  • Revised completionRevised to 27 Jul 2023 (originally 31 Dec 2019)
  • Buildings9 building records
  • Documents filed119 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CENTRAL PARK A WINGNA170000
CENTRAL PARK B WINGNA170000
CENTRAL PARK C WINGNA170000
CENTRAL PARK D WINGNA170000
CENTRAL PARK E WINGNA170000
CENTRAL PARK F WINGNA170000
CENTRAL PARK G WINGNA170000
CENTRAL PARK H WINGNA170000
CENTRAL PARK K WINGNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

91 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 89%.

CENTRAL PARK A WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises83%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK B WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises83%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK C WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises89%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK D WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises89%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK E WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises84%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK F WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK G WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises84%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK H WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises82%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CENTRAL PARK K WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Shrub BedsYes100%
Jogging TrackYes100%
Children Play AreaYes100%
GazeboYes100%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8
BuildingClosed/CoveredTotal
CENTRAL PARK A WING11
CENTRAL PARK B WING11
CENTRAL PARK C WING11
CENTRAL PARK D WING11
CENTRAL PARK F WING11
CENTRAL PARK G WING11
CENTRAL PARK H WING11
CENTRAL PARK K WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,843 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI26078.7
Proposed, not sanctioned26,079 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR UNIT NO 001A HALLMARK BUSINESS PLAZA NEAR COLLECTORS OFFICE BANDRA EAST MUMBAI 400051

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE & ASSOCIATES
PartnerRole in project
EKTA PARKSVILLE HOMES PVT. LTD.-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000001904Dec 2019 → Dec 2020

Reason as filed by the promoterDue to Scarcity of availability of the resources and also some technical reasons.

EXT99000011390Dec 2019 → Mar 2023

Reason as filed by the promoterDue to following force majeure conditions project got delayed:- 1. Non availability of Building Material 2. Stop Work notices issued time to time by VVCMC 3. Delay in getting permissions from the Environments and Pollution Department 4. Lockdown Due to Novel Corona Virus Pandemic. 5. Non Availability of Labor due to Covid

EXT99000016860Dec 2019 → Jul 2023

Reason as filed by the promoterReason as per attached herewith.

Litigation declared4

CaseCourtStatus
887/2016BOMBAY CITY CIVIL COURTwithdrawal
889/2016BOMBAY CITY CIVIL COURTwithdrawal
890/2016BOMBAY CITY CIVIL COURTwithdrawal
398/2014STATE COMMISSION MAHARASHTRAPENDING

Complaints filed with MahaRERA26

Case no.ComplainantRespondentFiled
CC006000000000791DHARMESH BHAU / REENA BHAUEKTA PARKESVILLE HOMES PVT LTD21/09/2017
CC006000000001418Tejas PatelEkta World-Ashok Mohanani30/10/2017
CC006000000195910NEERA ABHAY SINGHEkta parksville homes pvt ltd07/02/2021
CC006000000023361NIDHI MEHTAVIVEK ASHOK MOHNANI15/02/2018
CC006000000054840DAVID ALBERT D'SILVAEKTA PARKSVILLE HOMES PRIVATE LIMITED13/06/2018
CC006000000055796Francis Baptist D'cunha and Baptista Francis D'cunhaM/S Ekta Parksville Homes Pv.t Ltd.16/08/2018
CC006000000057504Mrs. Mayuri Asar and Mrs. Bharati AsarEkta Parksville Homes Private Limited07/04/2019
CC006000000056634SONOO SAINANEY AND RAJ SAINANEYEKTA PARKSVILLE HOMES PVT LTD19/10/2018
CC006000000056960ANTHONY MENEZESEKTA PARKSVILLE HOMES PVT. LTD.18/11/2018
CC006000000078739MRS LAXMI LALWANIEkta Parksville Homes Private Limited, Mr Savio D'Mello01/04/2019
CC006000000089587RONAK ANIL GAGLANIEKTA PARKSVILLE HOMES PVT LTD06/06/2019
CC006000000100250Shakeel Ahmed KhanEkta Parksville Homes Pvt. Ltd.24/07/2019
CC006000000171485PRAKASH BHANSALIEkta Parks Ville Homes Pvt Ltd10/11/2019
CC006000000196518Shiv Singh NegiEkta Parksville Homes Private Limited26/03/2021
CC006000000196581VARGHESE GEORGEEKTA PARKSVILLE HOMES PVT. LTD13/04/2021
CC006000000220789AJITKUMAR S GUPTAM/s Ekta Parks ville Homes Private Limited12/04/2022
CC006000000251733Vallabh Ram BhatiaEkta World06/07/2022
CC006000000333946KUNAL PRATAP SHAHM/S EKTA PARKSVILLE HOMES PVT. LTD.13/01/2023
CC006000000375060VIJAYAPRIYA RAJAGOPALANEkta Parksville Homes Private Limited31/03/2023
CC006000000396527Meghana Mandar TalimEkta Parksville Homes Private Limited03/07/2023
CC006000000591322RAMILA SANJAY JAINM/S EKTA PARKSVILLE HOMES PVT LTD.25/07/2024
CC006000000591324JASHODA HASTIMAL JAINM/s Ekta Parksville Homes Pvt Ltd25/07/2024
CC006000000591326ARUNA DILIPKUMAR JAINM/s Ekta Parksville Homes Pvt Ltd.25/07/2024
CC12502285Piyush Kantilal ChauhanEKTA PARKSVILLE HOMES PVT. LTD.07/07/2025
CC12504182Mrs Reeta KapurEKTA PARKSVILLE HOMES PVT. LTD.26/11/2025
CC12600489KHODIDAS ARJUN CHARANIAEKTA PARKSVILLE HOMES PVT LTD27/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jul 2023

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW PARKSVILLE PHASE I WING A TO H K FORM 1 27-7-2023 .pdf30 Jun 2025
Certificates of CA (Form 3)File: signed form 3 PV P I 27_07_2023.pdf30 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed EP PHASE I form 2 27_07_23.pdf30 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PARKSVILLE PHASE I FORM 2A 23-24.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PARKSVILLE PHASE I.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Parksville Phase I 30092023.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: EKTA P P I.pdf3 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: virar OC 28072023.pdf30 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: virar OC 28072023.pdf30 Jul 2023
Disclosure of sold/ booked inventoryFile: EKTA PARKSVILLE-PH-I.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE 22-23.pdf22 Jun 2023
Certificates of CA (Form 3)File: Final form 3 Ekta Parksville Phase I 31 MAY 23.pdf22 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SIGNED EW PARKSVILLE PHASE I FORM1 31 MAR 23.pdf21 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 EPPI 31 MAY 23.pdf21 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: EKTA PARKSVILLE CENTRAL A TO H PHASE I.pdf12 Jun 2023
Disclosure of sold/ booked inventoryFile: EP P I.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Parksville I.pdf15 Mar 2023
Details of encumbrances concerned to FinanceFile: Ekta Parskville Phase I.pdf27 Feb 2023
Details of encumbrances concerned to LegalFile: Ekta Parskville Phase I.pdf27 Feb 2023
Declaration about Commencement CertificateFile: EKTA PARKSVILLE PHASE I CC DECLARATION 20-02-2023.pdf27 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW PARKSVILLE PHASE I WING K ARCH CERT FORM 1 20-2-2023.pdf27 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW PARKSVILLE PHASE I WING K ARCH CERT FORM 1 20-2-2023.pdf27 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EW PARKSVILLE PHASE I FORM 2A Quality Assurance Certificate 31-12-2020.pdf27 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EW PARKSVILLE PHASE I FORM 2A Quality Assurance Certificate 31-12-2022.pdf27 Feb 2023
CERSAI detailsFile: Parksville.pdf20 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Virar C P GOYAL.pdf20 Feb 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE - Central Park - Parksville Phase I.pdf15 Feb 2023
Disclosure of sold/ booked inventoryFile: EP PHASE I.pdf15 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: parksville phase I.pdf29 Oct 2022
Disclosure of sold/ booked inventoryFile: PARKSVILLE I.pdf9 Oct 2022
Disclosure of sold/ booked inventoryFile: Ekta Parksville I.pdf14 Jul 2022
Disclosure of sold/ booked inventoryFile: parksville I.pdf5 Apr 2022
Declaration about Commencement CertificateFile: Declaration about commencement.pdf4 Feb 2022
Disclosure of sold/ booked inventoryFile: brooklyn park I.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: PARKSVILLE PHASE I.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PARKSVILLE PHASE I.pdf31 Dec 2021
Disclosure of sold/ booked inventoryFile: parksville phase I.pdf19 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA 20-21 PARKSVILLE PHASE 1.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: 20210831160938-1-7.pdf30 Aug 2021
Disclosure of sold/ booked inventoryFile: 20210831160938-8-14.pdf30 Aug 2021
Certificates of CA (Form 5)File: Ekta Parksville Phase I.pdf9 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Ekta Parksville Phase I.pdf9 Feb 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Parksville.pdf6 Feb 2021
Details of encumbrancesFile: Index-2 Jm 20 Crs.pdf3 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Virar phase I.pdf16 Nov 2019
Certificates of CA (Form 5)File: Virar phase I.pdf11 Oct 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: PHASE ICentral Park AtoH Society formation application.pdf16 Sep 2019
OtherFile: Virar OC.pdf17 May 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Central Park.pdf7 Jan 2019
Certificates of CA (Form 5)File: Parksville Phase I 04102018110643.pdf9 Oct 2018
OtherFile: MOEF-Pollution Dept Permission-1-5.pdf16 Aug 2018
OtherFile: MOEF-Pollution Dept Permission-6-10.pdf16 Aug 2018
OtherFile: Virar tree NOC 18-07-18.pdf7 Aug 2018
OtherFile: OC APPLICATION 24112017.pdf7 Aug 2018
OtherFile: Virar OC submission 2018.pdf7 Aug 2018
OtherFile: Final Fire NOC B13-14-15.pdf7 Aug 2018
OtherFile: Final Fire NOC B8-9-13AB.pdf7 Aug 2018
Details of encumbrancesFile: Parksville.pdf7 Apr 2018
Details of encumbrancesFile: JMF-Indenture of Mortgage-2423-2018-303-303.pdf7 Apr 2018
Details of encumbrancesFile: Index II TATA Capital.pdf30 Nov 2017
Proforma of Allotment letterFile: Allottment Letter and AFS- Central Park final - 28-06-2017.pdf28 Jun 2017
Layout approvalFile: covering letter for virar layout 1.pdf27 Jun 2017
Building plan approvalFile: Bldg-13 Wing-A Phase-I (1).pdf27 Jun 2017
Building plan approvalFile: Bldg-13 Wing-A Phase-I (2).pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-B PLAN.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-B SECTION.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-C PLAN.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-C PLAN 1.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-C SECTION.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-D PLAN.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-D SECTION.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-E PLAN.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-E SECTION.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-F PLAN.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-F PLAN 1.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-F SECTION.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-G PLAN.pdf27 Jun 2017
Building plan approvalFile: PHASE I WING-G SECTION.pdf27 Jun 2017
Building plan approvalFile: Bldg-15 Wing-H Phase-I(1).pdf27 Jun 2017
Building plan approvalFile: Bldg-15 Wing-H Phase-I_2_001.pdf27 Jun 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 43 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKTA PARKSVILLE PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar3,200+ in Palghar

2 kmEKTA PARKSVILLE PHASE ICompleted 62Lapsed / revoked 38Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: EKTA PARKSVILLE HOMES PVT. LTD.

EKTA PARKSVILLE HOMES PVT. LTD. has 7 registrations on MahaRERA, including EKTA PARKSVILLE PHASE I and EKTA PARKSVILLE PHASE II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if EKTA PARKSVILLE PHASE I is delayed beyond 27 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKTA PARKSVILLE PHASE I?

The registered promoter entity is EKTA PARKSVILLE HOMES PVT. LTD., a company as per the filing. Its CIN U70102MH1988PTC050060 and GSTIN 27AAACW4316N1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKTA PARKSVILLE PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against EKTA PARKSVILLE PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for EKTA PARKSVILLE PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKTA PARKSVILLE PHASE I?

The professionals named in the filing: Architect: AJAY WADE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKTA PARKSVILLE PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKTA PARKSVILLE PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKTA PARKSVILLE PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.