Home / Browse projects / Mumbai Suburban, Maharashtra / EAST POINT.

Registered No litigation declared Commercial project

EAST POINT.

By A A PROPERTY DEVELOPERS

RG-MH-87659 · RERA P51800014661 · Last updated on MahaRERA portal: 27 Feb 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 99%
0Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

EAST POINT. is a Commercial project by A A PROPERTY DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014661 on 20 Dec 2017. Possession is promised by 30 Dec 2027.

At a glance

Project

  • NameEAST POINT.
  • TypeCommercial
  • Location
    • Near S G Barve Street
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014661
  • ReraGenie IDRG-MH-87659

Builder

  • NameA A PROPERTY DEVELOPERS
  • Entity typeOthers
  • Named personATUL JAIPRAKASH GOEL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2017PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Dec 2017
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GROUND FLOORNA60000
FIRST FLOORNA40000
SECOND FLOORNA30000
THIRD FLOORNA20000
FOURTH FLOORNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 27 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 99%.

GROUND FLOOR66%
ActivityProgress
Excavation100%
Basement (if any)74%
Podiums (if any)0%
Plinth74%
Stilt Floor0%
Slabs of Super Structure99%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises77%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks66%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.67%
FIRST FLOOR34%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure99%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Sanitary Fittings within the flats / premises17%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks53%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84%
SECOND FLOOR33%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure99%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Sanitary Fittings within the flats / premises17%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks26%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
THIRD FLOOR32%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure99%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises32%
Sanitary Fittings within the flats / premises17%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks26%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
FOURTH FLOOR18%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.23%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.24%

Progress on shared amenities15

As on 27 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes5%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,862 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI18637.24
Proposed, not sanctioned18,637 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSYNAGOUGE STREET DINSHAW HOUSE CAMP PUNE 411001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOasis Consultants.
EngineerRAFFIULLA
PartnerRole in project
A A PROPERTY DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Feb 2023

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EPM OC 4 RTH Ammend cum part OC dtd 0602 2023compressed (1).pdf27 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EPM ARCH.pdf5 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EPM ARCH.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EPM ENGG.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EPM ENGG.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: EPM 2A.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EPM 2A.pdf5 Feb 2023
Proforma of Allotment letterFile: EAST POINT AGR DRAFT ALLOTMENT LETTER.pdf16 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EAST POINT OC.pdf8 Aug 2021
Copy of the legal title reportFile: KURLA TITLE BY ADV RAJEEV PATEL DATED 01-10-2020.pdf12 Mar 2021
Details of encumbrancesFile: EAST POINT Encumbrance CertificateAdv VasteDated25082020compressed.pdf9 Oct 2020
Declaration in FORM BFile: R1 EAST POINT FORM B 2020.pdf7 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EAST POINT.pdf16 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAST POINT.pdf16 Aug 2019
Form 2AFile: east point form 2A.pdf5 Aug 2019
Declaration in FORM BFile: form b.pdf5 Dec 2017
Proforma of Allotment letterFile: Lease Deed - Kurla - East Point - 5 DEC 2017.pdf5 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf30 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE-min.pdf30 Nov 2017
Copy of the legal title reportFile: _TITLE-min.pdf29 Nov 2017
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf29 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: East point kurla CC NEW.pdf30 Sep 2017
Building plan approvalFile: IOD DECLARATION.pdf29 Sep 2017
Layout approvalFile: RERA EAST POINT IOD ND LAYOUT.pdf29 Sep 2017
PAN CardFile: AA PROPERTY EAST POINT PAN.pdf29 Sep 2017
Copy of Layout Approval (in case of layout)File: RERA EAST POINT IOD ND LAYOUT.pdf29 Sep 2017
Building Plan Approval (IOD)File: IOD DECLARATION.pdf29 Sep 2017
Certificates of CA (Form 3)File: KURLA CA CERTIFICATE.pdf29 Sep 2017
Certificates of CA (Form 5)File: FROM 5.pdf29 Sep 2017
OtherFile: SELF DECLARATION.pdf29 Sep 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EAST POINT. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmEAST POINT.Completed 108Lapsed / revoked 97Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 348 registered projects within 2 km.

Builder: A A PROPERTY DEVELOPERS

A A PROPERTY DEVELOPERS has 2 registrations on MahaRERA, including EAST POINT. and ZAHARA TOWERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if EAST POINT. is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EAST POINT.?

The registered promoter entity is A A PROPERTY DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EAST POINT.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EAST POINT.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EAST POINT.?

The professionals named in the filing: Architect: Oasis Consultants.; Engineer: RAFFIULLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EAST POINT.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EAST POINT.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EAST POINT. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.