ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / DWARKA PROJECT 5

Registered No litigation declared Residential / Group Housing project

DWARKA PROJECT 5

By NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD

RG-MH-19013 · RERA P52100077980 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 38%
64 of 143Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

DWARKA PROJECT 5 is a Residential / Group Housing project by NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100077980 on 14 Nov 2024. Possession is promised by 30 Jun 2027. 79 of the 143 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameDWARKA PROJECT 5
  • TypeResidential / Group Housing
  • Location
    • CHAKAN TALEGAON ROAD
    • CHAKAN
    • Mahalunge
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • RERA no.P52100077980
  • ReraGenie IDRG-MH-19013

Builder

  • NameNAIKNAVARE HOUSING DEVELOPMENTS PVT LTD
  • Entity typeCompany
  • Managing DirectorsRANJIT DATTAJI NAIKNAVARE, HEMANT DATTAJI NAIKNAVARE
  • Other registrations3 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

55%79 of 143 units booked
22.5%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING C43NA13121430143

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 38%.

BUILDING C43: 31% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,223 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI13964.8
Proposed, not sanctioned6,982 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1264/1, WRANGLER PARANJPE ROAD, JANGALI MAHARAJ ROAD, DECCAN GYMKHANA, PUNE-411004
Estimated costRs 20.00 cr
Cost incurredRs 4.50 cr
Work done22.5%
BuildingWingEstimatedIncurred
BUILDING C43NARs 19.20 crRs 4.50 cr
-NARs 80.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGauri Hemant Naiknavare
EngineerPramod Ghume
Chartered AccountantKKSS and ASSOCIATES
Chartered AccountantPRAG AND CO
Chartered AccountantSHRISHRIMAL AND ASSOCIATES
PartnerRole in project
NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: DWARKA PROJECT 5 RERA JAN MAR 26.pdf20 Apr 2026
Withdrawal Update Form 2File: DWARKA 5 FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Dwarka 5(1-8)_merged_compressed.pdf20 Apr 2026
Form 1File: DWARKA PROJCT-5 - Uploaded.pdf2 Feb 2026
Form 2File: Dwarka Pro5 - Uploaded.pdf2 Feb 2026
Form 3File: Dwarka 5 - Uploaded.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dwarka Project 5 - Sold_Booked Inventory.pdf2 Feb 2026
Withdrawal Update Form 1File: DWARKA PROJECT 5 OCT DEC 25.pdf20 Jan 2026
Withdrawal Update Form 2File: DWARA PRO 5 FORM 2.pdf20 Jan 2026
Withdrawal Update Form 3File: dwarka 5 form 3 20_01_2026.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Certificate_Dwarka 5.pdf2 Dec 2025
Form 1File: dwarka pro 5 form 1.pdf18 Oct 2025
Form 2File: DWARKA PRO 5 FORM 2.pdf18 Oct 2025
Form 3File: DWARKA 5 FORM 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: DWARKA PRO 5 SOLD UNSOLD.pdf18 Oct 2025
Form 1File: DWARKA PRO 5 FORM 1_compressed.pdf20 Jul 2025
Form 2File: DWARKA PRO 5 FORM 2.pdf20 Jul 2025
Form 3File: Dwarka 5 FORM 3 (1).pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: DWARKA PRO 5 SELF DECLARATION.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Dwarka pro 5 sold unsold.pdf20 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Dwarka Pro5.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dwarka 5.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWARKA PROJCT-5.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dwarka Pro5.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3-DWARKA-5 (1)_compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C 43 RERA ARCH CERTIFICATE PROJECT 5.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWARKA PRO 5.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: dwarka pro 5.pdf16 Jan 2025
Other - LegalFile: महाळुंगे 97 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 88 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 91 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 92 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 95 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 96 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 97 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 113 2 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 122 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 123 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 124 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 125 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 126 1 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 127 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 128 1 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे 128 2 Satbara.pdf29 Oct 2024
Other - LegalFile: महाळुंगे_113_2_Satbara.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20241021195244-pages (1) (1).pdf28 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (2).pdf17 Oct 2024
Other - TechnicalFile: GetUserDocumentFileContent (14) (1).pdf17 Oct 2024
Other - TechnicalFile: rera MAIL.pdf17 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ORDER NO 39 RDN.pdf17 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Format C.pdf17 Oct 2024
Other - LegalFile: SD GAT 90 (1).pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 20241016175056.pdf16 Oct 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (3)-pages (1).pdf11 Oct 2024
Proforma of Agreement for saleFile: c43 ats 21 10 24.pdf11 Oct 2024
Building plan approvalFile: BLDG C-43 Sanction Plan No 17_11zon.pdf10 Oct 2024
Building plan approvalFile: BLDG C 43 Sanction Plan No 16_11zon.pdf10 Oct 2024
Building plan approvalFile: BLDG C43 Sanction Plan No 15_compressed.pdf10 Oct 2024
Layout approvalFile: Sanction Layout Plan 01 -- C43_11zon (2).pdf10 Oct 2024
PAN CardFile: NHDPL PAN.pdf10 Oct 2024
Copy of the legal title reportFile: ilovepdf_merged.pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: dwarka project-5 undertaking (1) (1).pdf10 Oct 2024
Copy of Layout Approval (in case of layout)File: Sanction Layout Plan 01 -- C43_11zon (2).pdf10 Oct 2024
Declaration in FORM BFile: dwarka c43 revised form b.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 08 24-RERA ARCH CERTIFICATE PROJECT 5 (1).pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dwarka 5 form3_merged_compressed.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - C43.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG C43 Sanction Plan No 15_compressed.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG C 43 Sanction Plan No 16_11zon.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG C-43 Sanction Plan No 17_11zon.pdf10 Oct 2024
Declaration about Commencement CertificateFile: GetUserDocumentFileContent (1).pdf10 Oct 2024
CERSAI detailsFile: Dwarka project 5 No Cersai.pdf10 Oct 2024
Deviation Report with respect to Allotment letterFile: dated deviation allotment c43.pdf10 Oct 2024
Details of encumbrances concerned to LegalFile: dwarka project-5 undertaking (1) (1).pdf10 Oct 2024
Deviation Report with respect to model copy of AgreementFile: dated deviation c43.pdf10 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: TJSB BANK LETTER.PDF10 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DWARKAChakan Talegoan Road Mahalunge Talkhed Pune Maharashtra496CompletedSep 2013Late, Dec 2013

How this compares with Pune

55%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DWARKA PROJECT 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAKAN13,700+ in Pune

Builder: NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD

NAIKNAVARE HOUSING DEVELOPMENTS PVT. LTD. has 4 registrations on MahaRERA, including AVASAGRASSLAND and AVASA GROVELAND. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DWARKA PROJECT 5 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DWARKA PROJECT 5?

The registered promoter entity is NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DWARKA PROJECT 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DWARKA PROJECT 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DWARKA PROJECT 5?

The professionals named in the filing: Architect: Gauri Hemant Naiknavare; Engineer: Pramod Ghume; Chartered Accountant: KKSS and ASSOCIATES; Chartered Accountant: PRAG AND CO; Chartered Accountant: SHRISHRIMAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DWARKA PROJECT 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DWARKA PROJECT 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DWARKA PROJECT 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.