Home / Browse projects / Pune, Maharashtra / DNYANADA CITY AND DNYANADA COMMERCIAL CENTER

Registered No litigation declared Others project

DNYANADA CITY AND DNYANADA COMMERCIAL CENTER

By BHAGWAN NARAYAN POKHARKAR

RG-MH-24926 · RERA P52100009874 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
33 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

DNYANADA CITY AND DNYANADA COMMERCIAL CENTER is a Others project by BHAGWAN NARAYAN POKHARKAR in Pune, Maharashtra, registered with MahaRERA as P52100009874 on 22 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing.

At a glance

Project

  • NameDNYANADA CITY AND DNYANADA COMMERCIAL CENTER
  • TypeOthers
  • Location
    • CHAKAN SHIKRAPUR ROAD
    • CHAKAN
    • Chakan (CT)
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100009874
  • ReraGenie IDRG-MH-24926

Builder

  • NameBHAGWAN NARAYAN POKHARKAR
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
  • Buildings5 building records
  • Documents filed122 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA100000
E WINGNA90000
COMMERCIAL WINGNA60000
WING BNA100000
WING CNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 95%.

A WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
E WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
COMMERCIAL WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
WING B67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
WING C37%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes40%
Street LightingYes50%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes80%
TEMPLEYes100%

Parking filed300

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots300
Closed/Covered158
Open Space142
BuildingClosed/CoveredOpen SpaceTotal
A WING323668
E WING323668
COMMERCIAL WING6370133
WING B101
WING C30030

Land and ownership10

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area25,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
LandownerVillageDistrict
MR GULAB DAGDU JADHAVChakan (CT)Pune
ANURADHA JADHAVChakan (CT)Pune
AKASH BALU JADHAVChakan (CT)Pune
GORAKH RAM JADHAVChakan (CT)Pune
KERU NAMDEV JADHAVChakan (CT)Pune
BALASAHEB GAVATEChakan (CT)Pune
LAXMAN SOPAN GAVATEChakan (CT)Pune
DATTATRAY RAM JADHAVChakan (CT)Pune
SHANABAI RAM JADHAVChakan (CT)Pune
AVINASH RAM JADHAVChakan (CT)Pune

Approvals and building plan

Permissible FSI41024.0
Proposed, not sanctioned30,979 sq m
Buildings approved6
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchON SHIKRAPUR ROAD CHAKAN TAL KHED DIST PUNE 410501

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWALHEKAR & ASSOCIATES
EngineerAVINASH PANDHARI KOLEWAD
EngineerMAYUR BADSHAHA GODASE
Chartered AccountantSUNSVG & ASSOCIATES
Chartered AccountantREET ANAND MEGHRAJANI
PartnerRole in project
BHAGWAN NARAYAN POKHARKAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018020Dec 2023 → Dec 2027

Reason as filed by the promoterWE HAVE GOTTEN REVISED CC AND BUILDING PLAN PERMISSION ON 07/02/2023 IN WHICH 3 MORE BUILDINGS ARE INCLUDED (AFFIDAVIT ATTACHED). NEED MORE TIME TO COMPLETE OHER 3 BUILDINGS.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Nov 2023

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form_1.pdf28 Apr 2026
Form 2File: form_2__2_.pdf28 Apr 2026
Form 3File: form_3__3__compressed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold_unsold__3__compressed.pdf28 Apr 2026
Form 1File: form 1 (1).pdf23 Jan 2026
Form 2File: form 2 (1).pdf23 Jan 2026
Form 3File: form 3 (1) (1)_compressed.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold unsold_compressed.pdf23 Jan 2026
Form 1File: FORM_1.pdf15 Oct 2025
Form 2File: form_2.pdf15 Oct 2025
Form 3File: Form-3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold_unsold_10_oct_2025_compressed.pdf15 Oct 2025
Form 1File: FORM 1 DNYANADA.pdf6 Aug 2025
Form 2File: form 2 DNYANADA.pdf6 Aug 2025
Form 3File: form 3 DNYANADA.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: DNYANADA SOL UNSOLD_compressed.pdf6 Aug 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf18 Apr 2025
Certificates of CA (Form 3)File: FORM 3.pdf18 Apr 2025
Certificates of CA (Form 3)File: FORM 3.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 1.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf16 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf16 Jan 2025
Certificates of CA (Form 3)File: FORM 3.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD A WING.pdf4 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD B WING.pdf4 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD C WING.pdf4 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD E WING.pdf4 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD COMMERCIAL_compressed.pdf4 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf16 Jul 2024
Certificates of CA (Form 3)File: FORM 3.pdf16 Jul 2024
Certificates of CA (Form 3)File: FORM 3_compressed (2).pdf26 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf3 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf3 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Adobe Scan Mar 28, 2024.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD B WING.pdf23 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD C WING.pdf23 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DOC-20230503-WA0028.pdf23 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21 22.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22 23.pdf12 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf10 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 5 FY 19 20.pdf10 Oct 2023
Certificates of CA (Form 5)File: FORM 5 FY 17 18.pdf10 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 FY 18 19.pdf10 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY 19 20.pdf10 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dnyanada city.pdf13 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2021 2022.pdf13 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022 2023.pdf13 Aug 2023
Disclosure of sold/ booked inventoryFile: A WING SOLD INVENTORY.pdf13 Aug 2023
Disclosure of sold/ booked inventoryFile: E WING SOLD INVENTORY.pdf13 Aug 2023
Disclosure of sold/ booked inventoryFile: COMMERCIAL SOLD INVENTORY.pdf13 Aug 2023
Certificates of CA (Form 3)File: form 3_compressed.pdf13 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021.pdf13 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 23.pdf13 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dnyanada city.pdf2 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2122.pdf2 May 2023
Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf2 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser if intrest in other real estate organisations.pdf2 Mar 2023
Deviation Report with respect to Allotment letterFile: deviation letter.pdf2 Mar 2023
Deviation Report with respect to model copy of AgreementFile: deviation letter.pdf2 Mar 2023
Building plan approvalFile: PLAN 1.pdf17 Feb 2023
Building plan approvalFile: PLAN 2.pdf17 Feb 2023
Building plan approvalFile: PLAN 3.pdf17 Feb 2023
Building plan approvalFile: PLAN 4.pdf17 Feb 2023
Building plan approvalFile: PLAN 5.pdf17 Feb 2023
Building plan approvalFile: PLAN 6.pdf17 Feb 2023
Building plan approvalFile: PLAN 7.pdf17 Feb 2023
Building plan approvalFile: PLAN 8.pdf17 Feb 2023
Building plan approvalFile: PLAN 9.pdf17 Feb 2023
Building plan approvalFile: PLAN 10.pdf17 Feb 2023
Building plan approvalFile: PLAN 11.pdf17 Feb 2023
Building plan approvalFile: PLAN 12.pdf17 Feb 2023
Building plan approvalFile: PLAN 13.pdf17 Feb 2023
Building plan approvalFile: PLAN 14.pdf17 Feb 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DNYANADA CITY AND DNYANADA COMMERCIAL CENTER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAKAN13,700+ in Pune

2 kmDNYANADA CITY AND DNYANACompleted 18Lapsed / revoked 23Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 72 registered projects within 2 km.

Builder: BHAGWAN NARAYAN POKHARKAR

BHAGWAN NARAYAN POKHARKAR has 1 registration on MahaRERA, including DNYANADA CITY AND DNYANADA COMMERCIAL CENTER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DNYANADA CITY AND DNYANADA COMMERCIAL CENTER is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DNYANADA CITY AND DNYANADA COMMERCIAL CENTER?

The registered promoter entity is BHAGWAN NARAYAN POKHARKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DNYANADA CITY AND DNYANADA COMMERCIAL CENTER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DNYANADA CITY AND DNYANADA COMMERCIAL CENTER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DNYANADA CITY AND DNYANADA COMMERCIAL CENTER?

The professionals named in the filing: Architect: WALHEKAR & ASSOCIATES; Engineer: AVINASH PANDHARI KOLEWAD; Engineer: MAYUR BADSHAHA GODASE; Chartered Accountant: SUNSVG & ASSOCIATES; Chartered Accountant: REET ANAND MEGHRAJANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DNYANADA CITY AND DNYANADA COMMERCIAL CENTER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DNYANADA CITY AND DNYANADA COMMERCIAL CENTER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DNYANADA CITY AND DNYANADA COMMERCIAL CENTER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.