Home / Browse projects / DOSTI EASTERN BAY- PHASE 2

Completed No litigation declared Residential / Group Housing project

DOSTI EASTERN BAY- PHASE 2

By DOSTI REALTY LTD

RG-MH-30595 · RERA P51900030769 · Last updated on MahaRERA portal: 4 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: .
Sep 2027Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

DOSTI EASTERN BAY- PHASE 2 is a Residential / Group Housing project by DOSTI REALTY LTD in WADALA EAST, 400037, registered with MahaRERA as P51900030769 on 13 Sep 2021. The registration is recorded completed; possession was promised by 30 Sep 2027.

At a glance

Project

  • NameDOSTI EASTERN BAY- PHASE 2
  • TypeResidential / Group Housing
  • Location
    • VIDYALANKAR COLLEGE
    • WADALA EAST
    • 400037
  • Pincode400037
  • RERA no.P51900030769
  • ReraGenie IDRG-MH-30595

Builder

  • NameDOSTI REALTY LTD
  • Entity typeCompany
  • CINU70102MH2008PLC178101
  • GSTIN27AACCD7714K1ZH
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorDEEPAK KISHAN GORADIA
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects9 →

Key dates

this monthRegisteredSep 2021PromisedSep 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Sep 2021
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed119 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA490000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

WING C: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 4 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes85%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes75%
Open ParkingNoNot applicable
Society officeYes100%

Parking filed177

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots177
Closed/Covered177

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area435 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13249.58
Proposed, not sanctioned12,281 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR JEHANGIR BUILDING M G ROAD FORT MUMBAI 400001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
DOSTI REALTY LTD-

Litigation declared1

CaseCourtStatus
757/2019HIGH COURT OF BOMBAYPRE ADMISSION STAGE

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Jan 2025

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: DEB PH2 Form4.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Eastern Bay PH2 Architect certificate Form1.pdf16 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: DEB Form4.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Eastern Bay Phase-2 CA Certificate.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Eastern bay phase-2 Engineer certificate.pdf16 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Dosti Eastern bay PH2 OC 14Jan2025.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Dosti Eastern Bay Phase 2.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: DEB PH2.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEB PH2 Form1 Sep24.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEB PH2 Form3 Sep24.pdf13 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEB PH2 Form2 Sep24.pdf13 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DEB Phase-2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 1-2 Dosti eastern Bay PH2.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Eastern Bay Phase 2.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEB PH2 Form 2 Engg cert June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEB PH2 Form 3 CA cert June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Dosti Eastern Bay Phase-2.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DEB Phase 2 Dosti Wave.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Dosti Eastern bay Phase-2 Engineer Certificate.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Eastern Bay Phase 2.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Dosti Eastern bay Phase-2.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Dosti Wave.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024 01 04_Form 1 - Architect's Certificate_DEB_Phase 2.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DEB -PH-II.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DEB Phase 2.pdf16 Jan 2024
Building plan approvalFile: 0953 Amendletter_signed.pdf12 Jan 2024
Layout approvalFile: SHEET NO 8 Podium 3.pdf12 Jan 2024
Layout approvalFile: SHEET NO 9 Podium 4.pdf12 Jan 2024
Layout approvalFile: SHEET NO 1 Layout Plan.pdf12 Jan 2024
Layout approvalFile: SHEET NO 2 Ground Floor Plan.pdf12 Jan 2024
Layout approvalFile: SHEET NO 6 Podium 1.pdf12 Jan 2024
Layout approvalFile: SHEET NO 7 Podium 2.pdf12 Jan 2024
Layout approvalFile: SHEET NO 10 Podium 5.pdf12 Jan 2024
Layout approvalFile: SHEET NO 11 Club house upper level plan.pdf12 Jan 2024
Layout approvalFile: SHEET NO 23 Wing-C floor plan 1.pdf12 Jan 2024
Layout approvalFile: SHEET NO 24 Wing-C floor plan 2.pdf12 Jan 2024
Layout approvalFile: SHEET NO 25 Wing-C floor plan 3.pdf12 Jan 2024
Layout approvalFile: SHEET NO 26 Wing-C floor plan 4.pdf12 Jan 2024
Layout approvalFile: SHEET NO 27 Wing-C floor plan 5.pdf12 Jan 2024
Layout approvalFile: SHEET NO 28 Wing-C floor plan 6.pdf12 Jan 2024
Layout approvalFile: SHEET NO 45B Section B-B.pdf12 Jan 2024
Layout approvalFile: SHEET NO 46 SectionA-A.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 1 Layout Plan.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 2 Ground Floor Plan.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 6 Podium 1.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 7 Podium 2.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 8 Podium 3.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 9 Podium 4.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 10 Podium 5.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 11 Club house upper level plan.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 23 Wing-C floor plan 1.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 24 Wing-C floor plan 2.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 25 Wing-C floor plan 3.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 26 Wing-C floor plan 4.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 27 Wing-C floor plan 5.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 28 Wing-C floor plan 6.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 45B Section B-B.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 46 SectionA-A.pdf12 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 0953 Amendletter_signed.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 0953 Amendletter_signed.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2387182_FurtherCC_signed.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024 01 04_Form 1 - Architect's Certificate_DEB_Phase 2.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5-DEB-PH-II.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Form-DEB-PH-II.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Form-3-DEB-PH-II.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEB-CA-Form-3-160823.pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: Dosti Eastern Bay Phase 2 Wave.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Eastern Bay Phase 2.pdf11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEB PH2 ARCH_compressed.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEB PH2 ENG_compressed.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEB PH2 ENG_compressed.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DEB Phase 2.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Wave 1.pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Dosti Eastern Bay Phase 2.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Dosti Eastern Bay-Phase 2 - Sold-Unsold Disclosure.pdf16 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dosti eastern Bay Ph2 March 2023_compressed.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Dosti Eastern Bay Phase 2 March 2023_compressed.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate - DEB Ph 2.pdf11 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Eastern Bay Ph2 Dec 2022.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Eastern Bay Phase 2 Dec 2022.pdf6 Feb 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DOSTI IMPERIA COMPLEXDOSTI IMPERIA KEWDA CIRCLE MARG OPP R MALL GHODBUNDER ROAD MANPADA THANE WEST 400610780CompletedJun 2017Late, Dec 2018
DOSTI AMBROSIADOSTI AMBROSIA DOSTI ACRES UPHILL LINK ROAD NEW WADALA EAST MUMBAI 400037256CompletedSep 2013Late, Apr 2016

Keep DOSTI EASTERN BAY- PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADALA EAST

Builder: DOSTI REALTY LTD

DOSTI REALTY LTD has 4 registrations on MahaRERA, including Dosti Imperia - Dosti Majesta and DOSTI EASTERN BAY - PHASE 1. Its filings disclose 9 earlier MahaRERA projects: declares 0 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if DOSTI EASTERN BAY- PHASE 2 is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI EASTERN BAY- PHASE 2?

The registered promoter entity is DOSTI REALTY LTD, a company as per the filing. Its CIN U70102MH2008PLC178101 and GSTIN 27AACCD7714K1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI EASTERN BAY- PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DOSTI EASTERN BAY- PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in DOSTI EASTERN BAY- PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI EASTERN BAY- PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI EASTERN BAY- PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.