Home / Browse projects / Thane, Maharashtra / DURGA ENCLAVE

Registered No litigation declared Others project

DURGA ENCLAVE

By ANMOL DEVELOPERS

RG-MH-03268 · RERA P51700022467 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
6 of 11Construction stages donefurthest along: Stilt Floor, 95%
26 of 106Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

DURGA ENCLAVE is a Others project by ANMOL DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700022467 on 25 Sep 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 80 of the 106 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameDURGA ENCLAVE
  • TypeOthers
  • Location
    • NAVGHAR
    • BHAYANER
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • RERA no.P51700022467
  • ReraGenie IDRG-MH-03268

Builder

  • NameANMOL DEVELOPERS
  • Entity typePartnership
  • PartnersCHANDMAL MISHRILAL OSTWAL, MUKESH SHANTILAL WADALA, KARUNA DINESH SIKHWAL, RAJUL CHANDMAL OSTWAL, NITIN JAIN, JEETMAL SAGARMAL JAIN, PRAKASH TRILOKCHAND JAIN, PUSHPA HIMATLAL JAIN, SUNIL CHANDMAL WADALA
  • Other registrations6 more →
  • Completed3 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2019First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Sep 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed76 files

Current status

75%80 of 106 units booked
98.0%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DURGA ENCLAVENA20199214106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

DURGA ENCLAVE: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,920 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMira-Bhayandar Municipal Corporation
Permissible FSI2328.74
Proposed, not sanctioned1,167 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHARSH PLAZA 100 FT ROAD MIRAROAD EAST Thane 401107
Estimated costRs 29.50 cr
Cost incurredRs 28.91 cr
Work done98.0%
BuildingWingEstimatedIncurred
DURGA ENCLAVENARs 29.50 crRs 28.91 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAPEX CONSULTANCY
EngineerAPEX CONSULTANCY
Chartered AccountantRAMESH D LUKAD
PartnerRole in project
ANMOL DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018738Dec 2024 → Dec 2025

Reason as filed by the promoterEXTENSION required for final completion of project and to complete statutory compliance

EA02012619232Dec 2024 → Dec 2026

Reason as filed by the promoterThe Promoter respectfully submits that the present application for extension of the project completion date up to 30.12.2026 is made under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016, based on the updated PERT Chart Schedule and the balance construction activities required for completion of the project. As per the PERT Chart, major structural works such as excavation, plinth, stilts, and slabs of superstructure have been substantially completed, while balance masonry and internal works including internal walls, internal plaster, and flooring are currently ongoing and

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf3 Jun 2026
Withdrawal Update Form 1File: form 1.pdf3 Jun 2026
Withdrawal Update Form 2File: form 2.pdf3 Jun 2026
Withdrawal Update Form 2File: form 2.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf3 Jun 2026
Withdrawal Update Form 1File: form 1.pdf11 Feb 2026
Withdrawal Update Form 2File: form 2.pdf11 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf11 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A -Anmol Developer.pdf11 Feb 2026
Withdrawal Update Form 1File: form 1 (2).pdf22 Jan 2026
Withdrawal Update Form 1File: form 1 (2).pdf22 Jan 2026
Withdrawal Update Form 2File: form 2 (1).pdf22 Jan 2026
Withdrawal Update Form 2File: form 2 (1).pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 July-Sep.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 July-Sep.pdf22 Jan 2026
Form 5 (FY 2024-2025)File: ANMOL DEV ANNUL REPORT_removed.pdf17 Jan 2026
Withdrawal Update Form 1File: Form-1 July-Sep.pdf2 Jan 2026
Withdrawal Update Form 2File: Form-2 July-Sep.pdf2 Jan 2026
Withdrawal Update Form 3File: Form 3 July-Sep.pdf2 Jan 2026
Withdrawal Update Form 1File: Form-1 April-June.pdf29 Dec 2025
Withdrawal Update Form 1File: Form-1 July-Sep.pdf29 Dec 2025
Withdrawal Update Form 2File: Form-2 April-June.pdf29 Dec 2025
Withdrawal Update Form 2File: Form-2 July-Sep.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 April-June.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 July-Sep.pdf29 Dec 2025
Form 2A (FY 2019-2020)File: (Form 2A FY 2019-20).pdf29 Dec 2025
Form 2A (FY 2020-2021)File: (Form 2A FY 2020-21).pdf29 Dec 2025
Form 2A (FY 2021-2022)File: (Form 2A FY 2020-21).pdf29 Dec 2025
Form 2A (FY 2022-2023)File: (Form 2A FY 2022-23).pdf29 Dec 2025
Form 2A (FY 2023-2024)File: (Form 2A FY 2023-24).pdf29 Dec 2025
Form 5 (FY 2019-2020)File: (Form 2A FY 2019-20).pdf29 Dec 2025
Form 5 (FY 2020-2021)File: (Form 2A FY 2020-21).pdf29 Dec 2025
Form 5 (FY 2021-2022)File: (Form 2A FY 2021-22).pdf29 Dec 2025
Form 5 (FY 2022-2023)File: (Form 2A FY 2022-23).pdf29 Dec 2025
Form 5 (FY 2023-2024)File: (Form 2A FY 2023-24).pdf29 Dec 2025
Disclosure of sold/ booked inventoryFile: disclosure of sold flats-ANMOL.pdf25 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: BANK DETAILS - ANMOL.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect's certificate.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Dec 2024
Proforma of Agreement for saleFile: draft agreement durga enclave.pdf21 Dec 2024
Other - TechnicalFile: construction schedule.pdf20 Dec 2024
Other - TechnicalFile: 1 Details of encumbrances_page-0001.pdf9 Dec 2024
Other - TechnicalFile: BUILDUILING PLAN.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate .pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANMOL DEVELOPER_compressed.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Nov 2024
Declaration in FORM BFile: Form B.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 -19-20.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 -21-22.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-21-22.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: fORM 2a-22-23.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 -22-23.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -23-24.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 -23-24.pdf11 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 20221226012507.pdf13 Jan 2023
Declaration about Commencement CertificateFile: Format D.pdf25 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate.pdf25 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance.pdf25 Dec 2021
CERSAI detailsFile: Self Declaration.pdf25 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf25 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 (2020-21).pdf25 Dec 2021
Proforma of Allotment letterFile: Scan7.pdf16 Sep 2019
Declaration in FORM BFile: Form B.pdf9 Sep 2019
Proforma of Allotment letterFile: ANMOL DEVELOPER.pdf9 Sep 2019
Layout approvalFile: HPSCANN.pdf29 Aug 2019
Building plan approvalFile: LAYOUT.pdf29 Aug 2019
Copy of Layout Approval (in case of layout)File: HPSCANN.pdf29 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT.pdf29 Aug 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anmol Developes.pdf29 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anmol Developers.pdf29 Aug 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol Develope.pdf29 Aug 2019
PAN CardFile: Anmol Developers Pan Card.pdf2 May 2019
Copy of the legal title reportFile: Title Report.pdf2 May 2019
Details of encumbrancesFile: Anmol Developers-SELF DECLARATION.pdf2 May 2019
Commencement Certificates / NA Order for plotted developmentFile: C C.pdf2 May 2019

How this compares with Thane

75%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DURGA ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANER7,600+ in Thane

Builder: ANMOL DEVELOPERS

ANMOL DEVELOPERS has 7 registrations on MahaRERA, including THE NATURE and ANMOL RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DURGA ENCLAVE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DURGA ENCLAVE?

The registered promoter entity is ANMOL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DURGA ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DURGA ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DURGA ENCLAVE?

The professionals named in the filing: Architect: APEX CONSULTANCY; Engineer: APEX CONSULTANCY; Chartered Accountant: RAMESH D LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DURGA ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DURGA ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DURGA ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.