Home / Browse projects / Kolhapur, Maharashtra / Dwarka Heights Phase II

Registration lapsed No litigation declared Residential / Group Housing project

Dwarka Heights Phase II

By M/S. J.K. Infrastructure

RG-MH-26323 · RERA P53000014505 · Last updated on MahaRERA portal: 10 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 78 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
6 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Dwarka Heights Phase II is a Residential / Group Housing project by M/S. J.K. Infrastructure in Kolhapur, Maharashtra, registered with MahaRERA as P53000014505 on 5 Dec 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 78 months from the original filing. 12 of the 18 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameDwarka Heights Phase II
  • TypeResidential / Group Housing
  • Location
    • --
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416007
  • Pincode416007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000014505
  • ReraGenie IDRG-MH-26323

Builder

  • NameM/S. J.K. Infrastructure
  • Entity typePartnership
  • PartnerPramila Dwarkanath Jarag

Key dates

4 months past promisethis monthRegisteredDec 2017First promiseDec 2019Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Dec 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed86 files

Current status

67%12 of 18 units booked

Figures as on 10 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dwarka Heights Phase IINA3318018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Dwarka Heights Phase II: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 10 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,081 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Aug 2025

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI1835.74
Proposed, not sanctioned1,836 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBaba Jarag Nagar, Kolhapur Anand Smruti Behind Panchgaon Naka, Baba Jarag Nagar Last Bus Stop

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Sambhaji D Patil
EngineerSangram H Kudalkar
Chartered AccountantManoj Adake & Co
PartnerRole in project
M/S. J.K. Infrastructure-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53000005391Dec 2019 → Dec 2020

Reason as filed by the promoterThe development work of my Real Estate Project is going on. But due to present Real Estate market condition we are unable to complete the said project in projected period i.e. on 31/12/2019.

EXT53000011714Dec 2019 → Dec 2022

Reason as filed by the promoterOur construction of real estate project is totally completed and we have submitted an Application for Completion /occupancy certificate to the Kolhapur Municipal Corporation (KMC) in OCT 2021. We have complied all the formalities for the completion of our Real Estate Project as per rules of KMC and as per new circular of the government of Maharashtra dated 29/11/2017 has to issue completion certificate within 8 (Eight) days from the due compliance otherwise the project is deemed to be completed . The written completion certificate is yet to be received by us. So considering above facts, we kin

EXT53000013962Dec 2019 → Jun 2024

Reason as filed by the promoterWe have got Revised sanctioned from Kolhapur Municipal Corporation for 7th floor. hence we have applied for extension.

EXT53000024345Dec 2019 → Jun 2025

Reason as filed by the promoterWe completed our construction work of real estate project but we have to received some NOCs from concerned departments hence we apply for extend our completion date till 30/06/2025. As soon as we got all NOCs we will apply for completion certificate to Kolhapur Municipal Corporation and same will upload our RERA portal. it will take more 2-3 months to received completion certificate from Concern Authority, Hence We Humbly request to the authority to grant our extension application till 30/06/2025.

EA14082502377Dec 2019 → Jun 2026

Reason as filed by the promoterWe have completed our project and also applied for completion Certificate to Kolhapur Municipal Corporation it will take more time to received Completion Certificate. Hence we applied for extension till 30 June 2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2017-2018)File: Form 5 17-18.pdf10 Sep 2025
Form 5 (FY 2018-2019)File: Form 5 18-19.pdf10 Sep 2025
Form 5 (FY 2019-2020)File: Form 5 19-20.pdf10 Sep 2025
Form 5 (FY 2020-2021)File: Form 5 20-21.pdf10 Sep 2025
Form 5 (FY 2021-2022)File: Form 5 21-22.pdf10 Sep 2025
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf10 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf10 Sep 2025
Form 2A (FY 2025-2026)File: Form 2A 25.pdf9 Sep 2025
Form 2A (FY 2024-2025)File: 23-24.pdf8 Sep 2025
Form 2A (FY 2020-2021)File: 20-21.pdf6 Sep 2025
Form 2A (FY 2021-2022)File: 21-22.pdf6 Sep 2025
Form 2A (FY 2022-2023)File: 23-24.pdf6 Sep 2025
Form 2A (FY 2023-2024)File: 23-24.pdf6 Sep 2025
Form 2A (FY 2019-2020)File: 19-20.pdf5 Sep 2025
Form 2A (FY 2017-2018)File: 17-18.pdf4 Sep 2025
Form 2A (FY 2018-2019)File: 17-18.pdf4 Sep 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf11 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf11 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A f.pdf11 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1.pdf7 Jan 2025
Certificates of CA (Form 3)File: form 3.pdf7 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold inventry.pdf7 Jan 2025
Declaration in FORM BFile: Form B.pdf19 Nov 2024
Declaration in FORM BFile: Form B.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf7 Nov 2024
Certificates of CA (Form 3)File: Form 3.pdf7 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf7 Nov 2024
Declaration in FORM BFile: Form B.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Invetory.pdf16 Jul 2024
Certificates of CA (Form 3)File: Form 3.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_0001.pdf14 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf14 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf14 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf14 May 2024
Certificates of CA (Form 3)File: Form 3.pdf14 May 2024
Building plan approvalFile: Plan 1.pdf27 Mar 2023
Building Plan Approval (IOD)File: Plan 1.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Pramila Jarag.pdf27 Mar 2023
Building plan approvalFile: HPSC1498.pdf28 Feb 2023
Building plan approvalFile: HPSC1499.pdf28 Feb 2023
Building plan approvalFile: HPSC1501.pdf28 Feb 2023
Building plan approvalFile: HPSC1502.pdf28 Feb 2023
Building Plan Approval (IOD)File: HPSC1498.pdf28 Feb 2023
Building Plan Approval (IOD)File: HPSC1499.pdf28 Feb 2023
Building Plan Approval (IOD)File: HPSC1501.pdf28 Feb 2023
Building Plan Approval (IOD)File: HPSC1502.pdf28 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf28 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf28 Feb 2023
Certificates of CA (Form 3)File: CA Certificate.pdf28 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory J K Infrastucture.pdf11 Apr 2022
CERSAI detailsFile: CERSAI.pdf7 Apr 2022
Declaration about Commencement CertificateFile: Format D.pdf6 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf6 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf6 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf6 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf6 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf6 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf6 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate11242017.pdf24 Nov 2017
OtherFile: Proposed Plan.pdf24 Nov 2017
Copy of the legal title reportFile: Search Report.pdf28 Oct 2017
Details of encumbrancesFile: Morgage index .pdf28 Oct 2017
Layout approvalFile: Sanctioned Plan 1st to 5th.PDF27 Oct 2017
PAN CardFile: Jarag Pan Card.pdf27 Oct 2017
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 1st to 5th.PDF27 Oct 2017
Declaration in FORM BFile: Jarag- Declaration Form B.pdf27 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jarag Architect Certificate.pdf27 Oct 2017
Building plan approvalFile: shreee000011115.PDF14 Oct 2017
Building plan approvalFile: shreee000011116.PDF14 Oct 2017

How this compares with Kolhapur

67%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one moved by 78 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is among them

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Dwarka Heights Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolhapur (M Corp.)880+ in Kolhapur

2 kmDwarka Heights Phase IICompleted 14Lapsed / revoked 4Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: M/S. J.K. Infrastructure

M/S. J.K. Infrastructure has 1 registration on MahaRERA, including Dwarka Heights Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What does it mean that Dwarka Heights Phase II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Dwarka Heights Phase II is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dwarka Heights Phase II?

The registered promoter entity is M/S. J.K. Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dwarka Heights Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dwarka Heights Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dwarka Heights Phase II?

The professionals named in the filing: Architect: Mr Sambhaji D Patil; Engineer: Sangram H Kudalkar; Chartered Accountant: Manoj Adake & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dwarka Heights Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dwarka Heights Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dwarka Heights Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.