Eastern River Residency MHADA Buildings
RG-MH-72737 · RERA P52100053566 · Last updated on MahaRERA portal: 1 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Eastern River Residency MHADA Buildings is a Residential / Group Housing project by Kishor Shankar Garve in Pune, Maharashtra, registered with MahaRERA as P52100053566 on 10 Nov 2023. Possession is promised by 31 Dec 2028.
At a glance
Project
- NameEastern River Residency MHADA Buildings
- TypeResidential / Group Housing
- Location
- Wakad Bhosari BRTS Road
- Kashid Park
- Pimpale Gurav
- Haveli
- Pune
- 411061
- Pincode411061
- RERA no.P52100053566
- ReraGenie IDRG-MH-72737
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Nov 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed41 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing G | NA | 9 | 7 | 0 | 0 | 0 |
| Wing E | NA | 12 | 12 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
Wing G0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed75
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing G | 14 | 14 | 28 |
| Wing E | 23 | 24 | 47 |
Land and ownership30
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Uttam Laxman Kashid | Pimpale Gurav | Pune |
| Balu Laxman Kashid | Pimpale Gurav | Pune |
| Dinesh Uttam Kashid | Pimpale Gurav | Pune |
| Sudam Laxman Kashid | Pimpale Gurav | Pune |
| Nitin Balasaheb Kashid | Pimpale Gurav | Pune |
| Akshay Sudam Kashid | Pimpale Gurav | Pune |
| Deepak Balasaheb Kashid | Pimpale Gurav | Pune |
| Ganesh Popat Kashid | Pimpale Gurav | Pune |
| Manohar Popat Kashid | Pimpale Gurav | Pune |
| Rupesh Uttam Kashid | Pimpale Gurav | Pune |
| Popat Laxman Kashid | Pimpale Gurav | Pune |
| Ajit Bhaskar Kuber | Satara | Satara |
| Vineet Bhaskar Kuber | Pune (M Corp.) | Pune |
| Aakash Sudam Kashid | Pimpale Gurav | Pune |
| Vitthal Haribhau Kashid | Pimpale Gurav | Pune |
| Mangal Sunil Bhate | Pimpale Gurav | Pune |
| Smita Mahadev Lale | Bhosari | Pune |
| Asha Ramesh Bhate | Pimpale Gurav | Pune |
| Sakharam Haribhau Kashid | Pimpale Gurav | Pune |
| Suhas Sakharam Kashid | Pimpale Gurav | Pune |
| Rekha Somnath Dhabade | DEHU | Pune |
| Swati Rahul Ranawade | Alandi (M Cl) | Pune |
| Balasaheb Sukhdev Kashid | Pimpale Saudagar | Pune |
| Manisha Balu Kashid | Pimpale Saudagar | Pune |
| Kajal Balu Kashid | Pimpale Saudagar | Pune |
| Sulochana Sakharam Kashid | Pimpale Saudagar | Pune |
| Anjana Suhas Kashid | Pimpale Gurav | Pune |
| Bharati Ravindra Ghate | Pimpale Gurav | Pune |
| M/s Samrath Business World | Pimpale Saudagar | Pune |
| Manisha Anil Dhawade | Bhosari | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VKG Associates |
| Engineer | VKG Associates |
| Chartered Accountant | Chaudhari Agarwal & Associates |
| Partner | Role in project |
|---|---|
| M/s Vinayak Enterprises | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed41
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24 Wing MHADA.pdf | 1 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24 Wing MHADA.pdf | 1 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ERR MHADA 23-24.pdf | 1 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ERR MHADA Dec 23.PDF | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ERR MHADA Sept 23.PDF | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ERR MHADA Mar 24.PDF | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ERR MHADA Jun 24.PDF | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ERR MHADA Sept 24.PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ERR Wing MHADA Sept 23.PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ERR Wing MHADA Dec 23.PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ERR Wing MHADA Mar 24.PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ERR Wing MHADA Jun 24.PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ERR Wing MHADA Sept 24.PDF | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ERR MHADA Sept 23.PDF | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ERR MHADA Dec 23.PDF | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ERR MHADA Mar 24.PDF | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ERR MHADA Jun 24.PDF | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ERR MHADA Sept 24.PDF | 9 Nov 2024 |
| Copy of the legal title reportFile: Search Report ERR 20-10-2023.PDF | 31 Oct 2023 |
| Declaration in FORM BFile: Form B Vinayak Enterprises 5.PDF | 5 Oct 2023 |
| Proforma of Agreement for saleFile: Agreement to Sale Draft.pdf | 5 Oct 2023 |
| Layout approvalFile: Layout.pdf | 1 Sep 2023 |
| Building plan approvalFile: G Wing Mhada.pdf | 1 Sep 2023 |
| Building plan approvalFile: E Wing Mhada.pdf | 1 Sep 2023 |
| PAN CardFile: Baba Pan Card.pdf | 1 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbraces Finance.PDF | 1 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Legal.PDF | 1 Sep 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbraces Finance.PDF | 1 Sep 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrances Legal.PDF | 1 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 1 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: G Wing Mhada.pdf | 1 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: E Wing Mhada.pdf | 1 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certficate.pdf | 1 Sep 2023 |
| Declaration about Commencement CertificateFile: Declaration Commencement Certificate.PDF | 1 Sep 2023 |
| CERSAI detailsFile: CERSAI Certificate.PDF | 1 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.PDF | 1 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Other RERA Declaration.PDF | 1 Sep 2023 |
| Proforma of Allotment letterFile: Allotment Letter Format RERA.pdf | 1 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Details.PDF | 1 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.PDF | 1 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement to Sale.PDF | 1 Sep 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Treasure | Kashid Park Pimple Gurav Pune. | 265 | Completed | Mar 2012 | Mar 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 41 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Eastern River Residency MHADA Buildings on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kashid Park13,700+ in Pune
Samrajya Wing GH
Garve Patil Construction Company
Eastern River Residency Wing C
Kishor Shankar Garve
KRISHNA PRABHA AANGAN
RATHOD AND SONS
Eastern River Residency Wing D
Kishor Shankar Garve
Eastern River Residency Wing B
Kishor Shankar Garve
Samrajya C Wing
Garve Patil Construction Company
Builder: Kishor Shankar Garve
Kishor Shankar Garve has 6 registrations on MahaRERA, including Eastern River Residency Wing F and Eastern River Residency Wing D. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Eastern River Residency MHADA Buildings is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Eastern River Residency MHADA Buildings?
The registered promoter entity is Kishor Shankar Garve, an individual as per the filing. Its GSTIN 27AAVPG2791H1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Eastern River Residency MHADA Buildings?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Eastern River Residency MHADA Buildings?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Eastern River Residency MHADA Buildings?
The professionals named in the filing: Architect: VKG Associates; Engineer: VKG Associates; Chartered Accountant: Chaudhari Agarwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Eastern River Residency MHADA Buildings?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.