Home / Browse projects / Nagpur, Maharashtra / DREAM OASIS

Registered No litigation declared Residential / Group Housing project

DREAM OASIS

By SHREE G INFRA

RG-MH-44414 · RERA P50500051146 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
7 of 11Construction stages donefurthest along: Staircases, 85%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

DREAM OASIS is a Residential / Group Housing project by SHREE G INFRA in Nagpur, Maharashtra, registered with MahaRERA as P50500051146 on 1 Jun 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameDREAM OASIS
  • TypeResidential / Group Housing
  • Location
    • BESA PIPLA ROAD
    • MAHALAXMI NAGAR
    • Pipla
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500051146
  • ReraGenie IDRG-MH-44414

Builder

  • NameSHREE G INFRA
  • Entity typePartnership
  • PartnersGANESH ANANDRAO AMBONE, DEVENDRA PRAKASH DESHMUKH, NITIN HARI JADHAV

Key dates

this monthRegisteredJun 2023First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 25 Dec 2024)
  • Buildings1 building record
  • Documents filed84 files

Current status

82.3%Work done, per cost certificate

Figures as on 4 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DREAM OASISNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

DREAM OASIS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,321 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2025
LandownerVillageDistrict
GANESH ANANDRAO AMBONENagpur (M Corp.)Nagpur
ARYA PLANNERS AND BUILDERSNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNMRDA
Permissible FSI3693.5
Proposed, not sanctioned3,694 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSEWADAL NAGAR
Estimated costRs 14.06 cr
Cost incurredRs 11.57 cr
Work done82.28%
BuildingWingEstimatedIncurred
DREAM OASISNARs 13.61 crRs 11.57 cr
-NARs 45.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURAV BHUSARI
ArchitectPRIYANKA MEGHE
EngineerPRIYANKA MEGHE
EngineerASHISH SHIWARKAR
Chartered AccountantMUKUND M BARVE
Chartered AccountantVILAS VISHNU SARANJAME
PartnerRole in project
SHREE G INFRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500027131Dec 2024 → Dec 2026

Reason as filed by the promoterWHILE APPLYING CERTIFICATE BY MISTAKENLY WE APPLY PERIOD OF CONSTRUCTION FOR I YEAR ONLY. HENCE WE REQUIRED 1 YEAR MORE PERIOD FOR COMPLETION OF PROJECT.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1- ARCHITECT CERTIFICATE - Q1.pdf4 Jul 2026
Form 2File: FORM -2- ENGINEERS CERTIFICATE - Q1.pdf4 Jul 2026
Form 3File: FORM-3-CA CERTIFICATE -Q1.pdf4 Jul 2026
Disclosure of Sold and Booked InventoryFile: DETAILS OF SOLD INVENTRY.pdf4 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A-26.pdf4 Jul 2026
Form 1File: Q4-FORM 1- ARCHITECT CERTIFICATE.pdf15 Apr 2026
Form 2File: Q-4-FORM2-ENGINEERS CERTIFICATE.pdf15 Apr 2026
Form 3File: Q-4-FORM3-CA CERTIFIACTE.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: DETAILS OF SOLD INVENTRY.pdf15 Apr 2026
Form 1File: Q-3-ARCHITECTS CERTIFICATE.pdf9 Jan 2026
Form 2File: Q-3-ENGINEERS CERTIFICATE.pdf9 Jan 2026
Form 3File: Q-3-CA CERTIFICATE.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: DETAILS OF SOLD INVENTRY.pdf9 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2A-25.pdf14 Nov 2025
Form 5 (FY 2024-2025)File: FORM-5-25.pdf6 Nov 2025
Withdrawal Update Form 1File: Q-1- ARCHITECT CERTIFICATE.pdf8 Oct 2025
Withdrawal Update Form 1File: Q-2- ARCHITECT CERTIFICATE.pdf8 Oct 2025
Withdrawal Update Form 1File: Q-2- ARCHITECT CERTIFICATE.pdf8 Oct 2025
Withdrawal Update Form 2File: Q-1 - ENGINEERS CERTIFICATE.pdf8 Oct 2025
Withdrawal Update Form 2File: Q-2 - ENGINEERS CERTIFICATE.pdf8 Oct 2025
Withdrawal Update Form 2File: Q-2 - ENGINEERS CERTIFICATE.pdf8 Oct 2025
Withdrawal Update Form 3File: FORM 3 C A CERTIFICATE UPDATED.pdf8 Oct 2025
Withdrawal Update Form 3File: Q-2- CA CERTIFICATE.pdf8 Oct 2025
Withdrawal Update Form 3File: Q-2- CA CERTIFICATE.pdf8 Oct 2025
Form 2A (FY 2023-2024)File: Engineer certificate scan1.pdf11 Jul 2025
Form 5 (FY 2023-2024)File: FORM - 5.pdf11 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - MAR 25_compressed.pdf9 Jul 2025
Form 2File: ENGINEER CERTIFICATE - MAR 25_compressed.pdf9 Jul 2025
Form 3File: CA CERTIFICATE - MAR 25.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD MAR 25.pdf9 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - DEC 24.pdf9 Jul 2025
Form 2File: ENGINEERS CERTIFICATE - DEC 24.pdf9 Jul 2025
Form 3File: CA CERTIFICATE - DEC24.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD DEC 24.pdf9 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - SEP 24.pdf9 Jul 2025
Form 2File: ENGINEERS CERTIFICATE - SEP 24.pdf9 Jul 2025
Form 3File: CA CERTIFICATE - SEP 24.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD SEP 24.pdf9 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - JUNE 24.pdf9 Jul 2025
Form 2File: ENGINEERS CERTIFICATE - JUNE 24.pdf9 Jul 2025
Form 3File: CA CERTIFICATE - JUNE 24.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD JUNE 24.pdf9 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - MAR 24.pdf9 Jul 2025
Form 2File: ENGINEERS CERTIFICATE - MAR 24.pdf9 Jul 2025
Form 3File: CA CERTIFICATE - MAR 24.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD MAR 24.pdf9 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - DEC 23.pdf9 Jul 2025
Form 2File: ENGINEERS CERTIFICATE- DEC 23.pdf9 Jul 2025
Form 3File: CA CERTIFICATE - DEC 23.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD DEC 23.pdf9 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - SEP 23.pdf9 Jul 2025
Form 2File: ENGINEERS CERTIFICATE - SEP 23.pdf9 Jul 2025
Form 3File: CA CERTIFICATE - SEP 23.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD SEP 23.pdf9 Jul 2025
Form 1File: ARCHITECT CERTIFICATE - JUN 23.pdf9 Jul 2025
Form 2File: ENGINEERS CERTIFICATE - JUN 23.pdf9 Jul 2025
Form 3File: CA CERTIFICATE JUNE 23.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD JUNE23.pdf9 Jul 2025
Building plan approvalFile: SANCTION BUILDING MAP1.pdf24 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION BUILDING MAP1.pdf24 Apr 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf24 Apr 2023
Copy of the legal title reportFile: TITLE REPORT.pdf12 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A CERTIFICATE UPDATED.pdf12 Apr 2023
Details of encumbrances concerned to FinanceFile: CLEAR TITLE NON ENCUMBERANCE CERTIFICATE.pdf6 Apr 2023
Details of encumbrances concerned to LegalFile: CLEAR TITLE NON ENCUMBERANCE CERTIFICATE.pdf6 Apr 2023
CERSAI detailsFile: NO CERSAI REPORT.pdf31 Mar 2023
Deviation Report with respect to Allotment letterFile: DEVIATION TO ALLOTMENT REPORT.pdf31 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf31 Mar 2023
Details of encumbrances concerned to FinanceFile: legal encumberence.pdf29 Mar 2023
Details of encumbrances concerned to LegalFile: legal encumberence.pdf29 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: CHEQUE.pdf29 Mar 2023
Layout approvalFile: Layout Plan-final residential1.pdf25 Mar 2023
Building plan approvalFile: SANCTION MAP1.pdf25 Mar 2023
Building plan approvalFile: N A ORDER.pdf25 Mar 2023
Copy of Layout Approval (in case of layout)File: Layout Plan-final residential1.pdf25 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION MAP1.pdf25 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: N A ORDER.pdf25 Mar 2023
Declaration in FORM BFile: FORM B .pdf25 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMIT.pdf24 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DESCLOSURE OF INTEREST.pdf23 Mar 2023

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 24 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DREAM OASIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHALAXMI NAGAR2,800+ in Nagpur

2 kmDREAM OASISCompleted 19Lapsed / revoked 16Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: SHREE G INFRA

SHREE G INFRA has 1 registration on MahaRERA, including DREAM OASIS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if DREAM OASIS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DREAM OASIS?

The registered promoter entity is SHREE G INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DREAM OASIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DREAM OASIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DREAM OASIS?

The professionals named in the filing: Architect: GAURAV BHUSARI; Architect: PRIYANKA MEGHE; Engineer: PRIYANKA MEGHE; Engineer: ASHISH SHIWARKAR; Chartered Accountant: MUKUND M BARVE; Chartered Accountant: VILAS VISHNU SARANJAME. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DREAM OASIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DREAM OASIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DREAM OASIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.