EarthCounty

By VTP PROJECTS LLP

RG-MH-14620 · RERA P52100022935 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
59 of 212Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

EarthCounty is a Mixed project by VTP PROJECTS LLP in Pune, Maharashtra, registered with MahaRERA as P52100022935 on 5 Nov 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 153 of the 212 units on this registration are recorded sold or booked.

At a glance

Project

  • NameEarthCounty
  • TypeMixed
  • Location
    • Ranjangaon sone sanghvi road
    • Malthan
    • Shirur
    • Pune
    • 412218
  • Pincode412218
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022935
  • ReraGenie IDRG-MH-14620

Builder

  • NameVTP PROJECTS LLP
  • Entity typePartnership
  • PartnerNilesh Vilaskumar Palresha

Key dates

this monthRegisteredNov 2019First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Nov 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
  • BuildingsNot stated in filing
  • Documents filed101 files

Current status

72%153 of 212 units booked
62.6%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes15%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes2%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area33,947 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jun 2025
LandownerVillageDistrict
Nilesh Palresha-Pune
Bhushan Palresha-Pune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGIONAL DEVELOPMENT AUTHORITY
Permissible FSI25303.68
Proposed, not sanctioned25,304 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANORI, PUNE - 411015
Estimated costRs 19.61 cr
Cost incurredRs 12.28 cr
Work done62.62%
BuildingWingEstimatedIncurred
-NARs 19.61 crRs 12.28 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANGESH MUZUMDAR
ArchitectVIVAAN ASSOCIATES
EngineerPRASHANT GOLE
Chartered AccountantSAC & CO LLP
Chartered AccountantKAILASH AGARWAL & ASSO.
Chartered AccountantPriyanka Chordiya & Associates
PartnerRole in project
VTP PROJECTS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027175Dec 2024 → Dec 2026

Reason as filed by the promoterThe promoter VTP Projects LLP has registered the project ‘EARTH COUNTY’ with the Maharashtra Real Estate Regulatory Authority vide no. P52100022935. It is a plotting project of 212 plots. The project registration was valid from 05/11/2019 up to 30.12.2024 and the Promoter hereby apply first time for extension of 2 years i.e. up to 31.12.2026, based on the following force majeure reasons… 1. Delay Due to Pandemic: Due to Pandemic COVID-19, the operations of the project were substantially affected in the absence of material and unavailability of labour, disturbance in supply chain etc. hence, th

Litigation declared1

CaseCourtStatus
330/2017/2017CivilPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM- 2A earthcounty.pdf6 Jul 2026
Withdrawal Update Form 1File: FORM-1 EARTHCOUNTY.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM-1 EARTHCOUNTY.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2 Earthcountuy 31122025.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 AS Earth County Ph1 122025 compressed.pdf24 Apr 2026
Withdrawal Update Form 3File: form-3 earthcounty 032026.pdf24 Apr 2026
Withdrawal Update Form 1File: EC.pdf17 Oct 2025
Withdrawal Update Form 1File: EC.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 Earthcounty 30092025.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 Earthcounty 30092025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 AS Earth County.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 AS Earth County.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: form 5 Earthcounty 31-03-2025.pdf30 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Earthcounty 21-02-2025 Both Sign.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019-2020.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2022-2023.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-2022.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-2023.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-2024.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Earth County FORM 1.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032023.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032023.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032022.pdf20 Feb 2025
Declaration in FORM BFile: 5.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: EARTH COUNTY 31122024.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: EARTH COUNTY 31122024.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: EARTH COUNTY 31122024.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Earth County Q3 Sign copy.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Earth County Q3 Sign copy.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Earth County Q3 Sign copy.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Earthcounty 30-09-2024_11zon.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Earthcounty 31122024_11zon.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Earthcounty 30-09-2024_11zon.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Earthcounty 31122024_11zon.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Earthcounty 30-09-2024_11zon.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Earthcounty 31122024_11zon.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: EARTH COUNTY 30092024.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: EARTH COUNTY 30092024.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: EARTH COUNTY 30092024.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Earth County.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Earth County.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Earth County.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EARTH COUNTY 30062024.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EARTH COUNTY 30062024.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: EARTH COUNTY 30062024.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: 1 INVENTORY EARTH COUNTY 31032022.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 2 INVENTORY EARTH COUNTY 300620222.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 3 INVENTORY EARTH COUNTY 30092022.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 4 INVENTORY EARTH COUNTY 31122022.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 5 INVENTORY EARTH COUNTY 31032023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 6 INVENTORY EARTH COUNTY 30062023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 7 INVENTORY EARTH COUNTY 30092023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 8 INVENTORY EARTH COUNTY 31122023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: 9 INVENTORY EARTH COUNTY 31032024.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EARTH COUNTY 31032024.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EARTH COUNTY 31032024.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EARTH COUNTY 31122023.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EARTH COUNTY 31122023.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EARTH COUNTY 30092023.PDF30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EARTH COUNTY 30092023.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 EARTH COUNTY 22-23.pdf15 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EARTH COUNTY 30062023.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EARTH COUNTY 30062023_compressed.pdf11 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 EARTHCOUNTY 19-20.PDF9 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Earth County Form 3 Jun 22_compressed.pdf20 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Earth County Form 3 Sep 22_compressed.pdf20 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Earth County Form 3 Dec 22_compressed.pdf20 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Earth County Form 3 March 23_compressed.pdf20 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VTP Projects LLP Architect Certificate.pdf6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032020.pdf6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032021.pdf6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032022.pdf6 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032022_compressed.pdf6 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20 21.pdf6 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21 22.pdf6 Mar 2023
Details of encumbrancesFile: Earth County (2).pdf14 Nov 2022
CERSAI detailsFile: Earthcounty.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: earthcounty.pdf12 Jan 2022

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EarthCounty on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malthan13,700+ in Pune

Builder: VTP PROJECTS LLP

VTP PROJECTS LLP has 1 registration on MahaRERA, including EarthCounty. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EarthCounty is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EarthCounty?

The registered promoter entity is VTP PROJECTS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EarthCounty?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EarthCounty?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EarthCounty?

The professionals named in the filing: Architect: MANGESH MUZUMDAR; Architect: VIVAAN ASSOCIATES; Engineer: PRASHANT GOLE; Chartered Accountant: SAC & CO LLP; Chartered Accountant: KAILASH AGARWAL & ASSO.; Chartered Accountant: Priyanka Chordiya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EarthCounty?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EarthCounty. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EarthCounty to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.