Home / Browse projects / Sindhudurg, Maharashtra / Ekdantpark

Registered No litigation declared Others project

Ekdantpark

By SHREE MAHALAKSHMI BUILDCON LLP

RG-MH-04495 · RERA P52900026752 · Last updated on MahaRERA portal: 21 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
1 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 60%
22 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Ekdantpark is a Others project by SHREE MAHALAKSHMI BUILDCON LLP in Sindhudurg, Maharashtra, registered with MahaRERA as P52900026752 on 22 Oct 2020. Possession is promised by 30 Jun 2029. 6 of the 28 units on this registration are recorded sold or booked, and 1 of 33 construction stages are filed complete.

At a glance

Project

  • NameEkdantpark
  • TypeOthers
  • Location
    • laxmiwadi street
    • laxmiwadi
    • Kudal (CT)
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900026752
  • ReraGenie IDRG-MH-04495

Builder

  • NameSHREE MAHALAKSHMI BUILDCON LLP
  • Entity typePartnership
  • PartnerBhavesh Satish Dalvi
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2020PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Oct 2020
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed59 files

Current status

21%6 of 28 units booked

Figures as on 21 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING-ANA60101
BUILDING-BNA61141226
BUILDING-CNA50101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 60%.

BUILDING-A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING-B26%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth60%
Stilt Floor50%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING-C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75
BuildingClosed/CoveredTotal
BUILDING-A2525
BUILDING-B2525
BUILDING-C2525

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,040 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 May 2025
LandownerVillageDistrict
APPA GANGARAM KALAPKudal (CT)Sindhudurg
DATTARAM GANGARAM KALAPKudal (CT)Sindhudurg
VANITA VINAYAK KALAPKudal (CT)Sindhudurg
VAIBHAVI VINAYAK KALAPKudal (CT)Sindhudurg
VARSHA VINAYAK KALAPKudal (CT)Sindhudurg
SAMPADA VINAAYK KALAPKudal (CT)Sindhudurg
GANGARAM VINAYAK KALAPKudal (CT)Sindhudurg
SHARAD SAKHARAM KALAPKudal (CT)Sindhudurg

Approvals and building plan

Sanctioning authorityMaharashtra Real Estate Regulatory Authority (MahaRERA)
Permissible FSI3874.27
Proposed, not sanctioned3,874 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAkanksha bunglow,sane guruji nagar,mulund east

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVINAYAK GOVIND DHURI
EngineerSumit Suryakant patil
EngineerSWAPNIL SUHAS SAWANT
Chartered AccountantSIDDHANT R SHETTY
Chartered AccountantKEYUR HINDOCHA
Chartered AccountantAnita Choudhari and Company
PartnerRole in project
SHREE MAHALAKSHMI BUILDCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (1).pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (2).pdf21 May 2025
Form 5 (FY 2023-2024)File: Form 5 (2).pdf21 May 2025
Form 1File: FORM 1Q-1FY 24-25.pdf15 May 2025
Form 1File: FORM 1Q-2FY 24-25.pdf15 May 2025
Form 2File: FORM 2Q-2FY 24-25.pdf15 May 2025
Form 3File: FORM 3 Q-2 FY 24-25.pdf15 May 2025
Form 1File: FORM 3 Q-2 FY 24-25.pdf15 May 2025
Form 2File: FORM 2Q-2FY 24-25.pdf15 May 2025
Form 3File: FORM 1Q-2FY 24-25.pdf15 May 2025
Form 1File: FORM 1Q-2FY 24-25.pdf15 May 2025
Form 2File: FORM 2Q-2FY 24-25.pdf15 May 2025
Form 3File: FORM 3 Q-2 FY 24-25.pdf15 May 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf15 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1Q-4 FY 24-25.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q-4 FY 24-25.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DETAILS.pdf13 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2Q-4 FY 24-25.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1Q-1FY 24-25.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1Q-2FY 24-25.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1Q-3FY 24-25.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1Q-4 FY 24-25.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 158.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3Q-1 FY 24-25 V1.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q-2 FY 24-25.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q-3 FY 24-25.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q-4 FY 24-25.pdf9 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2Q-2.pdf9 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2Q-2.pdf9 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2Q-1 FY 24-25.pdf9 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2Q-2FY 24-25.pdf9 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2Q-3FY 24-25.pdf9 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2Q-4 FY 24-25.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 01-04-2023 TO 31-03-2024.pdf9 Apr 2025
Other - LegalFile: letter_1.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 01-04-2019 to 31-03-2020FORM 2.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 01-04-2020 to 31-03-2021 FORM 2.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 01-04-2021 to 31-03-2022 FORM 2.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 01-04-2022 to 31-03-2023 FORM 2.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 01-04-2023 to 31-03-2024 FORM 2.pdf9 Apr 2025
Layout approvalFile: 1.pdf14 Sep 2020
Layout approvalFile: 2.pdf14 Sep 2020
Layout approvalFile: 3.pdf14 Sep 2020
Layout approvalFile: 4.pdf14 Sep 2020
Building plan approvalFile: NA Order.pdf14 Sep 2020
Copy of the legal title reportFile: 001.pdf14 Sep 2020
Copy of the legal title reportFile: 002.pdf14 Sep 2020
Copy of the legal title reportFile: TITLE CLEARENCE REPORT.pdf14 Sep 2020
Details of encumbrancesFile: TITLE CLEARANCE CERTIFICATE.pdf14 Sep 2020
Copy of Layout Approval (in case of layout)File: 1.pdf14 Sep 2020
Copy of Layout Approval (in case of layout)File: 2.pdf14 Sep 2020
Copy of Layout Approval (in case of layout)File: 3.pdf14 Sep 2020
Copy of Layout Approval (in case of layout)File: 4.pdf14 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf14 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf14 Sep 2020
Declaration in FORM BFile: form-b.pdf14 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ekdant Park RERA Form-2.pdf14 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ekdant Park RERA Form-3 Final.pdf14 Sep 2020
Proforma of Allotment letterFile: Aggrement to sale.pdf14 Sep 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
shree mahalaxmi villasAt & post KattaCompletedApr 2019Apr 2019

How this compares with Sindhudurg

21%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Ekdantpark on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near laxmiwadi530+ in Sindhudurg

2 kmEkdantparkCompleted 6Lapsed / revoked 5Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: SHREE MAHALAKSHMI BUILDCON LLP

SHREE MAHALAKSHMI BUILDCON LLP has 1 registration on MahaRERA, including Ekdantpark. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Ekdantpark is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ekdantpark?

The registered promoter entity is SHREE MAHALAKSHMI BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ekdantpark?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ekdantpark?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ekdantpark?

The professionals named in the filing: Architect: VINAYAK GOVIND DHURI; Engineer: Sumit Suryakant patil; Engineer: SWAPNIL SUHAS SAWANT; Chartered Accountant: SIDDHANT R SHETTY; Chartered Accountant: KEYUR HINDOCHA; Chartered Accountant: Anita Choudhari and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ekdantpark?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ekdantpark. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ekdantpark to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.