ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / EASTERN HEIGHTS

Registered No litigation declared Residential / Group Housing project

EASTERN HEIGHTS

By ORANGE CITY MALLS PRIVATE LIMITED

RG-MH-73200 · RERA PR1190002501393 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 30Construction stages doneacross 3 buildings; furthest along: Excavation, 20%
301 of 365Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

EASTERN HEIGHTS is a Residential / Group Housing project by ORANGE CITY MALLS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as PR1190002501393 on 6 Nov 2025. Possession is promised by 31 Dec 2030. 64 of the 365 units on this registration are recorded sold or booked, and 0 of 30 construction stages are filed complete.

At a glance

Project

  • NameEASTERN HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Plot No. - 6A
    • CTS NO. - 105
    • Sheet No. - 154
    • Mouza - Nagpur
    • Small Factory Area Layout
    • Old Bhandara Road
    • Danaganj
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • ...
  • Pincode440002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1190002501393
  • ReraGenie IDRG-MH-73200

Builder

  • NameORANGE CITY MALLS PRIVATE LIMITED
  • Entity typeCompany
  • CINU74900MH2011PTC216900
  • DirectorsARUN HANUMANDAS LAKHANI, SIDHAARTHA ARUN LAKHANEE
  • Other registrations4 more →
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Nov 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed24 files

Current status

18%64 of 365 units booked
4.3%Work done, per cost certificate

Figures as on 28 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Commercial BuildingNA10607575
Residential Tower 1NA30251450145
Residential Tower 2NA30251450145

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 30 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 20%.

Commercial Building2%
ActivityProgress
Excavation20%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Residential Tower 12%
ActivityProgress
Excavation20%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Residential Tower 22%
ActivityProgress
Excavation20%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1730

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,730
Closed/Covered1,301
Open Space429
BuildingClosed/CoveredOpen SpaceTotal
Commercial Building8720872
Residential Tower 14290429
Residential Tower 20429429

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,785 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jan 2026
LandownerVillageDistrict
NAGPUR MUNICIPAL CORPORATIONNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION
Permissible FSI67524.18
Proposed, not sanctioned67,524 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEV NAGAR CHOWK
Estimated costRs 238.50 cr
Cost incurredRs 10.19 cr
Work done4.27%
BuildingWingEstimatedIncurred
Residential Tower 1NARs 96.19 crRs 4.11 cr
Residential Tower 2NARs 96.19 crRs 4.11 cr
Commercial BuildingNARs 46.12 crRs 1.97 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVAIBHAV
EngineerVIGHNAHARTA CONSULTING ENGINEERS
Chartered AccountantRANJEET MISHRA & COMPANY
PartnerRole in project
ORANGE CITY MALLS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Sep 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate March 2026 Eastern Heights.pdf28 May 2026
Withdrawal Update Form 2File: Engineer Certificate march 2026 Eastern Heights.pdf28 May 2026
Withdrawal Update Form 3File: C A Certificate March 2026 Eastern Heights.pdf28 May 2026
Withdrawal Update Form 1File: Architect Certificate December 2025 Eastern Heights.pdf25 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate December 2025 Eastern Heights.pdf25 Apr 2026
Withdrawal Update Form 3File: C A Certificate December 2025 Eastern Heights.pdf25 Apr 2026
Declaration and undertaking (Annexure A)File: Annexure A Declaration Cum Undertaking OCM.pdf27 Oct 2025
Layout approvalFile: layout with table.pdf23 Sep 2025
Building plan approvalFile: SHEET NO 01.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 3.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 4.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 5.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 06.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 07.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 08.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 09.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 10.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 11.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 12.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 13.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 14.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 15.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 16.pdf19 Sep 2025
Building plan approvalFile: SHEET NO 17.pdf19 Sep 2025

How this compares with Nagpur

18%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EASTERN HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Small Factory Area Layout, Old Bhandara Road, Danaganj2,800+ in Nagpur

2 kmEASTERN HEIGHTSCompleted 9Lapsed / revoked 12Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: ORANGE CITY MALLS PRIVATE LIMITED

ORANGE CITY MALLS PRIVATE LIMITED has 5 registrations on MahaRERA, including Orange City Wholesale Market-Phase I and Orange City Wholesale Market - Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if EASTERN HEIGHTS is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EASTERN HEIGHTS?

The registered promoter entity is ORANGE CITY MALLS PRIVATE LIMITED, a company as per the filing. Its CIN U74900MH2011PTC216900 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EASTERN HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EASTERN HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EASTERN HEIGHTS?

The professionals named in the filing: Architect: VAIBHAV; Engineer: VIGHNAHARTA CONSULTING ENGINEERS; Chartered Accountant: RANJEET MISHRA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EASTERN HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EASTERN HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EASTERN HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.