Home / Browse projects / Pune, Maharashtra / Eastern River Residency Wing F
Eastern River Residency Wing F
RG-MH-16466 · RERA P52100026039 · Last updated on MahaRERA portal: 17 Feb 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
- Completion date moved by 12 months
- 1 extension taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Eastern River Residency Wing F is a Residential / Group Housing project by Kishor Shankar Garve in Pune, Maharashtra, registered with MahaRERA as P52100026039 on 11 Aug 2020. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 12 months from the original filing. 83 of the 84 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameEastern River Residency Wing F
- TypeResidential / Group Housing
- Location
- Bhosari Wakad BRT Road
- Kashid Park
- Pimpale Gurav
- Haveli
- Pune
- 411061
- Pincode411061
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100026039
- ReraGenie IDRG-MH-16466
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Aug 2020
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed97 files
Current status
Figures as on 17 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing F | NA | 14 | 14 | 84 | 0 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Wing F: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership13
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Popat Laxman Kashid | Pimpale Gurav | Pune |
| Rupesh Uttam Kashid | Pimpale Gurav | Pune |
| Ganesh Popat Kashid | Pimpale Gurav | Pune |
| Uttam Laxman Kashid | Pimpale Gurav | Pune |
| Balu Laxman Kashid | Pimpale Gurav | Pune |
| Dinesh Uttam Kashid | Pimpale Gurav | Pune |
| Sudam Laxman Kashid | Pimpale Gurav | Pune |
| Nitin Balasaheb Kashid | Pimpale Gurav | Pune |
| Akshay Sudam Kashid | Pimpale Gurav | Pune |
| Deepak Balasaheb Kashid | Pimpale Gurav | Pune |
| Vineet Bhaskar Kuber | Pune (M Corp.) | Pune |
| Ajit Bhaskar Kuber | Satara | Satara |
| Manohar Popat Kashid | Pimpale Gurav | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing F | NA | Rs 38.50 cr | Rs 38.50 cr |
| - | NA | Rs 1.00 cr | Rs 99.39 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Milind Patil |
| Engineer | Prathamesh Sugate |
| Engineer | VKG Associates |
| Chartered Accountant | Chaudhari Agarwal and Associates |
| Partner | Role in project |
|---|---|
| M/s Vinayak Enterprises | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Madam, 1. This is to inform, that the project of M/s Vinayak Enterprises namely “Eastern River Residency Wing F” having registration number P52100026039 is an on-going project & its estimated completion date was 30/06/2025 at the time of registration. That the said project has been fully completed as on 10/04/2023 with all its aspects and accordingly the Promoter has obtained various certificates, No Objection Certificates etc. from various competent authorities annexed herewith. 2. Thus on the basis of the all the above documents the Promoter had applied for obtaining completion
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 616/2020 | Civil Judge Senior Division Pune | Case Sub Judice |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Nov 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 ERR WING F.pdf | 17 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 ERR WING F.pdf | 17 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 ERR WING F.pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 ERR WING F JUNE.pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 ERR WING F SEP.pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 ERR WING F DEC.pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 ERR WING F Jun.pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 ERR WING F Sept.pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 ERR WING F Dec.pdf | 17 Feb 2026 |
| Occupational CertificateFile: ERR Wing F Completion Certificate.pdf | 17 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A ERR Wing F.pdf | 10 Jul 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Wing F.pdf | 10 Jul 2025 |
| Form 1File: Form 1 Wing F Mar 25.pdf | 27 Jun 2025 |
| Form 2File: Form 2 Wing F Mar 25.pdf | 27 Jun 2025 |
| Form 3File: Form 3 ERR Wing F Mar 25.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory ERR Wing F Mar 25.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24 Wing F.pdf | 1 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24 Wing F.pdf | 1 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24 Wing F.pdf | 1 Apr 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: ERR WING F Society Reg Certificate.pdf | 1 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ERR Wing F 23-24.pdf | 1 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ERR Wing F Jun 24.PDF | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ERR Wing F Sept 24.PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ERR Wing F Jun 24.PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ERR Wing F Sept 24.PDF | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ERR Wing F Jun 2024.PDF | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ERR Wing F Sept 2024.PDF | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate Mar 2023.PDF | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate Jun 2023.PDF | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate Sept 2023.PDF | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate Dec 2023.PDF | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate Mar 2024.PDF | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Mar 2023.PDF | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Jun 2023.PDF | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 Architect Cetificate Sept 2023.PDF | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 2023.PDF | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Sept 2023.PDF | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Mar 2024.PDF | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance 22-23.PDF | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance 23-24.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory ERR Wing F Mar 23.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Form 1 Architect Cetificate Jun 2023.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory ERR Wing F Jun 23.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory ERR Wing F Sept 23.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory ERR Wing F Dec 23.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory ERR Wing F Mar 24.PDF | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 23 Wing F.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold Inventory ERR Wing F Sept 23.PDF | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold Inventory ERR Wing F Dec 23.PDF | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 23 Wing F.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23 Wing F.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24 Wing F.pdf | 13 Aug 2024 |
| Proforma of Agreement for saleFile: Proforma of Agreement.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: F wing CA certificate.pdf | 13 Mar 2024 |
| Declaration about Commencement CertificateFile: Declaration Commencement Certificate 2022.PDF | 16 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate 2022.PDF | 16 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate 2022 Dec.PDF | 16 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 2021.PDF | 16 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 2022.PDF | 16 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Assurance 21-22.PDF | 16 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ERR Wing F Form 3 New.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ERR F Wing Form 5.pdf | 13 Feb 2023 |
| Layout approvalFile: Layout New ERR.pdf | 11 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: Layout New ERR.pdf | 11 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 11 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ERR 2021.pdf | 20 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 ERR 2020 to 2021.pdf | 20 Nov 2021 |
| Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf | 10 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf | 10 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality assurance certificate 2020 21.pdf | 10 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Unit Details.pdf | 10 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Receipt.pdf | 26 Dec 2020 |
| Proforma of Allotment letterFile: Agreement Draft Format Eastern River Residency.pdf | 1 Dec 2020 |
| Building plan approvalFile: F Building 1 Floor Plan.pdf | 12 Nov 2020 |
| Building plan approvalFile: F Building 8 Floor Plan.pdf | 12 Nov 2020 |
| Building plan approvalFile: F Building Elevation Plan.pdf | 12 Nov 2020 |
| Building plan approvalFile: F Building Floor Plans.pdf | 12 Nov 2020 |
| Layout approvalFile: Layout Plan.pdf | 12 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 12 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: F Building 1 Floor Plan.pdf | 12 Nov 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Treasure | Kashid Park Pimple Gurav Pune. | 265 | Completed | Mar 2012 | Mar 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
Keep Eastern River Residency Wing F on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kashid Park13,700+ in Pune
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
Samrajya Wing GH
Garve Patil Construction Company
Eastern River Residency Wing C
Kishor Shankar Garve
KRISHNA PRABHA AANGAN
RATHOD AND SONS
Eastern River Residency Wing D
Kishor Shankar Garve
Eastern River Residency Wing B
Kishor Shankar Garve
Samrajya C Wing
Garve Patil Construction Company
Builder: Kishor Shankar Garve
Kishor Shankar Garve has 6 registrations on MahaRERA, including Eastern River Residency Wing F and Eastern River Residency Wing D. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Eastern River Residency Wing F is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Eastern River Residency Wing F?
The registered promoter entity is Kishor Shankar Garve, an individual as per the filing. Its GSTIN 27AAVPG2791H1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Eastern River Residency Wing F?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Eastern River Residency Wing F?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Eastern River Residency Wing F?
The professionals named in the filing: Architect: Milind Patil; Engineer: Prathamesh Sugate; Engineer: VKG Associates; Chartered Accountant: Chaudhari Agarwal and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Eastern River Residency Wing F?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback