ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / EKDANT RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

EKDANT RESIDENCY

By KIRAN MADHAV NANGARE

RG-MH-06344 · RERA P52000052477 · Last updated on MahaRERA portal: 5 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 83%
29 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

EKDANT RESIDENCY is a Residential / Group Housing project by KIRAN MADHAV NANGARE in Raigarh, Maharashtra, registered with MahaRERA as P52000052477 on 8 Sep 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 3 months from the original filing. 24 of the 53 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameEKDANT RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • NA
    • Vichumbe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052477
  • ReraGenie IDRG-MH-06344

Builder

  • NameKIRAN MADHAV NANGARE
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

7 months past promisethis monthRegisteredSep 2023First promiseDec 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Sep 2023
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed70 files

Current status

45%24 of 53 units booked

Figures as on 5 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EKDANT RESIDENCY WING ANA6529029
EKDANT RESIDENCY WING BNA6524024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 83%.

EKDANT RESIDENCY WING A43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EKDANT RESIDENCY WING B43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54
BuildingClosed/CoveredTotal
EKDANT RESIDENCY WING A2727
EKDANT RESIDENCY WING B2727

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,750 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jan 2026
LandownerVillageDistrict
NARESH NAMDEV BHOIRVichumbeRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI2480.53
Proposed, not sanctioned2,374 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOLD PANVEL

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Meenakshi Shrivastav
EngineerYATEESH TARE
Chartered AccountantSOLASE & ASSOCIATES
Chartered AccountantASHMITA
PartnerRole in project
KIRAN MADHAV NANGARE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02012619253Dec 2025 → Mar 2026

Reason as filed by the promoterThe real estate project, situated in a remote area, has faced significant challenges due to limited customer bookings, resulting in a lower-than-anticipated response from prospective buyers. This lack of adequate buyer interest adversely impacted the financial inflow required for the timely completion of the project, as the anticipated funding from customer bookings could not be realized. Despite these challenges, the promoters have demonstrated unwavering commitment to the project's completion by arranging the necessary funds through the liquidation of personal assets. This decisive action re

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: kiran nangare.pdf5 Jan 2026
Form 5 (FY 2024-2025)File: kiran nangare 1.pdf5 Jan 2026
Form 1File: FORM 1_ JUNE 25_ EKDANT RESIDENCY.pdf2 Jan 2026
Form 2File: FORM 2_SEP 25_EKDANT RESIDENCY.pdf2 Jan 2026
Form 3File: FORM 3_JUNE 25_EKDANT RESIDENCY.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ EKDANT RESIDENCY.pdf2 Jan 2026
Form 1File: FORM 1_ SEP 25_ EKDANT RESIDENCY.pdf2 Jan 2026
Form 2File: FORM 2_SEP 25_EKDANT RESIDENCY.pdf2 Jan 2026
Form 3File: FORM 3_SEP 25_EKDANT RESIDENCY.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ EKDANT RESIDENCY.pdf2 Jan 2026
Form 1File: FORM 1_ MARCH 25_ EKDANT RESIDENCY.pdf18 Aug 2025
Form 2File: FORM 2_ MARCH 25_ EKDANT RESIDENCY.pdf18 Aug 2025
Form 3File: FORM 3_ MARCH 25_ EKDANT RESIDENCY.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ EKDANT RESIDENCY.pdf18 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 24_ KIRAN NANGARE_ EKDANT RESIDENCY.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_DEC 24_ KIRAN NANGARE_ EKDANT RESIDENCY.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ DEC 24_ KIRAN NANGARE_ EKDANT RESIDENCY.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 24_ KIRAN NANGARE_ EKDANT RESIDENCY.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ SEP 24.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ SEP 24.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24.pdf31 Jan 2025
Building plan approvalFile: PLANS PDF_compressed.pdf7 Oct 2024
Building plan approvalFile: PLANS PDF_compressed.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC PDF.pdf7 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PLANS PDF_compressed.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC PDF.pdf7 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PLANS PDF_compressed.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ JUNE 24.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM _ JUNE 24.pdf9 Aug 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ JUNE 24.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1_ Sep 23.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1_ Dec 23.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1_ March 24.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2_ Sep 23.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2_ Dec 23.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2_ March 24.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 13 Form 2A_ March 24.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: 10 Sold Unsold_ Sep 23.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: 11 Sold Unsold_ Dec 23.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: 12 Sold Unsold_ March 24.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3_ Sep 23_compressed.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 form 3_ Dec 23_compressed.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3_ March 24_compressed.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf27 Jul 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf27 Jul 2023
Layout approvalFile: 5 Copy of Layout Approval (in case of layout)_compressed.pdf17 Jul 2023
Building plan approvalFile: 6 Building Plan Approval NA Order for plotted development 1.pdf17 Jul 2023
Building plan approvalFile: 6 Building Plan Approval NA Order for plotted development 2.pdf17 Jul 2023
Building plan approvalFile: 6 Building Plan Approval NA Order for plotted development 3.pdf17 Jul 2023
PAN CardFile: 1 PAN CARD_compressed.pdf17 Jul 2023
Copy of the legal title reportFile: 2 Title Certificate.pdf17 Jul 2023
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf17 Jul 2023
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf17 Jul 2023
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf17 Jul 2023
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf17 Jul 2023
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout)_compressed.pdf17 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval NA Order for plotted development 1.pdf17 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval NA Order for plotted development 2.pdf17 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval NA Order for plotted development 3.pdf17 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC (1).pdf17 Jul 2023
Declaration about Commencement CertificateFile: 8 Declaration about Commencement Certificate.pdf17 Jul 2023
Declaration in FORM BFile: 9 Declaration in FORM B_compressed.pdf17 Jul 2023
CERSAI detailsFile: CERSAI.pdf17 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organizations.pdf17 Jul 2023
Proforma of Allotment letterFile: 16 Proforma of Allotment letter.pdf17 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17 Separate Bank Account details including no encumbrances on the Bank Account or no escro17 Jul 2023
Deviation Report with respect to Allotment letterFile: 18 Deviation Report with respect to Allotment letter.pdf17 Jul 2023
Deviation Report with respect to model copy of AgreementFile: 19 Deviation Report with respect to model copy of Agreement_compressed.pdf17 Jul 2023

How this compares with Raigarh

45%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 3 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKDANT RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NA5,900+ in Raigarh

2 kmEKDANT RESIDENCYCompleted 78Lapsed / revoked 27Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 174 registered projects within 2 km.

Builder: KIRAN MADHAV NANGARE

KIRAN MADHAV NANGARE has 2 registrations on MahaRERA, including EKDANT RESIDENCY and SHREE SAMARTH VASTU. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that EKDANT RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EKDANT RESIDENCY is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKDANT RESIDENCY?

The registered promoter entity is KIRAN MADHAV NANGARE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKDANT RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKDANT RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKDANT RESIDENCY?

The professionals named in the filing: Architect: Ar. Meenakshi Shrivastav; Engineer: YATEESH TARE; Chartered Accountant: SOLASE & ASSOCIATES; Chartered Accountant: ASHMITA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKDANT RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKDANT RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKDANT RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.