DHANANJAY HEIGHTS
RG-MH-05431 · RERA P99000051347 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DHANANJAY HEIGHTS is a Others project by REALTECH INFRA in Palghar, Maharashtra, registered with MahaRERA as P99000051347 on 8 Jun 2023. Possession is promised by 31 Dec 2027. 125 of the 228 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameDHANANJAY HEIGHTS
- TypeOthers
- Location
- Near Nagar Palika
- Village Nilemore
- Nallasopara West
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401203
- Pincode401203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000051347
- ReraGenie IDRG-MH-05431
Builder
- NameREALTECH INFRA
- Entity typePartnership
- GSTIN27ABFFR5264F1Z2
- PartnersMUJAHID IDRIS DHUKKA, MOHAMMAD YAKUB DAWA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jun 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DHANANJAY HEIGHTS | NA | 22 | 20 | 206 | 22 | 228 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.
DHANANJAY HEIGHTS: 63% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 55% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed160
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DHANANJAY RAJARAM RAUT | Vasai-Virar City (M Corp) | Palghar |
| SHREE GANESH BUILDER AND DEVELOPERS | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DHANANJAY HEIGHTS | NA | Rs 39.20 cr | Rs 25.48 cr |
| - | NA | Rs 2.10 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shree Consultant |
| Engineer | GR CONSULTANTS |
| Engineer | Kumar Kaushal Singh |
| Chartered Accountant | S LAKDAWALA AND ASSOCIATES |
| Chartered Accountant | MAA & COMPANY |
| Partner | Role in project |
|---|---|
| REALTECH INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Jan to Mar 2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Jan to Mar 2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Jan to Mar 26_11zon.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Oct to Dec 25.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Oct to Dec 2025.pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: Form 3-Oct to Dec 25_11zon (1).pdf | 5 Feb 2026 |
| Form 5 (FY 2024-2025)File: RI Form 5.pdf | 24 Nov 2025 |
| Withdrawal Update Form 1File: Form 1-Jul to Sep 25.pdf | 4 Nov 2025 |
| Withdrawal Update Form 2File: RI Form 2 Rera Format (July -Septmber 2025).pdf | 4 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Realtech infra Jul to Sep 2025_11zon.pdf | 4 Nov 2025 |
| Form 2A (FY 2024-2025)File: RI Form 2A (24-25).pdf | 20 Aug 2025 |
| Form 1File: Form 1.pdf | 18 Aug 2025 |
| Form 2File: Form 2.pdf | 18 Aug 2025 |
| Form 3File: Form 3.pdf | 18 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 18 Aug 2025 |
| Withdrawal Update Form 1File: Realtech Infra Form 1 ( April- June 2025).pdf | 18 Aug 2025 |
| Withdrawal Update Form 2File: Realtech Infra Form 2 (April - June 2025).pdf | 18 Aug 2025 |
| Withdrawal Update Form 3File: Form 3_ April to June 2025_11zon.pdf | 18 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 26 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf | 5 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RI Form 5_signed.pdf | 1 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Realtech Infra Form 1 (Oct 2024 - Dec 2024).pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Oct-Dec 24)_compressed.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realtech Infra Form 2 (October- December 2024).pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RI Sold Unsold (Oct- Dec 2024).pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Realtech Infra Jul to Sep 24.pdf | 4 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Realtech Infra Form 1 (July 2024 - Sep 2024).pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realtech Infra Form 2 (July- September 2024).pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: RI Sold Unsold (July- Sep 2024).pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (April- June 2024).pdf | 25 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (April - June 2024).pdf | 25 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: RI Sold Unsold Inventry (April 2024- June 2024).pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (April - June 2024).pdf | 25 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Realtech Infra Form 1 (Jan- March 2024).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realtech Infra Form 2 (Jan - March 2024).pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Realtech Infra Sold Unsold (Jan - March 2024).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Real Tech Infra Form 3 (Jan- March 2024).pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold _11zon.pdf | 13 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration April to June 23 .pdf | 13 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July to Sep 23.pdf | 13 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Oct to Dec 23 _11zon.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 .pdf | 9 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1-01-11-2023.pdf | 1 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Realtech Infra.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Realtech Infra Sold Unsold _compressed.pdf | 9 Aug 2023 |
| Other - TechnicalFile: Declaration for free amenities .pdf | 30 May 2023 |
| Layout approvalFile: Blue Print 1.pdf | 19 May 2023 |
| Layout approvalFile: Blue Print 2.pdf | 19 May 2023 |
| Layout approvalFile: Layout.pdf | 19 May 2023 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 19 May 2023 |
| Copy of Layout Approval (in case of layout)File: Blue Print 1.pdf | 19 May 2023 |
| Copy of Layout Approval (in case of layout)File: Blue Print 2.pdf | 19 May 2023 |
| Other - TechnicalFile: Blue Print 1.pdf | 19 May 2023 |
| Other - TechnicalFile: Blue Print 2.pdf | 19 May 2023 |
| Building plan approvalFile: Blue Print Sheet 1.pdf | 12 Apr 2023 |
| PAN CardFile: Pan Card.pdf | 12 Apr 2023 |
| Copy of the legal title reportFile: Title Report.pdf | 12 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration for Financial Encumbrance.pdf | 12 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration for Legal and Litigation.pdf | 12 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Declaration for Financial Encumbrance.pdf | 12 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Declaration for Legal and Litigation.pdf | 12 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Blue Print Sheet 1.pdf | 12 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 12 Apr 2023 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 12 Apr 2023 |
| Declaration in FORM BFile: Form B Realtech Infra.pdf | 12 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf | 12 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf | 12 Apr 2023 |
| CERSAI detailsFile: Declaration for CERSAI.pdf | 12 Apr 2023 |
| CERSAI detailsFile: CERSAI.pdf | 12 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 12 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Mohammad Dawa.pdf | 12 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Mujahid Dhukka.pdf | 12 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Shree Ganesh Builders.pdf | 12 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Dhananjay Raut.pdf | 12 Apr 2023 |
| Proforma of Agreement for saleFile: Draft Sale Agreement.pdf | 12 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DHANANJAY HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nallasopara West3,200+ in Palghar
Filed coordinates, straight-line distance. 225 registered projects within 2 km.
Sheetal Yash
DGS BUILDERS AND DEVELOPERS
DEEP SKYRISE
DEEP REALCON LLP
VIMAL CLASSIC
OM VIMAL DEVELOPERS
DHANANJAY HILL VIEW
DHANLAXMI DEVELOPERS
NAKSHATRA AURIS
RAJLAXMI JSB REALTY LLP
COMFORT HERITAGE
SAI RYDAM REAL ESTATE DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: REALTECH INFRA
REALTECH INFRA has 1 registration on MahaRERA, including DHANANJAY HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if DHANANJAY HEIGHTS is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DHANANJAY HEIGHTS?
The registered promoter entity is REALTECH INFRA, a partnership as per the filing. Its GSTIN 27ABFFR5264F1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DHANANJAY HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DHANANJAY HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DHANANJAY HEIGHTS?
The professionals named in the filing: Architect: Shree Consultant; Engineer: GR CONSULTANTS; Engineer: Kumar Kaushal Singh; Chartered Accountant: S LAKDAWALA AND ASSOCIATES; Chartered Accountant: MAA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DHANANJAY HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback