Home / Browse projects / DOSTI EASTERN BAY - PHASE 1

Completed Litigation declared Residential / Group Housing project

DOSTI EASTERN BAY - PHASE 1

By DOSTI REALTY LTD

RG-MH-28255 · RERA P51900025142 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2028Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 99%
1Complaints at MahaRERAon this registration
Jump to the 149 documents Report an error

DOSTI EASTERN BAY - PHASE 1 is a Residential / Group Housing project by DOSTI REALTY LTD in WADALA EAST, 400037, registered with MahaRERA as P51900025142 on 19 Mar 2020. The registration is recorded completed; possession was promised by 30 Mar 2028. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDOSTI EASTERN BAY - PHASE 1
  • TypeResidential / Group Housing
  • Location
    • VIDYALANKAR COLLEGE ROAD
    • WADALA EAST
    • 400037
  • Pincode400037
  • RERA no.P51900025142
  • ReraGenie IDRG-MH-28255

Builder

  • NameDOSTI REALTY LTD
  • Entity typeCompany
  • CINU70102MH2008PLC178101
  • GSTIN27AACCD7714K1ZH
  • Managing DirectorDEEPAK KISHAN GORADIA
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects9 →

Key dates

this monthRegisteredMar 2020PromisedMar 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Mar 2020
  • Promised completion30 Mar 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed149 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA490000
WING BNA490000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.

WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities20

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes85%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes97%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes0%
TODDLERS POOL WITH DECK BBQ GARDEN WITH LOOKOUT DECK OPEN AIR JACUZZIYes0%
OUTDOOR CHILDREN PLAY AREA SENIOR CITIZEN AREA JOGGING TRACK MULTIPURPOSE LAWN SUNNING LAWNYes0%
OUTDOOR CHESS LAWN FITNESS AND AEROBICS DECK LAP POOL WITH DECK CHILDREN POOL WITH DECKYes0%
OUTDOOR BOX CRICKET TENNIS COURT FOOTBALL PITCHYes0%
INDOOR SQUASH COURT TABLE TENNIS CAROM CHESS BANQUET HALL WITH OUTDOOR DINNING SPA GYMYes0%

Parking filed623

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots623
Closed/Covered592
Open Space31
BuildingClosed/CoveredOpen SpaceTotal
WING A32417341
WING B26814282

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,088 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI50454.0
Proposed, not sanctioned47,304 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch GROUND FLOOR , JEHANGIR BUILDING , M G ROAD, FORT, MUMBAI 400001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
DOSTI REALTY LTD-

Litigation declared1

CaseCourtStatus
757/2019HIGH COURT OF BOMBAYOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400278ganesh ramchandra patilDOSTI REALTY LTD30/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Nov 2024

Documents filed149

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form4 Dosti Eastern bay Ph1.pdf27 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form4 Dosti Eastern bay Ph1.pdf21 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DEB PHASE-1 OC.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: DEB PH1.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEB PH1 Form1 Sep24.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEB PH1 Form3 Sep24.pdf13 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEB PH1 Form2 Sep24.pdf13 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DEB Phase-1.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 1-1 Dosti eastern Bay PH1.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Eastern Bay Phase 1.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEB PH1 Form 2 Engg cert June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEB PH1 Form 3 CA cert June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Dosti eastern Bay Phase-1_1.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: Dosti Eastern Bay Phase-1.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DEB Dosti Marina Phase 1.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Dosti Eastern bay Phase-1.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Dosti Marina Oceania.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DEB -PH I.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DEB Phase 1.pdf16 Jan 2024
Layout approvalFile: SHEET NO 1 Layout Plan.pdf12 Jan 2024
Layout approvalFile: SHEET NO 2 Ground Floor Plan.pdf12 Jan 2024
Layout approvalFile: SHEET NO 6 Podium 1.pdf12 Jan 2024
Layout approvalFile: SHEET NO 7 Podium 2.pdf12 Jan 2024
Layout approvalFile: SHEET NO 8 Podium 3.pdf12 Jan 2024
Layout approvalFile: SHEET NO 9 Podium 4.pdf12 Jan 2024
Layout approvalFile: SHEET NO 10 Podium 5.pdf12 Jan 2024
Layout approvalFile: SHEET NO 11 Club house upper level plan.pdf12 Jan 2024
Layout approvalFile: SHEET NO 12 Wing-A floor plan 1.pdf12 Jan 2024
Layout approvalFile: SHEET NO 13 Wing-A floor plan 2.pdf12 Jan 2024
Layout approvalFile: SHEET NO 14 Wing-A floor plan 3.pdf12 Jan 2024
Layout approvalFile: SHEET NO 15 Wing-A floor plan 4.pdf12 Jan 2024
Layout approvalFile: SHEET NO 16 Wing-A floor plan 5.pdf12 Jan 2024
Layout approvalFile: SHEET NO 17 Wing-B floor plan 1.pdf12 Jan 2024
Layout approvalFile: SHEET NO 18 Wing-B floor plan 2.pdf12 Jan 2024
Layout approvalFile: SHEET NO 19 Wing-B floor plan 3.pdf12 Jan 2024
Layout approvalFile: SHEET NO 20 Wing-B floor plan 4.pdf12 Jan 2024
Layout approvalFile: SHEET NO 21 Wing-B floor plan 5.pdf12 Jan 2024
Layout approvalFile: SHEET NO 22 Wing-B floor plan 6.pdf12 Jan 2024
Layout approvalFile: SHEET NO 45B Section B-B.pdf12 Jan 2024
Layout approvalFile: SHEET NO 46 SectionA-A.pdf12 Jan 2024
Building plan approvalFile: 0953 Amendletter_signed.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 1 Layout Plan.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 2 Ground Floor Plan.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 6 Podium 1.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 7 Podium 2.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 8 Podium 3.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 9 Podium 4.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 10 Podium 5.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 11 Club house upper level plan.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 12 Wing-A floor plan 1.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 13 Wing-A floor plan 2.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 14 Wing-A floor plan 3.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 15 Wing-A floor plan 4.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 16 Wing-A floor plan 5.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 17 Wing-B floor plan 1.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 18 Wing-B floor plan 2.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 19 Wing-B floor plan 3.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 20 Wing-B floor plan 4.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 21 Wing-B floor plan 5.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 22 Wing-B floor plan 6.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 45B Section B-B.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 46 SectionA-A.pdf12 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 0953 Amendletter_signed.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 0953 Amendletter_signed.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2387182_FurtherCC_signed.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024 01 04_Form 1 - Architect's Certificate_DEB_Phase 1.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 -DEB-PH-1.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Form-DEB-PH-I.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Form-3-DEB-PH-I.pdf13 Dec 2023
Disclosure of sold/ booked inventoryFile: DEB- Phase1Marina,Oceania.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Eastern Bay Phase 1.pdf11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEB PH1 ARCH_compressed.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEB PH1 ENG_compressed.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEB PH1 CA_compressed.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DEB Phase 1.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Marina.pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Dosti Eastern Bay Phase 1.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Dosti Eastern Bay - Phase 1 - Sold-Unsold Disclosure.pdf16 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dosti eastern Bay Ph1 March 2023_compressed.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Eastern Bay Phase 1 March 2023_compressed.pdf14 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DOSTI IMPERIA COMPLEXDOSTI IMPERIA KEWDA CIRCLE MARG OPP R MALL GHODBUNDER ROAD MANPADA THANE WEST 400610780CompletedJun 2017Late, Dec 2018
DOSTI AMBROSIADOSTI AMBROSIA DOSTI ACRES UPHILL LINK ROAD NEW WADALA EAST MUMBAI 400037256CompletedSep 2013Late, Apr 2016

Keep DOSTI EASTERN BAY - PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADALA EAST

Builder: DOSTI REALTY LTD

DOSTI REALTY LTD has 4 registrations on MahaRERA, including Dosti Imperia - Dosti Majesta and DOSTI EASTERN BAY - PHASE 1. Its filings disclose 9 earlier MahaRERA projects: declares 0 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if DOSTI EASTERN BAY - PHASE 1 is delayed beyond 30 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI EASTERN BAY - PHASE 1?

The registered promoter entity is DOSTI REALTY LTD, a company as per the filing. Its CIN U70102MH2008PLC178101 and GSTIN 27AACCD7714K1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI EASTERN BAY - PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DOSTI EASTERN BAY - PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DOSTI EASTERN BAY - PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in DOSTI EASTERN BAY - PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI EASTERN BAY - PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI EASTERN BAY - PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.