DWARKA PROJECT2
By NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
RG-MH-08113 · RERA P52100000168 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- 16 complaints at MahaRERA
- Completion date moved by 96 months
- 4 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DWARKA PROJECT2 is a Residential / Group Housing project by NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD in Pune, Maharashtra, registered with MahaRERA as P52100000168 on 7 Jul 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 143 of the 192 units on this registration are recorded sold or booked, and 27 of 44 construction stages are filed complete. 16 complaints are on record with the regulator.
At a glance
Project
- NameDWARKA PROJECT2
- TypeResidential / Group Housing
- Location
- CHAKAN
- Mahalunge
- Khed
- Pune
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000168
- ReraGenie IDRG-MH-08113
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Jul 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
- Buildings4 building records
- Documents filed222 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C19 | NA | 13 | 0 | 48 | 0 | 48 |
| C20 | NA | 13 | 0 | 48 | 0 | 48 |
| C21 | NA | 13 | 0 | 48 | 0 | 48 |
| C22 | NA | 13 | 13 | 48 | 0 | 48 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 98%.
C1991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C2058%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 98% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C2141%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 69% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 2% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C2291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed168
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| C19 | 16 | 26 | 42 |
| C20 | 16 | 26 | 42 |
| C21 | 16 | 26 | 42 |
| C22 | 16 | 26 | 42 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C21 | NA | Rs 6.14 cr | Rs 2.20 cr |
| C20 | NA | Rs 6.11 cr | Rs 3.74 cr |
| C22 | NA | Rs 6.00 cr | Rs 6.00 cr |
| C19 | NA | Rs 5.93 cr | Rs 5.93 cr |
| - | NA | Rs 4.91 cr | Rs 2.95 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAURI NAIKNAVARE |
| Engineer | KRUPALI KADAM |
| Engineer | Pramod Ghume |
| Engineer | Ravindra Ukhade |
| Chartered Accountant | AKSHAY SHRISHRIMAL |
| Chartered Accountant | KKSS & ASSOCIATES |
| Partner | Role in project |
|---|---|
| NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. It is experienced by the Promoter that there are number of challenges such as availing finance, slowdown in market in implementing and completing the Real Estate Projects. Since last 3-4 years Real Estate industry is experiencing significant recessionary trends, which resulted in a severe working capital finance crunch. We have been trying our level best to complete our projects on time. 2. The Promoter had availed project finance from Diwan Housing Finance Corporation Ltd (DHFL). However, the Promoter could not avail finance facility in smooth manner from the said DHFL. Subsequently, DHFL
Reason as filed by the promoterWe have registered our Project DWARKA PROJECT 2 - P52100000168 under RERA. The completion date for the project is 30 TH JUNE 2021. But considering the COVID-19 situation, we are unable to complete our Project due to various reasons mentioned as under. As you are aware, due to lockdown announced by the Government of Maharashtra, the labours moved from site to their native places. Mostly the labours are from other States like UP, Bihar Orissa, Assam, Rajasthan etc. The labour strength on site reduced drastically. At the same time there is shortage of material. As some factories production reduce
Reason as filed by the promoterDate : 12.12.2023 To MahaRERA MUMBAI Subject : Application for the extension of “Dwarka” Project - 2 with reason P52100000168 in RERA Dear Sir, We Have registered our “Dwarka” Project -2 P52100000168 under RERA. The completion date for the said project was 30th Dec 2022. We have already applied for RERA Extension on date 29th Dec 2022.We submits that the said project consist of Bldg. C19 :- Completed & Occupancy Certificate received , Bldg .C22 & Development :-Under Construction Phase , Bldg C20, C21 :- No booking & only Plinth ready. We state that , in Building C19 consist of 48 Flats and sol
Reason as filed by the promoterDate: 19/09/2025 To, MahaRERA, Mumbai Subject: Application for Extension of Registration under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016 - Dwarka Project 2 (MahaRERA Registration No. P52100000168). Respected Sir/Madam, We, Naiknavare Housing Developments Pvt. Ltd., promoters of Dwarka Project 2 (Reg. No. P52100000168), respectfully submit this application for extension of registration under Section 7(3) of the Act. The project comprises four buildings, C19, C20, C21, and C22. Out of these, C19 and C22 have already been completed and handed over to allottees. Occupa
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 137/2013 | DISTRICT COURT PUNE | Closed |
| R DARKHAST NO 611/2012 | CJJD PUNE | Closed |
| 3165/2016 | HIGH COURT BOMBAY | Closed |
Complaints filed with MahaRERA16
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000011054 | Vikas Pandit Kirange | Naiknavare Housing Developments Pvt. Ltd. | 04/03/2018 |
| CC005000000010502 | Ashutosh Sadanand Karmarkar | RANJIT NAIKNAVARE-NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD | 04/11/2017 |
| CC005000000054112 | ASHUTOSH SADANAND KARMARKAR | NAIKNAVARE HOUSING DEVELOPMENT PVT LTD | 05/03/2020 |
| CC005000000011068 | Bhushan Kulkarni | Hemant Naiknavare | 28/02/2018 |
| CC005000000064597 | Bhushan Vijay Kulkarni | Naiknavare Housing Developers Pvt. Ltd. | 07/09/2020 |
| CC005000000064298 | Lokesh Kirange | Naiknavare Builders Pvt. Ltd. | 08/12/2020 |
| CC005000000095712 | Mr. Animesh Singh Patel & Mrs. Meenakshi Bajwa | Naiknavare Housing Development Private Limited Through Mr. Hemant Naiknavare & Mr. Ranjit Naiknavare | 23/06/2021 |
| CC005000000054096 | Shailendra Shrivastava | Ranjit Naiknavare | 10/03/2020 |
| CC005000000054181 | Ashvini Pendse, Milind Pendse | Naiknavare Developers | 23/03/2020 |
| CC005000000064587 | Sachin Suresh Chaskar | Naiknavare Housing Development Pvt Ltd | 05/09/2020 |
| CC005000000259069 | Cebin Kochery Varghese | Naiknavare Developers Private Limited | 29/07/2023 |
| CC005000000106760 | Pratibha Mahesh Swar | HEMANT DATTAJI NAIKNAVARE | 28/04/2022 |
| CC005000000157242 | SUNIL KAMAT | NAIKNAVARE HOUSING DEVELOPMENT PVT LTD | 29/06/2022 |
| CC005000000228343 | Pankaj Praveen Harkare | NAIKNAVARE HOUSING DEVELOPMENT PVT LTD | 05/04/2023 |
| CC005000000238646 | SNEHAL VIBHUTE | NAIKWARE HOUSING DEVELOPMENT PVT LTD | 08/04/2023 |
| CC005000000258812 | SHRIKANT SHRIPAD TONGAONKAR | NAIKWARE HOUSING DEVELOPMENT PVT LTD | 11/05/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Oct 2022
Documents filed222
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 222 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Dwarka pro 2 Form 1.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: Dwarka 2 Form 2.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: dwarka 29(1-9)_merged_compressed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: AAA_20260420204135 (1).pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: DWARKA 2 FORM 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: dwarka 29(1-9)_merged_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: DWARKA PROJECT 2 FORM 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: DWARKA PRO 2 FORM 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: dwarka 2 FORM 3FINAL_merged.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 05 12 2025 DWR PRO 2.pdf | 6 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 05 12 2025 DWR PRO 2.pdf | 6 Dec 2025 |
| Withdrawal Update Form 3File: Form 3_compressed.pdf | 6 Dec 2025 |
| Form 2A (FY 2025-2026)File: FORM 2A 05 12 2025 DWR PRO 2.pdf | 5 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 (4).pdf | 5 Dec 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A MARCH 24.pdf | 8 Oct 2025 |
| Form 2A (FY 2017-2018)File: FORM 2A MARCH 18.pdf | 8 Oct 2025 |
| Form 2A (FY 2018-2019)File: FORM 2A MARCH 19.pdf | 8 Oct 2025 |
| Form 2A (FY 2019-2020)File: FORM 2A MARCH 20.pdf | 8 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A MARCH 25.pdf | 8 Oct 2025 |
| Form 2A (FY 2021-2022)File: FORM 2A MARCH 22.pdf | 8 Oct 2025 |
| Form 2A (FY 2020-2021)File: FORM 2A MARCH 21.pdf | 8 Oct 2025 |
| Form 2A (FY 2022-2023)File: FORM 2A MARCH 23.pdf | 8 Oct 2025 |
| Form 5 (FY 2017-2018)File: Project 2-17-18.pdf | 11 Sep 2025 |
| Form 5 (FY 2018-2019)File: Dwarka Project-2-18-19.pdf | 11 Sep 2025 |
| Form 5 (FY 2019-2020)File: Dwarka Project-2-19-20.pdf | 11 Sep 2025 |
| Form 5 (FY 2020-2021)File: Dwarka Project-2-20-21.pdf | 11 Sep 2025 |
| Form 5 (FY 2021-2022)File: Dwarka Project-2-21-22.pdf | 11 Sep 2025 |
| Form 5 (FY 2022-2023)File: Dwarka Project-2-22-23.pdf | 11 Sep 2025 |
| Form 5 (FY 2023-2024)File: Dwarka Project-2-23-24.pdf | 10 Sep 2025 |
| Form 1File: Dwarka Pro2 - Uploaded.pdf | 4 Sep 2025 |
| Form 2File: Dwarka Pro2 - Uploaded.pdf | 4 Sep 2025 |
| Form 3File: Dwaraka 2 - Uploaded.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Dwarka Project 2 - Sold_Booked Inventory_compressed (1).pdf | 4 Sep 2025 |
| Form 1File: DWARKA PRO 2 FORM 1 OCT DEC 24.pdf | 4 Sep 2025 |
| Form 2File: DWARKA PRO 2 FORM 2 OCT DEC 24.pdf | 4 Sep 2025 |
| Form 3File: FORM 3.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DWR 2 SOLD UNSOLD OCT DEC 24.pdf | 4 Sep 2025 |
| Form 1File: Dwarka Pro2 - Uploaded.pdf | 4 Sep 2025 |
| Form 2File: Dwarka Pro2.pdf | 4 Sep 2025 |
| Form 3File: Form 3 16 10 24.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DWR 2 SOLD UNSOLD JUL SEPT 24.pdf | 4 Sep 2025 |
| Form 1File: DWR 2 FORM 1 APR JUN 24.pdf | 4 Sep 2025 |
| Form 2File: DWR 2 FORM 2 APR JUN 24.pdf | 4 Sep 2025 |
| Form 3File: Form 3 11 7 24.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DWR SOLD UNSOLD APR JUN 24.pdf | 4 Sep 2025 |
| Form 2File: DWR FORM 2 JAN MAR 24.pdf | 4 Sep 2025 |
| Form 1File: Dwarka Pro2.pdf | 4 Sep 2025 |
| Form 3File: DWR 2 FORM 3 JAN APR 24.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 9 Disclosure of sold_ booked inventory.pdf | 4 Sep 2025 |
| Form 1File: DWR 2 FORM 1 DEC 23.pdf | 4 Sep 2025 |
| Form 2File: DWR 2 FORM 2 DEC 23.pdf | 4 Sep 2025 |
| Form 3File: DWR 2 FORM 3 DEC 23.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DWR 2 SOLD UNSOLD DEC 23.pdf | 4 Sep 2025 |
| Form 1File: Dwarka Pro2 - uPLOADED.pdf | 4 Sep 2025 |
| Form 2File: Dwarka Pro2 - uPLOADED.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DWR PRO 2 SOLD UNSOLD SEPT 23 (1).pdf | 4 Sep 2025 |
| Form 3File: dwr form 2 19 10 23.pdf | 4 Sep 2025 |
| Form 1File: Dwarka Pro 2 - Uploaded.pdf | 4 Sep 2025 |
| Form 2File: Form 2- Dwarka Pro2 - June 2023 - uPLOADED.pdf | 4 Sep 2025 |
| Form 3File: Dwarka Project-2_compressed (1) - Uploaded.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: ilovepdf_merged (1).pdf | 4 Sep 2025 |
| Form 1File: Dwarka Pro2 Arch Certi 28032023 - Uploaded.pdf | 4 Sep 2025 |
| Form 2File: Dwarka Pro 2- Form 2 Jan to March 2023 - Uploaded.pdf | 4 Sep 2025 |
| Form 3File: Dwaraka Pro 2 FORM3 -31 March 2023 - Uploaded.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DWR 2 SOLD UNSOLD MAR 23.pdf | 4 Sep 2025 |
| Form 1File: DWR 2 FORM 1 DEC 22.pdf | 4 Sep 2025 |
| Form 2File: DWARKA 2 FORM 2 DEC 22.pdf | 4 Sep 2025 |
| Form 3File: DWR 2 FORM 3 DEC 22.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DWR 2 SOLD UNSOLD DEC 22_rotated (1).pdf | 4 Sep 2025 |
| Form 1File: DWARKA PRO 2 FORM 1.pdf | 19 Jul 2025 |
| Form 2File: DWARKA PRO 2 FORM 2.pdf | 19 Jul 2025 |
| Form 3File: Dwarka 2 Form 3.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Dwarka pro 2 sold unsold.pdf | 19 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: DWARKA PRO 2 SELF DECLARATION.pdf | 19 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dwarka Pro2.pdf | 18 Apr 2025 |
| Certificates of CA (Form 3)File: Dwaraka 2.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Dwarka Pro2.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dwarka Pro2.pdf | 8 Apr 2025 |
| Certificates of CA (Form 3)File: DWARKA 2 MERGED_compressed.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DWARKA PRO 2.pdf | 16 Jan 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DWARKA SEC 1B | VILLAGE MHALUNGE TAL KHED DIST PUNE | 384 | Completed | Mar 2015 | Late, Oct 2015 |
| DWARKA D3,D4 | VILLAGE MHALUNGE TAL KHED DIST PUNE | 64 | Completed | Mar 2015 | Late, Sep 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 222 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DWARKA PROJECT2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHAKAN13,700+ in Pune
Filed coordinates, straight-line distance. 16 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD has 3 registrations on MahaRERA, including DWARKA PROJECT 1 and DWARKA PROJECT2. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DWARKA PROJECT2 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DWARKA PROJECT2?
The registered promoter entity is NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DWARKA PROJECT2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against DWARKA PROJECT2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for DWARKA PROJECT2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DWARKA PROJECT2?
The professionals named in the filing: Architect: GAURI NAIKNAVARE; Engineer: KRUPALI KADAM; Engineer: Pramod Ghume; Engineer: Ravindra Ukhade; Chartered Accountant: AKSHAY SHRISHRIMAL; Chartered Accountant: KKSS & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DWARKA PROJECT2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback