EARTH ANAND
RG-MH-93097 · RERA P51900021985 · Last updated on MahaRERA portal: 2 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 17 months past the filed date
- Completion date moved by 17 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EARTH ANAND is a Others project by M/s. Earth Graphics in Chinch Bunder, 400009, registered with MahaRERA as P51900021985 on 25 Aug 2019. Possession was promised by 31 May 2025 and is now 17 months past that date. The completion date has moved by 17 months from the original filing.
At a glance
Project
- NameEARTH ANAND
- TypeOthers
- Location
- Keshavji Naik Road
- Chinch Bunder
- 400009
- Pincode400009
- RERA no.P51900021985
- ReraGenie IDRG-MH-93097
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on25 Aug 2019
- Promised completion31 May 2025
- Revised completionRevised to 31 May 2025 (originally 22 Dec 2023)
- Buildings1 building record
- Documents filed52 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Earth Anand | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
Earth Anand: 75% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 85% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities16
As on 2 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 40% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 20% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Fitness center | Yes | 20% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Nandkishore Madhav Udas |
| Engineer | Struct Bombay Consultants |
| Chartered Accountant | Sanket R Shah |
| Partner | Role in project |
|---|---|
| M/s. Earth Graphics | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have received approval of additional floor in this project and therefore we require extension for one year to complete the project with receive occupancy certificate and Form 4.
Reason as filed by the promoterWE HAVE APPLIED FOR RERA EXTENSION BECAUSE THE FORMALITY IS PENDING FOR OC APPLICATION AND THEREFORE AS PER RULES AND REGULATION WE APPLIED LESS THAN 1 YEAR. PLEASE APPROVE THE EXTENSTION
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed52
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Earth Anand.pdf | 2 Jul 2025 |
| Declaration in FORM BFile: Form B - Earth Anand.pdf | 1 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NAND KISHORE UDAS CERTIFICATE APRIL 2025.pdf | 1 Jul 2025 |
| Other - TechnicalFile: Annexure A.pdf | 1 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NAND KISHORE UDAS CERTIFICATE APRIL 2025.pdf | 30 Jun 2025 |
| Declaration about Commencement CertificateFile: EARTH ANAND FULL CC JUNE2025.pdf | 30 Jun 2025 |
| Form 3File: Form_III_Dec24_Anand_compressed.pdf | 13 Jun 2025 |
| Form 2File: Form_II_Anand.pdf | 13 Jun 2025 |
| Form 1File: Form_I_Architect_Anand.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec24 - Earth Anand.pdf | 13 Jun 2025 |
| Declaration in FORM BFile: 6.pdf | 4 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 4 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_I_Architect_Anand.pdf | 21 Jan 2025 |
| Certificates of CA (Form 3)File: Form_III_Dec24_Anand_compressed.pdf | 21 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_II_Anand.pdf | 21 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec24 - Earth Anand.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance FY23-24.pdf | 21 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (Mar 24) - Earth Anand.pdf | 21 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Earth Anand.pdf | 21 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclousure of loan - Earth Anand.pdf | 21 Jan 2025 |
| Declaration about Commencement CertificateFile: Latest CC revalidation issue letter (1).pdf | 20 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Work Comp Cert dt 1-12-23_231201_154344.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Legal - Earth Anand.pdf | 3 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances Legal - Earth Anand.pdf | 3 Nov 2023 |
| CERSAI detailsFile: Cersai Declaration - Earth Anand.pdf | 3 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (Mar 23) - Earth Anand.pdf | 3 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: E-ANAND SEPRATE BANK AC.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A March 20 - Earth Anand.pdf | 30 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A March 21 - Earth Anand.pdf | 30 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A March 22 - Earth Anand.pdf | 30 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM V (F Y 21-22) - Earth Anand.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form V March 20 - Earth Anand.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form V March 21 - Earth Anand.pdf | 23 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed upto 15th Floor.pdf | 15 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed upto 15th Floor Revalidated.pdf | 15 Mar 2022 |
| Declaration about Commencement CertificateFile: FurtherCC_signed upto 15th Floor.pdf | 15 Mar 2022 |
| Declaration about Commencement CertificateFile: FurtherCC_signed upto 15th Floor Revalidated.pdf | 15 Mar 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 4 Jul 2019 |
| Layout approvalFile: Layout of Earth Anand.pdf | 25 May 2019 |
| Layout approvalFile: Layout of Earth Anand.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: Layout of Earth Anand.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: Layout of Earth Anand.pdf | 25 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 25 May 2019 |
| Building plan approvalFile: Amended Approval Letter 07082018.pdf | 22 May 2019 |
| Copy of the legal title reportFile: Title Certificate from Advocate_compressed.pdf | 22 May 2019 |
| Building Plan Approval (IOD)File: Amended Approval Letter 07082018.pdf | 22 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: First CC Earth Anand.pdf | 22 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng CERTIFICATE EARTH ANAND.pdf | 22 May 2019 |
| Certificates of CA (Form 3)File: rera cer.pdf | 22 May 2019 |
| PAN CardFile: Earth Graphics Pan Card.pdf | 14 May 2019 |
| Details of encumbrancesFile: Encumbrances.pdf | 14 May 2019 |
| Declaration in FORM BFile: Undertaking.pdf | 14 May 2019 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Earth Galaxy | 163 A Dr BA Road Dadar Mumbai 400014 | 21 | Completed | Apr 2014 | Apr 2014 |
| Earth Pillar | 22 24B Junction of khadilkar road and sadashiv cross road girgaum mumbai 400004 | 54 | Completed | Nov 2012 | Late, Apr 2015 |
| Earth View | 12th Khetwadi Back Road Girgaon Mumbai 400004 | 45 | Completed | Aug 2012 | Aug 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 52 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep EARTH ANAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chinch Bunder
AL AMIR APARTMENT
JANZEB AMIRKAMAL KHAN
AL MEHDI HEIGHTS
AL HAADI DEVELOPERS
Sauda Heights - Phase II
MK India Enterprises
21, Baugh-E-Hasnain
Amex Developers Private Limited
Aqdas Residency
M/s. Alamdar Kapde Developer
HASAN ALI
Citymaker Builders Private Limited
Builder: M/s. Earth Graphics
M/s. Earth Graphics has 3 registrations on MahaRERA, including Earth Darshan and Earth Terrace. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that EARTH ANAND shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if EARTH ANAND is delayed beyond 31 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EARTH ANAND?
The registered promoter entity is M/s. Earth Graphics, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EARTH ANAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EARTH ANAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EARTH ANAND?
The professionals named in the filing: Architect: Mr Nandkishore Madhav Udas; Engineer: Struct Bombay Consultants; Chartered Accountant: Sanket R Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EARTH ANAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback