DYANESHWARI

By DDS BUILDCON

RG-MH-56083 · RERA P52900048563 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 75%
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

DYANESHWARI is a Others project by DDS BUILDCON in Sindhudurg, Maharashtra, registered with MahaRERA as P52900048563 on 6 Jan 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameDYANESHWARI
  • TypeOthers
  • Location
    • Maratha Chitramandir Road
    • Kelbaiwadi Kudal
    • Kudal (CT)
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900048563
  • ReraGenie IDRG-MH-56083

Builder

  • NameDDS BUILDCON
  • Entity typePartnership
  • PartnerNeeta Dnyandev Sawant

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DYANESHWARI Building 1NA77000
DYANESHWARI Building 2NA87000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.

DYANESHWARI Building 162%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
DYANESHWARI Building 221%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth60%
Stilt Floor10%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16
BuildingClosed/CoveredTotal
DYANESHWARI Building 188
DYANESHWARI Building 288

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,713 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Rupali Rajendra PawarMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityKudal Nagar Panchayat
Permissible FSI3860.18
Proposed, not sanctioned3,860 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPratham Apartment, Opp Kudal High School Kudal, Vengurla Road, Tal Kudal, Dist Sindhudurg

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Prabhakar Surve
EngineerManij S Joshi
EngineerSuyog V Tikle
Chartered AccountantJayanti R Kulkarni
PartnerRole in project
DDS BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate 31-03-2026.pdf20 Jun 2026
Form 2File: Engineer Certificate 31-03-2026.pdf20 Jun 2026
Form 3File: CA Certificate 31-03-2026.pdf20 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-03-2026.pdf20 Jun 2026
Form 1File: Architect Certificate 31-12-2025.pdf21 Feb 2026
Form 2File: Engineer Certificate 31-12-2025.pdf21 Feb 2026
Form 3File: CA Certificate 31-12-2025.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-12-2025.pdf21 Feb 2026
Form 1File: Architect Certificate 30-09-2025.pdf14 Dec 2025
Form 2File: Engineer Certificate 30-09-2025.pdf14 Dec 2025
Form 3File: CA Certificate 30-09-2025.pdf14 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30-09-2025.pdf14 Dec 2025
Form 1File: Architects Certificate 30-06-2025.pdf9 Aug 2025
Form 2File: Engineer Certificate 30-06-2025.pdf9 Aug 2025
Form 3File: CA Certificate 30-06-2025.pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30-06-2025.pdf9 Aug 2025
Form 1File: Architect Certificate 31-03-2025.pdf10 Jun 2025
Form 2File: ENGINEER CERTIFICATE 31-03-2025.pdf10 Jun 2025
Form 3File: CA Certificate 31-03-2025.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory 31-03-2025.pdf10 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 AUDIT REPORT 2023-24 .pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 AUDIT REPORT 2023-24 .pdf22 Feb 2025
Building plan approvalFile: Blueprint.pdf14 Feb 2025
Building plan approvalFile: Blueprint.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2024.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 31-12-2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-09-2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30-09-2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31-12-2024.pdf14 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Blueprint.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD 30-09-2024.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD 31-12-2024.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2024.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 31-12-2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-09-2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30-09-2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31-12-2024.pdf14 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Blueprint.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD 30-09-2024.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD 31-12-2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory .pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory .pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory .pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 May 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf19 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf4 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf10 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 31 march 2023.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 30 June 2023.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 1.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 23-24.pdf24 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold 1.pdf24 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold 2.pdf24 Aug 2023

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep DYANESHWARI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kelbaiwadi Kudal530+ in Sindhudurg

2 kmDYANESHWARICompleted 17Lapsed / revoked 13Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: DDS BUILDCON

DDS BUILDCON has 1 registration on MahaRERA, including DYANESHWARI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if DYANESHWARI is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DYANESHWARI?

The registered promoter entity is DDS BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DYANESHWARI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DYANESHWARI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DYANESHWARI?

The professionals named in the filing: Architect: Milind Prabhakar Surve; Engineer: Manij S Joshi; Engineer: Suyog V Tikle; Chartered Accountant: Jayanti R Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DYANESHWARI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DYANESHWARI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DYANESHWARI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.