Home / Browse projects / Pune, Maharashtra / DIVINE NEST

Registration lapsed No litigation declared Others project

DIVINE NEST

By Divine Dynasty Group

RG-MH-04944 · RERA P52100020871 · Last updated on MahaRERA portal: 29 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 17 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

DIVINE NEST is a Others project by Divine Dynasty Group in Pune, Maharashtra, registered with MahaRERA as P52100020871 on 15 May 2019. Possession was promised by 7 May 2025 and is now 17 months past that date.

At a glance

Project

  • NameDIVINE NEST
  • TypeOthers
  • Location
    • Parandwal chowk
    • Malinagar
    • Haveli
    • Pune
    • 413108
  • Pincode413108
  • RERA no.P52100020871
  • ReraGenie IDRG-MH-04944

Builder

  • NameDivine Dynasty Group
  • Entity typePartnership
  • PartnersVINAYAK DATTATARY DARSHALE, ROHAN DEVENDRA BORAWAKE, ASHA PRAKASH KEDARI

Key dates

17 months past promisethis monthRegisteredMay 2019PromisedMay 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 May 2019
  • Promised completion7 May 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA120000
BNA120000
CNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed332

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots332
Open Space332
BuildingOpen SpaceTotal
A166166
B166166

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,016 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Diwan ParandwalMalinagarPune
Pradeep ParandwalMalinagarPune
Dnyandev BhoiteTalavadePune
Ganpati sutarChikhali Bk.Pune

Approvals and building plan

Permissible FSI8104.22
Proposed, not sanctioned7,979 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAundh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Gavali
EngineerSHAILESH BABGONDA PATIL
Chartered AccountantMRUDULA SANJAY JOSHI
Chartered AccountantJOSHI AND RAYKAR CHARTERED ACCOUNTANTS
PartnerRole in project
Divine Dynasty Group-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Nov 2021

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Jan 2024 Form 2A.pdf29 Mar 2025
Certificates of CA (Form 3)File: Form 3_compressed.pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A march-202320230417_13232214.pdf17 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Signed.pdf17 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf3 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf31 Dec 2021
Building plan approvalFile: Revised Plan 04.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 05.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 06.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 07.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 06.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 08.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 09.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 03.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 01.pdf1 Nov 2021
Building plan approvalFile: Revised Plan 02.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 01.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 02.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 03.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 04.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 05.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 06.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 07.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 06.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 08.pdf1 Nov 2021
Building Plan Approval (IOD)File: Revised Plan 09.pdf1 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate.pdf1 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf1 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Dec 2019.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2020.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: June 2020.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sept 2020.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dec 2020.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2021.pdf1 Nov 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf1 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Comercial completion certificate.pdf1 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf31 Dec 2020
Building plan approvalFile: plan scan 3-F2.pdf7 May 2019
Building plan approvalFile: plan scan 4-F2.pdf7 May 2019
Building plan approvalFile: plan scan 5-F2.pdf7 May 2019
Building plan approvalFile: plan scan 6-F2.pdf7 May 2019
Building plan approvalFile: plan scan 7-F2.pdf7 May 2019
Building plan approvalFile: plan scan 8-F2.pdf7 May 2019
Layout approvalFile: plan scan 1-F2.pdf7 May 2019
Layout approvalFile: plan scan 2-F2.pdf7 May 2019
PAN CardFile: PAN of Firm.pdf7 May 2019
Copy of the legal title reportFile: STR-Malinagar-Dehu-Sno-150-Divine Dynasty Group-F2.pdf7 May 2019
Details of encumbrancesFile: Details of encumbrances.pdf7 May 2019
Copy of Layout Approval (in case of layout)File: plan scan 1-F2.pdf7 May 2019
Copy of Layout Approval (in case of layout)File: plan scan 2-F2.pdf7 May 2019
Building Plan Approval (IOD)File: plan scan 3-F2.pdf7 May 2019
Building Plan Approval (IOD)File: plan scan 4-F2.pdf7 May 2019
Building Plan Approval (IOD)File: plan scan 5-F2.pdf7 May 2019
Building Plan Approval (IOD)File: plan scan 6-F2.pdf7 May 2019
Building Plan Approval (IOD)File: plan scan 7-F2.pdf7 May 2019
Building Plan Approval (IOD)File: plan scan 8-F2.pdf7 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 May 2019
Declaration in FORM BFile: Form B- Partners.pdf7 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 1MB.pdf7 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate (2).pdf7 May 2019
Certificates of CA (Form 3)File: Form 3.pdf7 May 2019
Proforma of Allotment letterFile: Allottee Letter-RERA-Pilot-Malinagar, Dehu-Sno-150-Divine Nest.pdf7 May 2019
Proforma of Allotment letterFile: ATS-RERA-Pilot-Punawale-CTS-491-Shivram Heights-MARERA.pdf7 May 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DIVINE NEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malinagar13,700+ in Pune

Builder: Divine Dynasty Group

Divine Dynasty Group has 1 registration on MahaRERA, including DIVINE NEST. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that DIVINE NEST shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DIVINE NEST is delayed beyond 7 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DIVINE NEST?

The registered promoter entity is Divine Dynasty Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DIVINE NEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DIVINE NEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DIVINE NEST?

The professionals named in the filing: Architect: Milind Gavali; Engineer: SHAILESH BABGONDA PATIL; Chartered Accountant: MRUDULA SANJAY JOSHI; Chartered Accountant: JOSHI AND RAYKAR CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DIVINE NEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DIVINE NEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DIVINE NEST to a free account