ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Easterlia

Completed No litigation declared Others project

Easterlia

By Spacemint Realty LLP

RG-MH-16017 · RERA P52100025118 · Last updated on MahaRERA portal: 30 Dec 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
80 of 88Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Easterlia is a Others project by Spacemint Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100025118 on 18 Mar 2020. The registration is recorded completed; possession was promised by 30 Dec 2026.

At a glance

Project

  • NameEasterlia
  • TypeOthers
  • Location
    • Khese Park
    • Lohegaon
    • LOHGAON
    • Haveli
    • Pune
    • 411047
  • Pincode411047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025118
  • ReraGenie IDRG-MH-16017

Builder

  • NameSpacemint Realty LLP
  • Entity typePartnership
  • PartnerPrayank Vikram Dhaddha
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMar 2020PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Mar 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings8 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA100000
A2NA100000
A3NA100000
A4NA100000
A5NA100000
A6NA100000
A7NA100000
A14 and A15 and MhadaNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 30 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

80 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.

A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A14 and A15 and Mhada91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed192

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots192
Closed/Covered180
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
A124024
A224024
A324024
A424024
A524024
A624024
A724024
A14 and A15 and Mhada121224

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,004 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12000.0
Proposed, not sanctioned12,000 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCongress House Road, Shivanagar, Pune 411005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectImran Shaikh
EngineerSuhas B Alhat
Chartered AccountantKailash Agarwal
PartnerRole in project
Spacemint Realty LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Dec 2023

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate- Wing- A14 A15.pdf30 Dec 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM- 4 Sign Copy.pdf30 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Easterlia 30-06-2023_compressed.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Easterlia 30-09-2023 both sign_compressed.pdf15 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Tribute Eastrlia phase 1 Form 5.pdf4 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Easterlia Ph 1 Form 3 30-03-2023_compressed.pdf6 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf22 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2.pdf22 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM- 2A.pdf22 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLITION CERTIFICATE-A1TO8.pdf22 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FROM-2A.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Easterlia 31122022 Both sign.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 mar 22.pdf22 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: phase 1 form 3.pdf14 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf10 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2.pdf10 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM-1.pdf19 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf19 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf19 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM- 2.pdf19 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM-2A.pdf19 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Spacemint Ph1 Q1 23 signed.pdf19 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPACEMINT FORM 3-Q4 M21.pdf5 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 signed-compressed (1).pdf5 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPACEMINT-FORM 2.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf5 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf5 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM-2-ENGINEER'S CERTIFICATE.pdf5 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf5 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A.pdf5 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form -2A.pdf5 Oct 2021
Copy of the legal title reportFile: TITLE SERCH REPORT small.pdf9 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Comencement Letter small.pdf9 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM-1-APRIL-JUNE-2020 small.pdf9 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-JULY-SEP-2020 small.pdf9 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-OCT-DEC-2020 small.pdf9 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-JAN-MARCH-2021 small.pdf9 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A-APRILTOJUNE-2020 small.pdf9 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A-JULYTOSEP-2020 small.pdf9 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2AOCT-DEC-2020 small.pdf9 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2AJAN-MARCH-2021 small.pdf9 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf5 May 2021
Details of encumbrancesFile: mortgage deed.pdf23 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 small.pdf7 Mar 2020
Layout approvalFile: LOHAGAON DP LAYOUT small.pdf6 Mar 2020
Building plan approvalFile: LOHAGAON DP LAYOUT small.pdf6 Mar 2020
Copy of the legal title reportFile: Search Title small.pdf6 Mar 2020
Details of encumbrancesFile: Encumbraces.pdf6 Mar 2020
Copy of Layout Approval (in case of layout)File: LOHAGAON DP LAYOUT small.pdf6 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: LOHAGAON DP LAYOUT small.pdf6 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf6 Mar 2020
Declaration in FORM BFile: Form B small.pdf6 Mar 2020
Proforma of Allotment letterFile: Agreement to Sale_Spacemint Realty LLP_22012020.pdf6 Mar 2020
PAN CardFile: Spacemint Realty llp Pan Scan Copy.pdf4 Mar 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Easterlia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lohegaon13,700+ in Pune

2 kmEasterliaCompleted 4Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Spacemint Realty LLP

Spacemint Realty LLP has 2 registrations on MahaRERA, including Easterlia and Easterlia Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Easterlia is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Easterlia?

The registered promoter entity is Spacemint Realty LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Easterlia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Easterlia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Easterlia?

The professionals named in the filing: Architect: Imran Shaikh; Engineer: Suhas B Alhat; Chartered Accountant: Kailash Agarwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Easterlia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Easterlia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Easterlia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.