Dwarkadhish Nagar
RG-MH-79713 · RERA P99000045481 · Last updated on MahaRERA portal: 27 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dwarkadhish Nagar is a Others project by SHREE GEETANJALI BUILDERS in Palghar, Maharashtra, registered with MahaRERA as P99000045481 on 24 May 2022. Possession is promised by 31 Mar 2028. 125 of the 256 units on this registration are recorded sold or booked, and 15 of 66 construction stages are filed complete.
At a glance
Project
- NameDwarkadhish Nagar
- TypeOthers
- Location
- Chillar Road
- Man
- Palghar
- 401501
- Pincode401501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000045481
- ReraGenie IDRG-MH-79713
Builder
- NameSHREE GEETANJALI BUILDERS
- Entity typePartnership
- GSTIN27ADYFS6683G1Z3
- PartnersNeetu Himanshu Joshi, Himangi Himanshu Joshi, Nandini Himanshu Joshi, Hemlata Dwarkadhish Joshi, Himanshu Dwarkadhish Joshi, Kuldeep Singh Kothari, Gajendra Himanshu Joshi, Shikha Kuldeep Kothari
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 May 2022
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings6 building records
- Documents filed165 files
Current status
Figures as on 27 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 1 | null | 7 | 7 | 28 | 14 | 42 |
| Building No 2 | null | 7 | 7 | 28 | 20 | 48 |
| Building No 3 | NA | 7 | 7 | 48 | 13 | 61 |
| Building No 4 | NA | 7 | 7 | 48 | 13 | 61 |
| Building No 5 | null | 7 | 7 | 43 | 0 | 43 |
| Building No 7 | NIL | 1 | 1 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 80%.
Building No 1 · wing null66%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 2 · wing null56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 40% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 335%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 30% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 412%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 30% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 5 · wing null9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 7 · wing NIL0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed244
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Building No 1 null | 35 | 27 | 62 |
| Building No 2 null | 11 | 54 | 65 |
| Building No 3 | 25 | 15 | 40 |
| Building No 4 | 25 | 15 | 40 |
| Building No 5 null | 32 | 0 | 32 |
| Building No 7 NIL | 0 | 5 | 5 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HEMLATA DWARKADHISH JOSHI | Manor | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 8.35 cr | - |
| Building No 2 | null | Rs 7.55 cr | Rs 4.91 cr |
| Building No 1 | null | Rs 7.24 cr | Rs 6.15 cr |
| Building No 3 | NA | Rs 6.70 cr | Rs 2.34 cr |
| Building No 4 | NA | Rs 6.70 cr | Rs 33.50 lakh |
| Building No 5 | null | Rs 5.66 cr | Rs 28.31 lakh |
| Building No 7 | NIL | Rs 97.46 lakh | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Skyline Pouraj Kore |
| Engineer | Yogesh Vaza Darsh Consult |
| Engineer | Ganesh Balu Vartha Balu Vartha |
| Chartered Accountant | Bharat Dhonde & Co |
| Chartered Accountant | KALPANA MANISH GARG |
| Chartered Accountant | ARTI PARASNATH YADAV |
| Chartered Accountant | Ajay Singh Co LLP |
| Partner | Role in project |
|---|---|
| SHREE GEETANJALI BUILDERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed165
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 165 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2022-2023)File: Engg- Cert- 22-23 27-Jun-2026 14-59-31.pdf | 27 Jun 2026 |
| Form 2A (FY 2023-2024)File: 23-24 27-Jun-2026 15-04-28.pdf | 27 Jun 2026 |
| Form 2A (FY 2024-2025)File: 24-25 27-Jun-2026 15-06-37.pdf | 27 Jun 2026 |
| Form 2A (FY 2025-2026)File: 25-26 27-Jun-2026 15-09-07.pdf | 27 Jun 2026 |
| Form 5 (FY 2022-2023)File: geetanjali form 5.pdf | 27 Jun 2026 |
| Form 5 (FY 2023-2024)File: Form 5 shree geetanjali builders.pdf | 27 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_compressed.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 (2).pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Architecture Certificate.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Architecture Certificate.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Architecture Certificate.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: ENGINNER CERTIFICATE.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jan 2026 |
| Layout approvalFile: 4cdabddc-3070-429c-a66f-1c5e7bb0fab1.pdf | 31 Dec 2025 |
| Building plan approvalFile: layout plan sgb.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: RERA Form 1 Q2 Fy 2025-26.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: RERA Form 2 Q2 Fy 2025-26.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Form3 Rera.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 q1 fy2025-26.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 q1 fy2025-26.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 q1 fy2025-26.pdf | 25 Oct 2025 |
| Form 5 (FY 2024-2025)File: Shree Geetaanjali builder FY 2024-25.pdf | 30 Sep 2025 |
| Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 4 Aug 2025 |
| Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 4 Aug 2025 |
| Form 3File: RERA form 3 Q1.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 01_Q1 FY 2022-23 sold unsold.pdf | 4 Aug 2025 |
| Form 1File: Form 1 Arcitect Certificate.pdf | 4 Aug 2025 |
| Form 2File: Form 2 Engineer certificate.pdf | 4 Aug 2025 |
| Form 3File: Form 3 RERA CACERTIFICATE_.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 02_Q2 FY 2022-23 sold unsold.pdf | 4 Aug 2025 |
| Form 1File: architect Cetificate.pdf | 4 Aug 2025 |
| Form 2File: Engineer's Certificate.pdf | 4 Aug 2025 |
| Form 3File: FORM 3 SHREEGEETANJALI Q3.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 03_Q3 FY 2022-23 unsold sold.pdf | 4 Aug 2025 |
| Form 1File: Architect Certificate.pdf | 4 Aug 2025 |
| Form 2File: ENGINEER'S CERTIFICATE.pdf | 4 Aug 2025 |
| Form 3File: form 3 SHREEGEETANJALI Q4.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 04_Q4 FY 2022-23.pdf | 4 Aug 2025 |
| Form 1File: Form 1 Architect Certificate.pdf | 4 Aug 2025 |
| Form 2File: Form 2 Consultant Certificate.pdf | 4 Aug 2025 |
| Form 3File: Form 3 Shree geetanjali.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 06_Q2 FY 2023-24.pdf | 4 Aug 2025 |
| Form 1File: FORM 1.pdf | 4 Aug 2025 |
| Form 2File: FORM 2 DWARKADHISH NAGAR.pdf | 4 Aug 2025 |
| Form 3File: FORM 3.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 07_Q3 FY2023-24.pdf | 4 Aug 2025 |
| Form 1File: Form 1 q4 fy 2023-24.pdf | 4 Aug 2025 |
| Form 2File: Form 2 q4 fy 2023-24.pdf | 4 Aug 2025 |
| Form 3File: Form 3 q4 fy 2023-24 orginal.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 08_Q4 FY 2023-24.pdf | 4 Aug 2025 |
| Form 1File: Form 1.pdf | 4 Aug 2025 |
| Form 2File: form 2.pdf | 4 Aug 2025 |
| Form 3File: form 3 q1 fy2024-25.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 09_Q1 FY 2024-25.pdf | 4 Aug 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 165 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dwarkadhish Nagar on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Man3,200+ in Palghar
Birla Mrida
Birla Estates Private Limited
Roop Rajat Park Phase 3
MAHAVIR ASSOCIATES
AGAMI INFINITY PARK
MAYURESH REALTY PRIVATE LIMITED
Luxury Empire Township Phase I
VEENAA DEVELOPERS PRIVATE LIMITED
MAHAVIR ARCADE
MAHAVIR DEVELOPERS AND REALTORS
SHANTI VISTA - II
SHAH REALTY CORPORATION
See every Palghar project, with the district possession charts
Builder: SHREE GEETANJALI BUILDERS
SHREE GEETANJALI BUILDERS has 1 registration on MahaRERA, including Dwarkadhish Nagar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Dwarkadhish Nagar is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dwarkadhish Nagar?
The registered promoter entity is SHREE GEETANJALI BUILDERS, a partnership as per the filing. Its GSTIN 27ADYFS6683G1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dwarkadhish Nagar?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dwarkadhish Nagar?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dwarkadhish Nagar?
The professionals named in the filing: Architect: Skyline Pouraj Kore; Engineer: Yogesh Vaza Darsh Consult; Engineer: Ganesh Balu Vartha Balu Vartha; Chartered Accountant: Bharat Dhonde & Co; Chartered Accountant: KALPANA MANISH GARG; Chartered Accountant: ARTI PARASNATH YADAV. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dwarkadhish Nagar?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback