Home / Browse projects / Nagpur, Maharashtra / DREAM AAWAS

Completed No litigation declared Others project

DREAM AAWAS

By KARAMCHAND REALTECH PRIVATE LIMITED and NEERJA REALTORS PRIVATE LIMITED

RG-MH-50374 · RERA P50500017640 · Last updated on MahaRERA portal: 28 Feb 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
66 of 66Construction stages doneacross 6 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

DREAM AAWAS is a Others project by KARAMCHAND REALTECH PRIVATE LIMITED and NEERJA REALTORS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500017640 on 29 Aug 2018. The registration is recorded completed; possession was promised by 30 Jun 2022.

At a glance

Project

  • NameDREAM AAWAS
  • TypeOthers
  • Location
    • Shankarpur Panjari Road
    • Mouza Shankarpur
    • Shankarpur
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500017640
  • ReraGenie IDRG-MH-50374

Builder

  • NameKARAMCHAND REALTECH PRIVATE LIMITED and NEERJA REALTORS PRIVATE LIMITED
  • Entity typeOthers
  • Named personsKARAMCHAND REALTECH PRIVATE LIMITED, NEERJA REALTORS PRIVATE LIMITED

Key dates

this monthRegisteredAug 2018PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Aug 2018
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings6 building records
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA100000
BUILDING BNA100000
BUILDING CNA100000
BUILDING 1 SHOPSNA10000
BUILDING 2 SHOPSNA10000
Community BuildingNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 28 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

66 of 66 construction stages are filed complete across 6 buildings.

BUILDING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 1 SHOPS100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 2 SHOPS100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Community Building100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered75
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A25227
BUILDING B25227
BUILDING C25227
BUILDING 1 SHOPS011
BUILDING 2 SHOPS011
Community Building044

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,231 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13150.49
Proposed, not sanctioned10,034 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANKAR NAGAR BRANCH CHANDAK BHAWAN NORTH AMBAZARI ROAD NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRASHANT SATPUTE DESIGN CELL
EngineerPRAKASH DHAWADE
Chartered AccountantCA Abhinav Welekar Partner in APJ AND ASSOCIATES
PartnerRole in project
KARAMCHAND REALTECH PRIVATE LIMITED and NEERJA REALTORS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jan 2023

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Dream Aawas_FY 2021-22.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DREAM AAWAS ARCHITECT'S CERTIFICATE 15 JUNE 2022.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SCAN FORM 2 02-11-2018.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SCAN FORM 2 27-01-2019.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 30 SEP 2020.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A March 21.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SALES DATA FOR RERA TILL 30 JUNE 2021.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 30 SEP 2021.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 31 DEC 2021.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: DREAM AAWAS FORM 2A 31 MARCH 2022.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: DREAM AAWAS SALES DATA 15 JUNE 2022 RERA.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Dream Aawas FY2020-21.pdf16 Feb 2023
Certificates of CA (Form 3)File: CA_16_krpl_nrpl.pdf10 Feb 2023
Certificates of CA (Form 3)File: CA_2_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_3_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: Form-3.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_5_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_6_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_7_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_8_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_9_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_10_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_11_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_12_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_13_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_14_krpl_nrpl.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA_15_krpl_nrpl.pdf30 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DREAM AAWAS PROJECT FINAL OCCUPANCY CERTIFICATE 14 JUNE 2022.pdf30 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: 2_Form 4 of Dream Aawas After OC dtd14-06-22.pdf30 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter to RERA for Formation of Association.pdf28 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DREAM AAWAS FIRST ASSOCIATION MEETING - MOM of meeting.pdf28 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31-03-2022.pdf14 May 2022
Disclosure of sold/ booked inventoryFile: DREAM AAWAS SALES DATA 31ST MARCH 2022.pdf14 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT CERTIFICATE BLDG A B C SHOP 31 DEC 2021.pdf18 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT'S CERTIFICATE CLUB HOUSE 31 DEC 2021.pdf18 Jan 2022
Form 2AFile: FORM 2A 31 DEC 2021.pdf18 Jan 2022
Disclosure of sold/ booked inventoryFile: DREAM AAWAS SALES DATA 31 DEC 2021 RERA.pdf18 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Dream Aawas FY2020-21.pdf24 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate 30 SEP 2021.pdf14 Oct 2021
Form 2AFile: FORM 2A 30 SEP 2021.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: SALES DATA 30 SEP 2021 FOR RERA.pdf14 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE DA CLUB HOUSE 31 MARCH 2021.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE DREAM AAWAS 31 MARCH 2021.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE DA CLUB HOUSE 30 JUNE 2021.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE DREAM AAWAS 30 JUNE 2021.pdf13 Aug 2021
Form 2AFile: FORM 2A March 21.pdf13 Aug 2021
Form 2AFile: FORM 2A June 21.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: SALES DATA FOR RERA TILL 30 JUNE 2021.pdf13 Aug 2021
Form 2AFile: Form 2A.pdf18 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_2july 2020 Engineers Certificate of Quality.pdf18 Jun 2021
Disclosure of sold/ booked inventoryFile: Sales data for RERA .pdf18 Jun 2021
Form 2AFile: FORM 2A 30 SEP 2020.pdf27 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Dream Aawas FY 2018-19.pdf15 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Dream Aawas FY1920.pdf15 Feb 2021
Form 2AFile: Form 2A_4 may 2020 Engineers Certificate of Quality.pdf19 Dec 2020
Form 2AFile: Form 2A_2july 2020 Engineers Certificate of Quality.pdf19 Dec 2020
Form 2AFile: ENGINEER'S CERTIFICATE 31 DEC 2019.pdf16 Jan 2020
Form 2AFile: FORM-2A SEP 2019.pdf29 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: ANNUAL REPORT ON STATEMENT OF ACCOUNTS.pdf7 Sep 2019
Form 2AFile: RERA QUALITY FORM-2A JUNE 2019.pdf19 Jul 2019
Building plan approvalFile: REVISED SANCTIONED PLAN.pdf23 Apr 2019
Building Plan Approval (IOD)File: REVISED SANCTIONED PLAN.pdf23 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE 10-04-2019.pdf23 Apr 2019
Layout approvalFile: Layout Sanction.pdf21 Aug 2018
Building plan approvalFile: Final Sanction.pdf21 Aug 2018
PAN CardFile: KARAMCHAND REALTECH PRIVATE LIMITED Pan Card.pdf21 Aug 2018
PAN CardFile: NEERJA REALTORS PRIVATE LIMITED Pan card.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 1 - Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 2.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 3 - Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIF 4 - Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIF 6 - Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIF 5 - Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 7 - Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 8- Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 9- Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 10- Copy.pdf21 Aug 2018
Copy of the legal title reportFile: ADVOCATE TITLE VERIFICATION 11 - Copy.pdf21 Aug 2018

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DREAM AAWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza Shankarpur2,800+ in Nagpur

2 kmDREAM AAWASCompleted 14Lapsed / revoked 2Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: KARAMCHAND REALTECH PRIVATE LIMITED and NEERJA REALTORS PRIVATE LIMITED

KARAMCHAND REALTECH PRIVATE LIMITED and NEERJA REALTORS PRIVATE LIMITED has 1 registration on MahaRERA, including DREAM AAWAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if DREAM AAWAS is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DREAM AAWAS?

The registered promoter entity is KARAMCHAND REALTECH PRIVATE LIMITED and NEERJA REALTORS PRIVATE LIMITED, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DREAM AAWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DREAM AAWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DREAM AAWAS?

The professionals named in the filing: Architect: PRASHANT SATPUTE DESIGN CELL; Engineer: PRAKASH DHAWADE; Chartered Accountant: CA Abhinav Welekar Partner in APJ AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DREAM AAWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DREAM AAWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DREAM AAWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.