Home / Browse projects / Mumbai Suburban, Maharashtra / DJ AMORE2

Completed No litigation declared Residential / Group Housing project

DJ AMORE2

RG-MH-66268 · RERA P51800048275 · Last updated on MahaRERA portal: 19 Mar 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 72%
16 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

DJ AMORE2 is a Residential / Group Housing project by Promoter name not stated in filing in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048275 on 22 Dec 2022. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 11 months from the original filing. 6 of the 22 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameDJ AMORE2
  • TypeResidential / Group Housing
  • Location
    • PLOT NO. 19A/19B COLLECTOR COLONY CHEMBUR
    • MUMBAI
    • Kurla
    • Mumbai Suburban
    • 400074
  • Pincode400074
  • RERA no.P51800048275
  • ReraGenie IDRG-MH-66268

Builder

  • NamePromoter name not stated in filing

Key dates

this monthRegisteredDec 2022First promiseApr 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Dec 2022
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 1 Apr 2025)
  • Buildings1 building record
  • Documents filed68 files

Current status

27%6 of 22 units booked

Figures as on 19 Mar 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DJ AMORE2NA9822022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 72%.

DJ AMORE2: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure72%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area429 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
JEETU MOTWANIMumbai CityMumbai City
PRASHANT MAHADEV SHIVGANMumbai CityMumbai City
SURESH RAGHUMAL ASRANIMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI1716.0
Proposed, not sanctioned1,158 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI KURLA MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerNexus Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
DHIRAJ narayandas JADHWANI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027911Apr 2025 → Mar 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-03-2026. to complete the project and fulfil all regulatory requirements.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Affidavit Cum Declaration.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31-12-2024.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31-12-2024.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate As Dec 31-12-24.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -31-12-2024_11zon.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: Circular 29 .pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: Circular 29 .pdf19 Mar 2025
Declaration about Commencement CertificateFile: Form D.pdf19 Mar 2025
Other - TechnicalFile: Pert.pdf19 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (3).pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Supervisor Certificate 22-23.pdf19 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Supervisor Certificate 23-24.pdf19 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf19 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 DJ Amore 2 for FY 2023-24.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 30-06-2024.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 30-09-2024.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 31-12-2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on June 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on Sep 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on Dec 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate on Project Fund withdrawal (Form 3).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on March 2024.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 31-03-2024.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 31-03-2024.pdf24 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - DJ AMORE2.pdf8 Mar 2024
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on Sept 2023.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 30-09-2023.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 (ARCHITECT)-31-12-22.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 (ARCHITECT)-31-03-23.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 (ARCHITECT)-30-06-23.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 (ARCHITECT)-30-09-23.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on 31-12-2022.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on 31-03-2023.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Amore2 as on 30-06-2023.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 31-12-2022.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 31-03-2023.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Amore2 as on 30-06-2023.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- DJ Ammore 2 as on 2022-23.pdf30 Sep 2023
Proforma of Agreement for saleFile: Agreement for Sale DJ Amore 2 AU.pdf19 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance DJ Amore 2.pdf17 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrance DJ Amore 2.pdf17 Jan 2023
Other - LegalFile: AL_10122022.pdf10 Dec 2022
Other - LegalFile: Deviation Report AL.pdf10 Dec 2022
Layout approvalFile: Highlighted Plan Layout- DJ Amore2.pdf16 Nov 2022
Copy of Layout Approval (in case of layout)File: Highlighted Plan Layout- DJ Amore2.pdf16 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dj Amore 2 Form 3- Stamped and Signed.pdf16 Nov 2022
Building plan approvalFile: Highlighted Plan Layout- DJ Amore2.pdf17 Oct 2022
Copy of the legal title reportFile: 19A- 19B Title Report-1.pdf17 Oct 2022
Details of encumbrances concerned to FinanceFile: Declaration for finance Encumbrance.pdf17 Oct 2022
Details of encumbrances concerned to LegalFile: Declaration of Legal Encumbrances.pdf17 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Highlighted Plan Layout- DJ Amore2.pdf17 Oct 2022
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf17 Oct 2022
Declaration in FORM BFile: Form B Developer.pdf17 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200254461872_For_Asset_Based_Search_10_12_2022_18_40_16_060.pdf17 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation format Alotment Letter certificate.pdf17 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf17 Oct 2022
Proforma of Agreement for saleFile: AFS Final_10122022.pdf7 Sep 2022
Proforma of Allotment letterFile: DJ Amore 2 Allotment letter.pdf7 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-new.pdf7 Sep 2022
PAN CardFile: pan card.pdf30 May 2022
Commencement Certificates / NA Order for plotted developmentFile: 2326307_FirstCC_signed.pdf30 May 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
JB SHINEplot no 21a collector colony15CompletedNov 2016Late, Nov 2019

How this compares with Mumbai Suburban

27%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 11 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DJ AMORE2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI6,700+ in Mumbai Suburban

Builder: Promoter name not stated in filing

The filing does not name a promoter organisation for this registration. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if DJ AMORE2 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DJ AMORE2?

The registered promoter entity is Promoter name not stated in filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DJ AMORE2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DJ AMORE2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DJ AMORE2?

The professionals named in the filing: Engineer: Nexus Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DJ AMORE2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DJ AMORE2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DJ AMORE2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.