Devta Vision Sukhkarta Apartment
By Devta Vision Developers LLP
RG-MH-42540 · RERA P52000047683 · Last updated on MahaRERA portal: 24 Oct 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Devta Vision Sukhkarta Apartment is a Others project by Devta Vision Developers LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000047683 on 21 Nov 2022. Possession is promised by 4 Feb 2027. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 6 of the 39 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameDevta Vision Sukhkarta Apartment
- TypeOthers
- Location
- Plot No 295
- Sector 25
- Ulwe
- Ulawe
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000047683
- ReraGenie IDRG-MH-42540
Builder
- NameDevta Vision Developers LLP
- Entity typeOthers
- GSTIN27AARFD7316F1Z9
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Named personsShahajirao A Patil, Prakash A Patil, Vijay N Shirdhonkar, Rajendra N Shirdhonkar
- Other registrations1 more →
- Past their filed date1
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Nov 2022
- Promised completion4 Feb 2027
- Revised completionRevised to 4 Feb 2027 (originally 4 Oct 2026)
- Buildings1 building record
- Documents filed141 files
Current status
Figures as on 24 Oct 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Devta Vision Sukhkarta Apartment | NA | 8 | 8 | 35 | 4 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Devta Vision Sukhkarta Apartment: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Rohan Raju Koli | Navi Mumbai (M Corp.) | Thane |
| Mrs. Reshma Ranjeet Koli | Navi Mumbai (M Corp.) | Thane |
| Mstr Aryan Ranjeet Koli | Navi Mumbai (M Corp.) | Thane |
| Mrs. Rajeshri Navnath Koli | Navi Mumbai (M Corp.) | Thane |
| Mstr Bhavesh Navnath Koli | Navi Mumbai (M Corp.) | Thane |
| Ms Bhavika Navnath Koli | Navi Mumbai (M Corp.) | Thane |
| Mr Bhagwan Chandar Koli | Navi Mumbai (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Devta Vision Sukhkarta Apartment | NA | Rs 3.05 cr | Rs 3.05 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amit N Patil N Patil |
| Architect | Amit N Patil |
| Engineer | Abhinandan Ajit Desai Ajit Desai |
| Engineer | Ajit Desai |
| Chartered Accountant | Satish V Shanbhag V Shanbhag |
| Chartered Accountant | Satish V Shanbhag |
| Chartered Accountant | C A NITIN VARE |
| Partner | Role in project |
|---|---|
| Devta Vision Developers LLP | - |
Extensions1
A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.
Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 4 Feb 2027
Documents filed141
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2-A 31-03-2025.pdf | 24 Oct 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 31-03-2026 with OC.pdf | 24 Oct 2026 |
| Form 2A (FY 2026-2027)File: undertaking For Form 2-A 26-27.pdf | 24 Oct 2026 |
| Form 5 (FY 2024-2025)File: 295 OC.pdf | 24 Oct 2026 |
| Form 5 (FY 2025-2026)File: Undertaking of Form 5.pdf | 24 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 1File: Form-1 With undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 2File: Form-2 with Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Withdrawal Update Form 3File: Form-3 With Undertaking.pdf | 23 Oct 2026 |
| Form 2A (FY 2022-2023)File: form 2A (1).pdf | 23 Oct 2026 |
| Form 2A (FY 2023-2024)File: form 2A (3).pdf | 23 Oct 2026 |
| Form 5 (FY 2022-2023)File: Form -5 FY 2022-23 - CA annual report.pdf | 23 Oct 2026 |
| Form 5 (FY 2023-2024)File: Form -5 FY 2022-23 - CA annual report.pdf | 23 Oct 2026 |
| Form 1File: Form 1 31-12-2022.pdf | 22 Oct 2026 |
| Form 2File: Form 2 Up to 31-12-2022.pdf | 22 Oct 2026 |
| Form 3File: form-3 up to 31-03-2022.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold to 31-12-2022.pdf | 22 Oct 2026 |
| Form 1File: 295 SUKHKARTA FORM 1 up to 31-03-2023.pdf | 22 Oct 2026 |
| Form 2File: 295 SUKHKARTA FORM 2 up to 31-03-2023.pdf | 22 Oct 2026 |
| Form 3File: 295 SUKHKARTA FORM 3 up to 31-03-2023.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold.pdf | 22 Oct 2026 |
| Form 1File: Form 1 upto jun23.pdf | 22 Oct 2026 |
| Form 2File: Form 2 295 upto 30-06-2023.pdf | 22 Oct 2026 |
| Form 3File: form 3 upto 30-6-2023 pl 295.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold.pdf | 22 Oct 2026 |
| Form 1File: Form 1 295 uptoSept23.pdf | 22 Oct 2026 |
| Form 2File: Form 2 295 upto sept23.pdf | 22 Oct 2026 |
| Form 3File: Form 3 295 upto sept23.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold Entry up to Sep-23.pdf | 22 Oct 2026 |
| Form 1File: Form 1 plot 295 upto Dec 23.pdf | 22 Oct 2026 |
| Form 2File: Form 2 plot 295 upto Dec 23.pdf | 22 Oct 2026 |
| Form 3File: Form 3 plot 295 upto Dec 23.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold Entry for Uplaod Dec23.pdf | 22 Oct 2026 |
| Form 1File: Form 1 Plot 295 upto Mar 24.pdf | 22 Oct 2026 |
| Form 2File: Form 2 Up to March 24.pdf | 22 Oct 2026 |
| Form 3File: Form 3 Plot 295 upto Mar 24.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold Entry March-24.pdf | 22 Oct 2026 |
| Form 1File: Form 1 upto jun24.pdf | 22 Oct 2026 |
| Form 2File: Form 2 295 upto June 24.pdf | 22 Oct 2026 |
| Form 3File: Form 3 Plot 295 upto June 24.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold up to June-24.pdf | 22 Oct 2026 |
| Form 1File: Form 1 Upto Sept 24.PDF | 22 Oct 2026 |
| Form 2File: Form 2 Upto Sept 24.pdf | 22 Oct 2026 |
| Form 3File: Form 3 Upto Sept 24.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold Entry Sep-24.pdf | 22 Oct 2026 |
| Form 1File: Form -1 up to Dec-24.pdf | 22 Oct 2026 |
| Form 2File: form-2 up to Dec-24.pdf | 22 Oct 2026 |
| Form 3File: FORM-3 up to Dec-24.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold Dec-24.pdf | 22 Oct 2026 |
| Form 1File: Form 1 - Up to March-2025.pdf | 22 Oct 2026 |
| Form 2File: Form-2 - Up to march-25.pdf | 22 Oct 2026 |
| Form 3File: Form 3 - Up to March-25.pdf | 22 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: Plot 295 Unit Sold Unsold Up to March-2025.pdf | 22 Oct 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 295.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 295-25, Pushpak_Form1 .PDF | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sukhkarta_Plot 295_Q2_FY 24-25_Sign.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 295.pdf | 17 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 141 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Devta Vision Sukhkarta Apartment on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sector 25, Ulwe5,900+ in Raigarh
Filed coordinates, straight-line distance. 227 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Devta Vision Developers LLP
Devta Vision Developers LLP has 2 registrations on MahaRERA, including Devta Vision Sukhkarta Apartment and Devta Vision Ganaranga Paradise. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Devta Vision Sukhkarta Apartment is delayed beyond 4 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Devta Vision Sukhkarta Apartment?
The registered promoter entity is Devta Vision Developers LLP, an others as per the filing. Its GSTIN 27AARFD7316F1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Devta Vision Sukhkarta Apartment?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Devta Vision Sukhkarta Apartment?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Devta Vision Sukhkarta Apartment?
The professionals named in the filing: Architect: Amit N Patil N Patil; Architect: Amit N Patil; Engineer: Abhinandan Ajit Desai Ajit Desai; Engineer: Ajit Desai; Chartered Accountant: Satish V Shanbhag V Shanbhag; Chartered Accountant: Satish V Shanbhag. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Devta Vision Sukhkarta Apartment?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.