Home / Browse projects / Pune, Maharashtra / DWARKA PROJECT 1
DWARKA PROJECT 1
By NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
RG-MH-08089 · RERA P52100000164 · Last updated on MahaRERA portal: 8 Apr 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DWARKA PROJECT 1 is a Residential / Group Housing project by NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD in Pune, Maharashtra, registered with MahaRERA as P52100000164 on 7 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018.
At a glance
Project
- NameDWARKA PROJECT 1
- TypeResidential / Group Housing
- Location
- CHAKAN
- Mahalunge
- Khed
- Pune
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000164
- ReraGenie IDRG-MH-08089
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Jul 2017
- Promised completion31 Dec 2018
- Revised completionNone
- Buildings3 building records
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG D1 | NA | 9 | 0 | 0 | 0 | 0 |
| BLDG D2 | NA | 9 | 0 | 0 | 0 | 0 |
| CLUB HOUSE | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 67%.
BLDG D191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BLDG D291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLUB HOUSE46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 67% |
| Sanitary Fittings within the flats / premises | 12% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 0% |
Parking filed67
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BLDG D1 | 14 | 18 | 32 |
| BLDG D2 | 14 | 18 | 32 |
| CLUB HOUSE | 0 | 3 | 3 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAURI NAIKNAVARE |
| Engineer | KRUPALI KADAM |
| Partner | Role in project |
|---|---|
| NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Oct 2019
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dwarka Pro1.pdf | 8 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dwarka Pro1.pdf | 4 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dwarka Pro1- June 2023.pdf | 25 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dwarka Pro 1- Form 2 Jan To March 2023.pdf | 12 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certi - Sector 3A.pdf | 31 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dwarka Pro1.pdf | 19 Jan 2023 |
| Certificates of CA (Form 5)File: Dwarka Pro1 Form 5.pdf | 6 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DWR PRO 1 FORM 1 JUN SEPT 22.pdf | 14 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DWR PROJ 01 Arch Certi 30042022.pdf | 4 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DWR PROJ 01 ENGG CERT 15042022.pdf | 18 Apr 2022 |
| Certificates of CA (Form 5)File: 6 Certificates of CA (Form 5).pdf | 9 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 03012022.pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 03012022.pdf | 7 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DWR-PROJ 01 ARCH CERT 02102021.pdf | 4 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 02102021.pdf | 4 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3 Dwarka Project 130062021.pdf | 16 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 02082021.pdf | 2 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 02082021.pdf | 2 Aug 2021 |
| Certificates of CA (Form 5)File: MAHARERA FORM 5 DWA P1.pdf | 22 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 27042021.pdf | 27 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 27042021.pdf | 27 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 08102020.pdf | 13 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ01 ENGG CERT 08102020.pdf | 13 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 26062020.pdf | 7 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 26062020.pdf | 7 Jul 2020 |
| Certificates of CA (Form 5)File: Form 5 Dwarka P1.pdf | 22 Jan 2020 |
| Certificates of CA (Form 3)File: rera certificate.PDF | 15 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 05012020.pdf | 13 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 05012020.pdf | 6 Jan 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: D2 FORM 4 ARCH 20122019.pdf | 20 Dec 2019 |
| Certificates of CA (Form 5)File: Form 5 Dwarka P1.pdf | 14 Nov 2019 |
| OtherFile: CREDAINDPL MEM CERT 2020.pdf | 4 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 05102019.pdf | 3 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 05102019.pdf | 3 Oct 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BLDG D1 D2 COMPLITION CERTIFICATE.pdf | 3 Oct 2019 |
| OtherFile: BLDG D1 AND D2 COMPLITION CERTIFICATE.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT PROJECT 01 05072019.pdf | 5 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 05072019.pdf | 5 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT PROJECT 01 05042019.pdf | 5 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT PROJECT 01 05042019.pdf | 5 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJECT 01 ARCH CERT 05012019.pdf | 7 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJECT 01 ENGG CERT 05012019.pdf | 5 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJECT 01 ARCH CERT 05102018.pdf | 8 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJECT 01 ENGG CERT 05102018.pdf | 6 Oct 2018 |
| Certificates of CA (Form 5)File: NHDPL Project 1.pdf | 30 Sep 2018 |
| Certificates of CA (Form 5)File: NHDPL Project 1.pdf | 29 Sep 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJECT 01 ARCH CERT.pdf | 6 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJECT01 ENG CERT.pdf | 6 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJECT01 ARCH CERT 05042018.pdf | 11 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJECT 01ENG CERT 05042018.pdf | 11 Apr 2018 |
| Certificates of CA (Form 3)File: PROJECT 1 DWARKA CA CERT 05012018.pdf | 9 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJECT01 ARCH CERT 05012018.pdf | 5 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJECT01ENG CERT 05012018.pdf | 5 Jan 2018 |
| Certificates of CA (Form 3)File: PRO 1 CA CERT 07102017.PDF | 7 Oct 2017 |
| Certificates of CA (Form 3)File: PRO 01 CA CERT 07102017.PDF | 7 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJECT 01 ENGCERT 05102017.pdf | 6 Oct 2017 |
| OtherFile: PROJECT01 ARCH CERT 05102017.pdf | 6 Oct 2017 |
| Details of encumbrancesFile: Dwarka DHFL Certificate.pdf | 5 Jul 2017 |
| Declaration in FORM BFile: FORM B PROJECT 1.pdf | 5 Jul 2017 |
| Certificates of CA (Form 3)File: Dwarka Project 1.pdf | 5 Jul 2017 |
| Layout approvalFile: LAYOUTPLAN.pdf | 4 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUTPLAN.pdf | 4 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMM CERTDWARKA.pdf | 30 Jun 2017 |
| Building plan approvalFile: 01 LAYOUT.pdf | 29 Jun 2017 |
| Building plan approvalFile: CLUB HOUSE SANCTION 2016.pdf | 29 Jun 2017 |
| Building plan approvalFile: D1D2BLDG.pdf | 29 Jun 2017 |
| PAN CardFile: NHDPL PAN CARD.pdf | 29 Jun 2017 |
| Copy of the legal title reportFile: Dwarka Project 1TR.pdf | 29 Jun 2017 |
| Building Plan Approval (IOD)File: 01 LAYOUT.pdf | 29 Jun 2017 |
| Building Plan Approval (IOD)File: CLUB HOUSE SANCTION 2016.pdf | 29 Jun 2017 |
| Building Plan Approval (IOD)File: D1D2BLDG.pdf | 29 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archcertproject01.pdf | 29 Jun 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engcertproject1.pdf | 29 Jun 2017 |
| Proforma of Allotment letterFile: Project 1.pdf | 29 Jun 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DWARKA SEC 1B | VILLAGE MHALUNGE TAL KHED DIST PUNE | 384 | Completed | Mar 2015 | Late, Oct 2015 |
| DWARKA D3,D4 | VILLAGEVMHALUNGE TAL KHED DIST PUNE | 64 | Completed | Mar 2015 | Late, Sep 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
Keep DWARKA PROJECT 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHAKAN13,700+ in Pune
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD has 3 registrations on MahaRERA, including DWARKA PROJECT 1 and DWARKA PROJECT2. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DWARKA PROJECT 1 is delayed beyond 31 Dec 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DWARKA PROJECT 1?
The registered promoter entity is NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DWARKA PROJECT 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DWARKA PROJECT 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DWARKA PROJECT 1?
The professionals named in the filing: Architect: GAURI NAIKNAVARE; Engineer: KRUPALI KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DWARKA PROJECT 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback