Home / Browse projects / Mumbai Suburban, Maharashtra / Dollars Avenue CHSL

Registered No litigation declared Others project

Dollars Avenue CHSL

By M/S HIRANI REALTORS

RG-MH-18275 · RERA P51800076786 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 85%
44 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Dollars Avenue CHSL is a Others project by M/S HIRANI REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076786 on 28 Jun 2024. Possession is promised by 2 Nov 2027. 3 of the 47 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameDollars Avenue CHSL
  • TypeOthers
  • Location
    • Shimpoli Road
    • Borivali West
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800076786
  • ReraGenie IDRG-MH-18275

Builder

  • NameM/S HIRANI REALTORS
  • Entity typePartnership
  • GSTIN27AAFFH2508B1ZX
  • PartnersHASMUKH RAJMAL HIRANI, HASMUKH DEVICHAND SHAH
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2024PromisedNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion2 Nov 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

6%3 of 47 units booked
25.0%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dollars Avenue CHSLNA1212331447

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 85%.

Dollars Avenue CHSL: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area877 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024
LandownerVillageDistrict
Dollars Avenue CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2830.97
Proposed, not sanctioned2,831 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSodawala Lane, Near Prabhodan Thackeray Natyagraha, Borivali West, Mumbai-400092
Estimated costRs 19.00 cr
Cost incurredRs 4.75 cr
Work done25.0%
BuildingWingEstimatedIncurred
Dollars Avenue CHSLNARs 18.60 crRs 4.75 cr
-NARs 40.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL S JAIN
EngineerMr Rajkumar Bhonde
Chartered AccountantSHRADHA MEHTA & ASSOCIATES
Chartered AccountantPOONAM RATAN MURARKA
PartnerRole in project
M/S HIRANI REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 2 Nov 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate_Dollar.pdf27 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf27 Apr 2026
Withdrawal Update Form 3File: CA Certificate_Dollar.pdf27 Apr 2026
Withdrawal Update Form 1File: Dollars Avenue Final Form 1 sign.pdf23 Jan 2026
Withdrawal Update Form 2File: Dollars Avenue Final Form 2 sign.pdf23 Jan 2026
Withdrawal Update Form 3File: Dollars Avenue Final Form 3 sign.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 15-10-2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 14-10-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 15-10-2025.pdf18 Oct 2025
Form 1File: ARCHITECT CERTIFICATE.pdf30 Aug 2025
Form 2File: ENGINEER CERTIFICATE.pdf30 Aug 2025
Form 3File: CA CERTIFICATE.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-12-2024 - DOLLAR CHSL.pdf30 Aug 2025
Form 1File: ARCHITECT CERTIFICATE.pdf30 Aug 2025
Form 2File: ENGINEER CERTIFICATE.pdf30 Aug 2025
Form 3File: CA CERTIFICATE AS ON 30-09-2024 DOLLARS AVENUE CHSL (2).pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclouser Of Dollars Avenue CHSL 30-09-2024.pdf30 Aug 2025
Form 1File: ARCHITECT CERTIFICATE FORM 1.pdf30 Aug 2025
Form 2File: ENGINEER CERTIFICATE.pdf30 Aug 2025
Form 3File: CA CERTIFICATE AS ON 30-6-2024.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD 30062024.pdf30 Aug 2025
Form 5 (FY 2024-2025)File: Hirani Realtors Form 5 Dollars Avenue.pdf30 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf27 May 2025
Form 2File: ENGINEER CERTIFICATE.pdf27 May 2025
Form 3File: CA CERTIFICATE.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-03-2025 DOLLARS CHSL.pdf27 May 2025
OthersFile: Quality Assurance Certirficate_31-03-2025.pdf27 May 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FORM 1.pdf27 May 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf27 May 2025
Withdrawal Update Form 3File: CA CERTIFICATE AS ON 30-6-2024.pdf27 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certirficate_31-03-2024[1].pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-03-2025 DOLLARS CHSL.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-12-2024 - DOLLAR CHSL.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AS ON 30-09-2024 DOLLARS AVENUE CHSL (2).pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Disclouser Of Dollars Avenue CHSL 30-09-2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD 30062024.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AS ON 30-6-2024.pdf17 Jul 2024
Copy of the legal title reportFile: TITTLE REPORT.pdf12 Jun 2024
Other - TechnicalFile: ANNEXURE A DECLARATION CUM UNDERTAKING.pdf12 Jun 2024
Details of encumbrances concerned to FinanceFile: DETAILS OF ENCUMBERANCE CONCERN TO FINANCE.pdf10 Jun 2024
Details of encumbrances concerned to LegalFile: DETAILS OF ENCUMBERANCE CONCERN TO FINANCE.pdf10 Jun 2024
Declaration about Commencement CertificateFile: DECLERATION ABOUT COMMENCEMNT CERTIFICATE.pdf10 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf10 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_200309443322_For_Asset_Based_Search_06_06_2024_11_03_04_794.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf4 Jun 2024
Deviation Report with respect to Allotment letterFile: NO DEVATION IN ALLOTMENT LETTER.pdf4 Jun 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AGREEMENT FOR SALE.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf3 Jun 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE.pdf31 May 2024
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER.pdf22 May 2024
Details of encumbrances concerned to FinanceFile: DETAILS OF ENCUMBERANCE CONCERN TO LEGAL.pdf21 May 2024
Details of encumbrances concerned to LegalFile: DETAILS OF ENCUMBERANCE CONCERN TO LEGAL.pdf21 May 2024
Declaration in FORM BFile: Form B Affidavid Cum Declaration.pdf11 May 2024
Layout approvalFile: Block and Location Plan.pdf10 May 2024
Building plan approvalFile: Drawing iod (2).pdf10 May 2024
PAN CardFile: Hirani Realtors PAN Card.pdf10 May 2024
Copy of Layout Approval (in case of layout)File: Block and Location Plan.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing iod (2).pdf10 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC.pdf10 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf10 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Separate Bank Account.pdf10 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BANK OF INDIA EMPLOYEES SUKHADA CHSLPLOT NO 316 EKSAR RAM MANDIR ROAD BORIWALI WEST MUMBAI 40009160OngoingJun 2026Jun 2026

How this compares with Mumbai Suburban

6%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dollars Avenue CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali West6,700+ in Mumbai Suburban

2 kmDollars Avenue CHSLCompleted 159Lapsed / revoked 92Other 217Dot size: filed unitsN

Filed coordinates, straight-line distance. 468 registered projects within 2 km.

Builder: M/S HIRANI REALTORS

M/S HIRANI REALTORS has 2 registrations on MahaRERA, including BANK OF INDIA EMPLOYEES SUKHADA CHSL and Dollars Avenue CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Dollars Avenue CHSL is delayed beyond 2 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dollars Avenue CHSL?

The registered promoter entity is M/S HIRANI REALTORS, a partnership as per the filing. Its GSTIN 27AAFFH2508B1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dollars Avenue CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dollars Avenue CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dollars Avenue CHSL?

The professionals named in the filing: Architect: SUNIL S JAIN; Engineer: Mr Rajkumar Bhonde; Chartered Accountant: SHRADHA MEHTA & ASSOCIATES; Chartered Accountant: POONAM RATAN MURARKA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dollars Avenue CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dollars Avenue CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dollars Avenue CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.