DWARKADHEESH RESIDENCY
RG-MH-37553 · RERA P52100017380 · Last updated on MahaRERA portal: 7 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 42 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DWARKADHEESH RESIDENCY is a Residential / Group Housing project by HARICHANDRA RAMBHAU SATAV in Pune, Maharashtra, registered with MahaRERA as P52100017380 on 9 Aug 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 19 of the 24 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameDWARKADHEESH RESIDENCY
- TypeResidential / Group Housing
- Location
- NEAR SHRIKRISHNA MANDHIR
- MALWADI
- DEHU
- Haveli
- Pune
- 412109
- Pincode412109
- RERA no.P52100017380
- ReraGenie IDRG-MH-37553
Builder
- NameHARICHANDRA RAMBHAU SATAV
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed136 files
Current status
Figures as on 7 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DWARKADHEESH RESIDENCY | NA | 6 | 6 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 0%.
DWARKADHEESH RESIDENCY: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ARUN RAMBHAU SATAV | DEHU | Pune |
| GOPICHAND RAMBHAU SATAV | DEHU | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DWARKADHEESH RESIDENCY | NA | Rs 2.58 cr | Rs 2.43 cr |
| - | NA | Rs 37.49 lakh | Rs 37.49 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MILIND JAGATAP |
| Architect | MJ ASSOCIATES |
| Engineer | SWAPNIL KUDNAR |
| Engineer | Swapnil BHAUSAHEB Kudnar |
| Chartered Accountant | TEJALI DESARDA SUJIT DESARDA |
| Chartered Accountant | KHUNE SANGHAVI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| HARICHANDRA RAMBHAU SATAV | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAPPLICATION FOR EXTENSION OF PROJECT PLS APPROVAL MY APPLICATION
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed136
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: June 2025.pdf | 7 Jul 2026 |
| Withdrawal Update Form 1File: Sept 2025.pdf | 7 Jul 2026 |
| Withdrawal Update Form 1File: Dec 2025.pdf | 7 Jul 2026 |
| Withdrawal Update Form 1File: March 2026.pdf | 7 Jul 2026 |
| Withdrawal Update Form 2File: JUNE 2025.pdf | 7 Jul 2026 |
| Withdrawal Update Form 2File: SEPT 25.pdf | 7 Jul 2026 |
| Withdrawal Update Form 2File: DEC 2025.pdf | 7 Jul 2026 |
| Withdrawal Update Form 2File: MARCH 26.pdf | 7 Jul 2026 |
| Withdrawal Update Form 3File: JUNE 2025.pdf | 7 Jul 2026 |
| Withdrawal Update Form 3File: sep 25.pdf | 7 Jul 2026 |
| Withdrawal Update Form 3File: Dec 25.pdf | 7 Jul 2026 |
| Withdrawal Update Form 3File: Mar 26.pdf | 7 Jul 2026 |
| Form 1File: 30 sept 2024.pdf | 5 Jul 2026 |
| Form 2File: 30 sep 2024.pdf | 5 Jul 2026 |
| Form 3File: Sep 2024.pdf | 5 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: sep 2024.pdf | 5 Jul 2026 |
| Form 1File: 30 dec 2024.pdf | 5 Jul 2026 |
| Form 2File: 31Dec 2024.pdf | 5 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: as on dec 2024.pdf | 5 Jul 2026 |
| Form 3File: dec 2024.pdf | 5 Jul 2026 |
| Form 1File: 31 mar 2025.pdf | 5 Jul 2026 |
| Form 2File: 31 Mar 2025.pdf | 5 Jul 2026 |
| Form 3File: Mar 2025.pdf | 5 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: mar 2025.pdf | 5 Jul 2026 |
| Form 1File: 30 june 2024.pdf | 3 Jul 2026 |
| Form 2File: 30 Jun 2024.pdf | 3 Jul 2026 |
| Form 3File: jun 2024.pdf | 3 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: june 2024.pdf | 3 Jul 2026 |
| Declaration in FORM BFile: FORM B NEW.pdf | 7 Jun 2024 |
| Details of encumbrancesFile: ENCUMBRANCE DECLARATION.pdf | 31 May 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION.pdf | 31 May 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION.pdf | 31 May 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 2020.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2021.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2022.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2023.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2024.pdf | 31 May 2024 |
| Disclosure of sold/ booked inventoryFile: resolution consent for extension .pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 DEC 2018.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 JUNE 2018.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 MARCH 19.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 SEPT 2018.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 JUNE 19.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 SEPT 19.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 DEC 19.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 MARCH 20.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 JUNE 20.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 SEPT 20.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 DEC 20.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 MARCH 21.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 JUNE 2021.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 SEPT 2021.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 DEC 2021.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 MARCH 2022.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 JUNE 22.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 SEPT 22.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 DEC 22.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 MARCH 23.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 JUNE 23.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 SEPT 23.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 DEC 23.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: FORM 03 MARCH 24.pdf | 31 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST ANNEXURE A.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 05 17-18.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 05 18-19.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 05 19-20.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 05 20-21.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 05 22-23.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 05 21-22.pdf | 31 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLATATION BANK ACCOUNT.pdf | 31 May 2024 |
| Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER ANNEXURE i_compressed.pdf | 31 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 QUTER 18-19.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 QUTER 18-19.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 QUTER 18-19.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 QUTER 18-19.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 quter 19-20.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 quter 19-20.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 quter 19-20.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 quter 19-20.pdf | 30 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 136 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DWARKADHEESH RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MALWADI13,700+ in Pune
Gathagram Sector 2
HARIT LANDMARKS LLP
ANANDI VIHAR
SANSKRUTI DEVELOPERS
GATHAGRAM SECTOR-3 PHASE-1
HARIT LANDMARKS LLP
KESHAV KUNJ
M/S SANSKRUTI DEVELOPERS AND BUILDERS
VRUNDAVAN PARK
BG ASSOCIATES
Rivereast Residency
KRUSHNA PARADISE DEVELOPERS
Builder: HARICHANDRA RAMBHAU SATAV
HARICHANDRA RAMBHAU SATAV has 1 registration on MahaRERA, including DWARKADHEESH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DWARKADHEESH RESIDENCY is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DWARKADHEESH RESIDENCY?
The registered promoter entity is HARICHANDRA RAMBHAU SATAV, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DWARKADHEESH RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DWARKADHEESH RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DWARKADHEESH RESIDENCY?
The professionals named in the filing: Architect: MILIND JAGATAP; Architect: MJ ASSOCIATES; Engineer: SWAPNIL KUDNAR; Engineer: Swapnil BHAUSAHEB Kudnar; Chartered Accountant: TEJALI DESARDA SUJIT DESARDA; Chartered Accountant: KHUNE SANGHAVI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DWARKADHEESH RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback